Quality Home Builders Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2016 to Aug 2026
- Last 24 months
- 14 permits filed
68 permits since 2000: 58 completed, 4 in progress, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
9 stairs permits: 8 completed, 1 never finaled. Typically 119 days from filing to permit and 176 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 24, 2024 | Completed final sign-off Oct 2024 | 2 Midcrest Wy | comply with nov #202315134. front stairs work - replace front stairs and landing in kind work onlyDetails
comply with nov #202315134. front stairs work - replace front stairs and landing in kind work only | $5,000 |
| Jul 27, 2023 | Completed final sign-off Dec 2023 | 1850 17th Av | replace approx. 30 feet of brick footing at south side of building; replace front stairs in kind;Details
replace approx. 30 feet of brick footing at south side of building; replace front stairs in kind; | $20,000 |
| Oct 28, 2022 | Completed final sign-off Mar 2025 | 501 Gates St | to correct work identified in nov 202293841, including to repair e an (e) car port, to rebuild an (e) dry rot stairway. repairs less than 50%Details
to correct work identified in nov 202293841, including to repair e an (e) car port, to rebuild an (e) dry rot stairway. repairs less than 50% | $81,000 |
| Aug 3, 2022 | Completed final sign-off Oct 2022 | 643 Masonic Av | replace dry rot wood siding (in kind approx. 100sf). replace in kind (2) posts, (2) concrete pair on back of house. replace (4) steps of dry rot on side of stair case (less thank 50%). replace 3 windows (not facing street) u=.30max.Details
replace dry rot wood siding (in kind approx. 100sf). replace in kind (2) posts, (2) concrete pair on back of house. replace (4) steps of dry rot on side of stair case (less thank 50%). replace 3 windows (not facing street) u=.30max. | $15,000 |
| Jul 12, 2018 | Completed final sign-off May 2020 | 120 Fernwood Dr | create new habitable space at lower level new bedroom, new bathroom, reframe existing interior stairs. replace existing wood burning fire place with gas fire placeDetails
create new habitable space at lower level new bedroom, new bathroom, reframe existing interior stairs. replace existing wood burning fire place with gas fire place | $100,000 |
| Feb 23, 2018 | Never finaled issued Sep 2018, no final | 100 Laguna St | add one adu(387 sf) @ ground fl per ord# 162-16. renovate 2 (e) ground fl units and storage area due to seismic retrofit pa#201608316430; renovate (e) rear stairs from 2nd fl to 1st fl. renovate (e) corridor. lower 8" fl to obtain 7ft.Details
add one adu(387 sf) @ ground fl per ord# 162-16. renovate 2 (e) ground fl units and storage area due to seismic retrofit pa#201608316430; renovate (e) rear stairs from 2nd fl to 1st fl. renovate (e) corridor. lower 8" fl to obtain 7ft. | $150,000 |
| Oct 16, 2017 | Completed final sign-off Oct 2017 | 722 Parnassus Av | add more 1x6 broad on outside of side stair case guardrail, & install new hand rail, replace rotten broad on back stair landing & install new handrail to extend hte dyer vents. repair less than 50%Details
add more 1x6 broad on outside of side stair case guardrail, & install new hand rail, replace rotten broad on back stair landing & install new handrail to extend hte dyer vents. repair less than 50% | $3,900 |
| Aug 4, 2017 | Completed final sign-off Mar 2021 | 20 Navajo Av | add unit on 1st floor per ordinance# 95-17. (2 bedrooms, kitchen, living & 1 bath) horizontal addition @ rear east side. new stair from 2nd floor to 1st floor. new bathroom on 2nd floor. enclose lightwell.Details
add unit on 1st floor per ordinance# 95-17. (2 bedrooms, kitchen, living & 1 bath) horizontal addition @ rear east side. new stair from 2nd floor to 1st floor. new bathroom on 2nd floor. enclose lightwell. | $85,000 |
| May 6, 2016 | Completed final sign-off May 2019 | 120 Fernwood Dr | replace exterior stair rail, drainage at rear of house. replace siding and replace 2 windowsDetails
replace exterior stair rail, drainage at rear of house. replace siding and replace 2 windows | $25,000 |