Back to kitchen remodel contractors
Quality General Construction Co Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2014 to Sep 2026
- Last 24 months
- 8 permits filed
54 permits since 2000: 37 completed, 6 in progress, 8 never finaled, 3 expired or cancelled.
Of the 8 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
24 kitchen remodel permits: 16 completed, 5 in progress, 3 never finaled. Typically 12 days from filing to permit and 194 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 17, 2026 | In progress issued Sep 2026 | 1414 38th Av | 3/f (unit#1416) - remove fireplace, provide new bath and closet. remodel (e) kitchen. 2/f (unit# 1414) - remove fire place.Details
3/f (unit#1416) - remove fireplace, provide new bath and closet. remodel (e) kitchen. 2/f (unit# 1414) - remove fire place. | $60,000 |
| Apr 23, 2026 | In progress issued Apr 2026 | 175 Putnam St | remodel upstairs one bathroom, converting tub to shower pan, remodel kitchen, upgrade electrical upstairs, and new 100 amp panel.Details
remodel upstairs one bathroom, converting tub to shower pan, remodel kitchen, upgrade electrical upstairs, and new 100 amp panel. | $42,000 |
| Jan 20, 2026 | In progress issued Apr 2026 | 1471 22nd Av | relocate (e) kitchen, bathroom. add1 new bathroom & re-built interior stair at 2/f. construct 1 bedtoom, 2 full bath, family room, & install wetbar at g/f. construct new deck w/ staircase at rear of house (10.4'x8').Details
relocate (e) kitchen, bathroom. add1 new bathroom & re-built interior stair at 2/f. construct 1 bedtoom, 2 full bath, family room, & install wetbar at g/f. construct new deck w/ staircase at rear of house (10.4'x8'). | $363,000 |
| Oct 7, 2025 | Completed final sign-off Mar 2026 | 1791 46th Av | remodel upstairs: one bathroom and kitchen. upgrade upstairs electrical. replace new furnace. same layout for bathroom. change tub to shower.Details
remodel upstairs: one bathroom and kitchen. upgrade upstairs electrical. replace new furnace. same layout for bathroom. change tub to shower. | $5,000 |
| Aug 13, 2025 | In progress issued Aug 2025 | 587 Sanchez St | interior remodel with new kitchen and bathroom, powder room, finishes and replace existing window in-kind. no change in street facing elevationDetails
interior remodel with new kitchen and bathroom, powder room, finishes and replace existing window in-kind. no change in street facing elevation | $96,000 |
| Aug 8, 2025 | In progress issued Apr 2026 | 2114 22nd Av | relocate water heater, furnance, washer dryer in garage. reconfig existing kitchen, build partition wall on 2nd fl. build kitchenette,1 bath, 1 bdrm, on 1st fl. comply with nov 202536747Details
relocate water heater, furnance, washer dryer in garage. reconfig existing kitchen, build partition wall on 2nd fl. build kitchenette,1 bath, 1 bdrm, on 1st fl. comply with nov 202536747 | $100,000 |
| Sep 24, 2024 | Completed final sign-off May 2026 | 3833 Lincoln Wy | legalize as-built bedroom, family room, bathroom, & play room on 1/f. remodel (e) kitchen, dining, common bathroom, & master suite on 2/f. replacing (e) windows like-in-kind with original.Details
legalize as-built bedroom, family room, bathroom, & play room on 1/f. remodel (e) kitchen, dining, common bathroom, & master suite on 2/f. replacing (e) windows like-in-kind with original. | $100,000 |
| Mar 12, 2024 | Completed final sign-off Aug 2024 | 26 Lee Av | remodel a bathroom and kitchen upstairs. same layout convert tub to shower pan.Details
remodel a bathroom and kitchen upstairs. same layout convert tub to shower pan. | $20,000 |
| Nov 16, 2022 | Completed final sign-off Oct 2023 | 1915 29th Av | remove partial (e) wall. re-arrange (e) bathroom. replace (e) sliding door w/ new window & install (n) kitchenette. all work on g/f.Details
remove partial (e) wall. re-arrange (e) bathroom. replace (e) sliding door w/ new window & install (n) kitchenette. all work on g/f. | $32,000 |
| Jul 29, 2022 | Completed final sign-off Nov 2022 | 2487 22nd Av | remodel upstairs bathroom. converting bathtub to shower, same layout. remodel kitchen upstairs. update electrical upstairs.Details
remodel upstairs bathroom. converting bathtub to shower, same layout. remodel kitchen upstairs. update electrical upstairs. | $35,000 |
| Jul 28, 2022 | Completed final sign-off May 2023 | 1883 33rd Av | add a full bath on 2nd fl. add media, 2 bedrooms, a full bath. add kitchenette with refrigerator, sink, hood & 2 burners stove. no oven on 1st fl. replace/ relocate water heaters & furnace. upgrade electrical & plumbing system.Details
add a full bath on 2nd fl. add media, 2 bedrooms, a full bath. add kitchenette with refrigerator, sink, hood & 2 burners stove. no oven on 1st fl. replace/ relocate water heaters & furnace. upgrade electrical & plumbing system. | $80,000 |
