Back to bathroom remodel contractors
Quality Home Builders Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2016 to Aug 2026
- Last 24 months
- 14 permits filed
68 permits since 2000: 58 completed, 4 in progress, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
22 bathroom remodel permits: 19 completed, 1 in progress, 2 never finaled. Typically 2 days from filing to permit and 183 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 7, 2025 | Completed final sign-off Feb 2026 | 1831 27th Av | 1/f: remodel bedrooms, relocate washer/dryer. add 1 bath, kitchenette, & media room. replace siding at rear.Details
1/f: remodel bedrooms, relocate washer/dryer. add 1 bath, kitchenette, & media room. replace siding at rear. | $78,000 |
| Apr 17, 2025 | Completed final sign-off Aug 2025 | 628 Noriega St | kitchen & 2 bathrooms remodeling. all work in-kind. no structural or layout changes.Details
kitchen & 2 bathrooms remodeling. all work in-kind. no structural or layout changes. | $65,000 |
| Dec 2, 2024 | In progress issued Dec 2024 | 1831 27th Av | 2/f: remodel kitchen & (2) bathrooms. replace wall finishes w/ 5/8" type "x" gyp.bd.Details
2/f: remodel kitchen & (2) bathrooms. replace wall finishes w/ 5/8" type "x" gyp.bd. | $50,000 |
| Nov 12, 2024 | Completed final sign-off Dec 2024 | 2087 42nd Av | 2nd floor: bathroom remodel. in-kind. replace fixtures in-kind bathroom remodel. no moving walls. all fixtures to remain in the same location. approx. 35 sq. ft.Details
2nd floor: bathroom remodel. in-kind. replace fixtures in-kind bathroom remodel. no moving walls. all fixtures to remain in the same location. approx. 35 sq. ft. | $9,500 |
| Nov 8, 2024 | Completed final sign-off Aug 2025 | 1571 Shrader St | revision to 202408017732. remove unauthorized bathroom and change to storage to comply with 202287030, 202288455Details
revision to 202408017732. remove unauthorized bathroom and change to storage to comply with 202287030, 202288455 | |
| Jul 1, 2024 | Completed final sign-off Dec 2024 | 258 Surrey St | one bathroom remodel, replace old fixtures: tile, bathtub turn into shower.Details
one bathroom remodel, replace old fixtures: tile, bathtub turn into shower. | $16,000 |
| Dec 5, 2023 | Completed final sign-off Nov 2024 | 84 Huntington Dr | 1st/f: remodel bath. add family, 1 bedroom & half bath. 2nd/f: remodel kitchen & bath. add 1 full bath. 4 new skylights. add 208 sf new habitable spaceDetails
1st/f: remodel bath. add family, 1 bedroom & half bath. 2nd/f: remodel kitchen & bath. add 1 full bath. 4 new skylights. add 208 sf new habitable space | $165,000 |
| Aug 11, 2022 | Completed final sign-off Jan 2023 | 643 Masonic Av | remodel (e) bathroom & reconfigure plumbing fixturse in both units. no changes to plumbing fixtures locations.Details
remodel (e) bathroom & reconfigure plumbing fixturse in both units. no changes to plumbing fixtures locations. | $20,000 |
| Aug 3, 2022 | Never finaled issued Nov 2022, no final | 1334 09th Av | remodel (e) kitchen , bathroom. convert (e) half bathroom to full bathroom & replace (e) sheetrock w/ new. all work at 2nd floor. add insulation to exterior wall.Details
remodel (e) kitchen , bathroom. convert (e) half bathroom to full bathroom & replace (e) sheetrock w/ new. all work at 2nd floor. add insulation to exterior wall. | $54,000 |
| May 2, 2022 | Completed final sign-off Aug 2022 | 235 Montecito Av | interior remodel of 2nd floor bathDetails
interior remodel of 2nd floor bath | $7,000 |
| Oct 18, 2021 | Completed final sign-off Jan 2022 | 20 Crestline Dr | #11. kitchen and bath remodel. replace cabinets, countertop replace bath tub, faucets, tile, vanity and top. no structural work. no wall modification.Details
#11. kitchen and bath remodel. replace cabinets, countertop replace bath tub, faucets, tile, vanity and top. no structural work. no wall modification. | $23,000 |
| Sep 29, 2021 | Completed final sign-off May 2022 | 109 Willard North St | unit 109 & 111: kitchen and bathroom remodels. replace cabinets and countertop, bathrooms both unit bath tub change to shower. replace 1 window in bathroom unit 111. replacement fenestration max u-factor = 0.40.Details
unit 109 & 111: kitchen and bathroom remodels. replace cabinets and countertop, bathrooms both unit bath tub change to shower. replace 1 window in bathroom unit 111. replacement fenestration max u-factor = 0.40. | $125,000 |