| Jan 6, 2022 | Completed final sign-off Jul 2022 | 7020 Geary Bl | comply w/ compaint #202184568: legalize (e) bedroom & media room. convert (e) half bathroom into full bathroom, & add kitchentte. all work at g/f.Details
comply w/ compaint #202184568: legalize (e) bedroom & media room. convert (e) half bathroom into full bathroom, & add kitchentte. all work at g/f. | $42,000 |
| Dec 3, 2021 | Completed final sign-off Jan 2022 | 1883 33rd Av | remodel bathroom, convert bathtub to shower same layout. remodel kitchen with same layout.Details
remodel bathroom, convert bathtub to shower same layout. remodel kitchen with same layout. | $19,000 |
| Jun 21, 2021 | Never finaled issued Jun 2021, no final | 1927 Lake St | remodel kitchen and bathrooms (same layout). upgrade main electrical panel to 200 amps (like for like)Details
remodel kitchen and bathrooms (same layout). upgrade main electrical panel to 200 amps (like for like) | $22,000 |
| May 31, 2019 | Completed final sign-off Jan 2020 | 1582 46th Av | revision to pa 2019-0314-5208 to rconfigure interior layout for 2nd fl; switch location of bathroom and bedroom. add peninsula to the kitchen. install new lightingsDetails
revision to pa 2019-0314-5208 to rconfigure interior layout for 2nd fl; switch location of bathroom and bedroom. add peninsula to the kitchen. install new lightings | $8,000 |
| May 20, 2019 | Completed final sign-off Sep 2019 | 55 Navajo Av | remodel (e) kitchen & bath. add 1 (n) bath. upgrade partial ceiling framing & install one 3'x3' skylight. partial wall removal at dining area. all work at 2nd flr.Details
remodel (e) kitchen & bath. add 1 (n) bath. upgrade partial ceiling framing & install one 3'x3' skylight. partial wall removal at dining area. all work at 2nd flr. | $42,000 |
| Apr 4, 2019 | Completed final sign-off Apr 2020 | 250 Cayuga Av | interior remodel: add new bathroom at 2nd floor, remodel existing kitchen and bathroom at 2nd floor.Details
interior remodel: add new bathroom at 2nd floor, remodel existing kitchen and bathroom at 2nd floor. | $45,000 |
| Mar 14, 2019 | Completed final sign-off Jan 2020 | 1582 46th Av | 2/f: remove wall between kitchen & living room. rmeodel kitchen. enclose front porch area and relocate front entry door.Details
2/f: remove wall between kitchen & living room. rmeodel kitchen. enclose front porch area and relocate front entry door. | $18,000 |
| Nov 28, 2018 | Completed final sign-off May 2019 | 665 18th Av | remodel kitchen and bathroom. same layout. no wall modification. no structural work.Details
remodel kitchen and bathroom. same layout. no wall modification. no structural work. | $20,000 |
| May 31, 2018 | Completed final sign-off Apr 2019 | 1619 29th Av | develop gr fl accessory rms, 1 bdrm, 1 bath, family rm, office room, storage laundry. new stair to fam rm. 1 car park maintained,extend partial e s lightwell to grd. 4x4 not visible, remodel 2 baths, add 1/2 bath upstairs,open walls in kitchen, add new beams. change wndws/drsDetails
develop gr fl accessory rms, 1 bdrm, 1 bath, family rm, office room, storage laundry. new stair to fam rm. 1 car park maintained,extend partial e s lightwell to grd. 4x4 not visible, remodel 2 baths, add 1/2 bath upstairs,open walls in kitchen, add new beams. change wndws/drs | $95,000 |
| Mar 12, 2018 | Never finaled issued Mar 2018, no final | 1619 29th Av | kitchen remodel, in kind. no change to walls, doors or openingsDetails
kitchen remodel, in kind. no change to walls, doors or openings | $15,000 |
| Oct 4, 2017 | Completed final sign-off Jul 2018 | 1493 46th Av | remodel (e) kitchen, convert bedroom to dining room on 2nd floorDetails
remodel (e) kitchen, convert bedroom to dining room on 2nd floor | $16,000 |
| Jun 26, 2017 | Completed final sign-off Jun 2018 | 663 18th Av | relocate (e) kitchen, convert (e) kitchen space to new bedroom, bathroom & upgrade partial (e) 3rd floor ceiling. all work at third floor. interior demo less than 75%. no work to exterior.Details
relocate (e) kitchen, convert (e) kitchen space to new bedroom, bathroom & upgrade partial (e) 3rd floor ceiling. all work at third floor. interior demo less than 75%. no work to exterior. | $45,000 |
| Aug 15, 2014 | Never finaled issued Sep 2015, no final | 15 25th North Av | alteration, remodel & 85 sf addition to (e) residence. scope includes a reduction in bldg height w/partial demo of 2nd fl, addition of a new roof over remaining 1st fl, facade changes w/new doors & windows, contruction of a new interior stairwell & the interior remodel incl 1 kitchen & 2.5 baths.Details
alteration, remodel & 85 sf addition to (e) residence. scope includes a reduction in bldg height w/partial demo of 2nd fl, addition of a new roof over remaining 1st fl, facade changes w/new doors & windows, contruction of a new interior stairwell & the interior remodel incl 1 kitchen & 2.5 baths. | $700,000 |