| May 6, 2021 | Completed final sign-off Dec 2021 | 1309 Hayes St | interior remodel of unit 1309 hayes street only: add 1 full bathroom, 1 shower room and one powder room to unit 1309. replace (e) windows in dining, kitchen, bedroom with like to like condition to unit 1309, not visable to street.Details
interior remodel of unit 1309 hayes street only: add 1 full bathroom, 1 shower room and one powder room to unit 1309. replace (e) windows in dining, kitchen, bedroom with like to like condition to unit 1309, not visable to street. | $22,000 |
| Jan 19, 2021 | Completed final sign-off Sep 2024 | 2219 12th Av | project proposes dividing (e) 1/f master suite into 2 bedrooms & 1 half bath. 1/f horizontal addition for new master suite with new roof deck above application for planning approval. building department submittal shall be deferred under separate permitDetails
project proposes dividing (e) 1/f master suite into 2 bedrooms & 1 half bath. 1/f horizontal addition for new master suite with new roof deck above application for planning approval. building department submittal shall be deferred under separate permit | $110,000 |
| Oct 17, 2020 | Completed final sign-off Dec 2021 | 1415 Silver Av | 1/f: add 1 full bathroom , den, home office & family. 2/f: remodel kitchen, add 1 bedroom and full bathroom. replace all front windows with in-kind alum clad wood. infill lightwell.Details
1/f: add 1 full bathroom , den, home office & family. 2/f: remodel kitchen, add 1 bedroom and full bathroom. replace all front windows with in-kind alum clad wood. infill lightwell. | $70,000 |
| Aug 6, 2019 | Completed final sign-off Nov 2019 | 8 Ramona Av | kitchen remodeling, cabinets, countertops; 1 & 1/2 bathrooms remodeling, replace w/new bathtub, sink, faucets, toilets, & tiles.Details
kitchen remodeling, cabinets, countertops; 1 & 1/2 bathrooms remodeling, replace w/new bathtub, sink, faucets, toilets, & tiles. | $53,000 |
| Apr 15, 2019 | Completed final sign-off Jun 2019 | 2389 39th Av | kitchen and bathroom remodel. work at 2389 39th ave.Details
kitchen and bathroom remodel. work at 2389 39th ave. | $22,000 |
| Jul 12, 2018 | Completed final sign-off May 2020 | 120 Fernwood Dr | create new habitable space at lower level new bedroom, new bathroom, reframe existing interior stairs. replace existing wood burning fire place with gas fire placeDetails
create new habitable space at lower level new bedroom, new bathroom, reframe existing interior stairs. replace existing wood burning fire place with gas fire place | $100,000 |
| Feb 12, 2018 | Completed final sign-off Jun 2018 | 463 35th Av | both units - kitchens & bathrooms remodel- replace kitchen cabinets, counter tops. both bathrroms replace new fixtures, faucets, vanities, toilets , tiles.Details
both units - kitchens & bathrooms remodel- replace kitchen cabinets, counter tops. both bathrroms replace new fixtures, faucets, vanities, toilets , tiles. | $40,000 |
| Nov 7, 2017 | Completed final sign-off Apr 2018 | 2234 38th Av | remodel e bedrooms, add master bath, remodel reconfigure e kitchen. replace e bath, plumbing fixturesDetails
remodel e bedrooms, add master bath, remodel reconfigure e kitchen. replace e bath, plumbing fixtures | $20,000 |
| Aug 4, 2017 | Completed final sign-off Mar 2021 | 20 Navajo Av | add unit on 1st floor per ordinance# 95-17. (2 bedrooms, kitchen, living & 1 bath) horizontal addition @ rear east side. new stair from 2nd floor to 1st floor. new bathroom on 2nd floor. enclose lightwell.Details
add unit on 1st floor per ordinance# 95-17. (2 bedrooms, kitchen, living & 1 bath) horizontal addition @ rear east side. new stair from 2nd floor to 1st floor. new bathroom on 2nd floor. enclose lightwell. | $85,000 |
| Apr 20, 2017 | Never finaled issued Apr 2017, no final | 1115 Gilman Av | remove wall and ceiling finishes, insulation, new sheetrock throughout the house, remodel kitchen, new cabinets and counter tops, remodel bathroom, no structural work, change lighting fixtures. electrical and plumbing under seperate permit.Details
remove wall and ceiling finishes, insulation, new sheetrock throughout the house, remodel kitchen, new cabinets and counter tops, remodel bathroom, no structural work, change lighting fixtures. electrical and plumbing under seperate permit. | $35,000 |