Back to bathroom remodel contractors
Quality General Construction Co Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2014 to Sep 2026
- Last 24 months
- 8 permits filed
54 permits since 2000: 37 completed, 6 in progress, 8 never finaled, 3 expired or cancelled.
Of the 8 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
34 bathroom remodel permits: 25 completed, 6 in progress, 2 never finaled, 1 expired or cancelled. Typically 10 days from filing to permit and 204 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 17, 2026 | In progress issued Sep 2026 | 1414 38th Av | 3/f (unit#1416) - remove fireplace, provide new bath and closet. remodel (e) kitchen. 2/f (unit# 1414) - remove fire place.Details
3/f (unit#1416) - remove fireplace, provide new bath and closet. remodel (e) kitchen. 2/f (unit# 1414) - remove fire place. | $60,000 |
| Aug 3, 2026 | In progress issued Aug 2026 | 1471 22nd Av | revision to #202601204119: relocate bathroom & construct 2 3x3 skylight at 2/f. enlarged deck to 4 ft more at rear of house (14x12x9).Details
revision to #202601204119: relocate bathroom & construct 2 3x3 skylight at 2/f. enlarged deck to 4 ft more at rear of house (14x12x9). | $11,000 |
| Apr 23, 2026 | In progress issued Apr 2026 | 175 Putnam St | remodel upstairs one bathroom, converting tub to shower pan, remodel kitchen, upgrade electrical upstairs, and new 100 amp panel.Details
remodel upstairs one bathroom, converting tub to shower pan, remodel kitchen, upgrade electrical upstairs, and new 100 amp panel. | $42,000 |
| Jan 20, 2026 | In progress issued Apr 2026 | 1471 22nd Av | relocate (e) kitchen, bathroom. add1 new bathroom & re-built interior stair at 2/f. construct 1 bedtoom, 2 full bath, family room, & install wetbar at g/f. construct new deck w/ staircase at rear of house (10.4'x8').Details
relocate (e) kitchen, bathroom. add1 new bathroom & re-built interior stair at 2/f. construct 1 bedtoom, 2 full bath, family room, & install wetbar at g/f. construct new deck w/ staircase at rear of house (10.4'x8'). | $363,000 |
| Oct 7, 2025 | Completed final sign-off Mar 2026 | 1791 46th Av | remodel upstairs: one bathroom and kitchen. upgrade upstairs electrical. replace new furnace. same layout for bathroom. change tub to shower.Details
remodel upstairs: one bathroom and kitchen. upgrade upstairs electrical. replace new furnace. same layout for bathroom. change tub to shower. | $5,000 |
| Aug 13, 2025 | In progress issued Aug 2025 | 587 Sanchez St | interior remodel with new kitchen and bathroom, powder room, finishes and replace existing window in-kind. no change in street facing elevationDetails
interior remodel with new kitchen and bathroom, powder room, finishes and replace existing window in-kind. no change in street facing elevation | $96,000 |
| Aug 8, 2025 | In progress issued Apr 2026 | 2114 22nd Av | relocate water heater, furnance, washer dryer in garage. reconfig existing kitchen, build partition wall on 2nd fl. build kitchenette,1 bath, 1 bdrm, on 1st fl. comply with nov 202536747Details
relocate water heater, furnance, washer dryer in garage. reconfig existing kitchen, build partition wall on 2nd fl. build kitchenette,1 bath, 1 bdrm, on 1st fl. comply with nov 202536747 | $100,000 |
| Jan 15, 2025 | Expired or cancelled expired Sep 2026 | 26 Lee Av | convert partial of exisiting garage to be gym and one bathroom, are:343 sq ft.remodel existing bathroom.Details
convert partial of exisiting garage to be gym and one bathroom, are:343 sq ft.remodel existing bathroom. | $30,000 |
| Sep 24, 2024 | Completed final sign-off May 2026 | 3833 Lincoln Wy | legalize as-built bedroom, family room, bathroom, & play room on 1/f. remodel (e) kitchen, dining, common bathroom, & master suite on 2/f. replacing (e) windows like-in-kind with original.Details
legalize as-built bedroom, family room, bathroom, & play room on 1/f. remodel (e) kitchen, dining, common bathroom, & master suite on 2/f. replacing (e) windows like-in-kind with original. | $100,000 |
| Mar 12, 2024 | Completed final sign-off Aug 2024 | 26 Lee Av | remodel a bathroom and kitchen upstairs. same layout convert tub to shower pan.Details
remodel a bathroom and kitchen upstairs. same layout convert tub to shower pan. | $20,000 |
| Feb 7, 2023 | Completed final sign-off Nov 2023 | 587 47th Av | remodel kitcen and bath @ upper leve w/ new finishes & fixtures. new door & window replacement @ indoor lightwell (not visible from st). new window sash replacement @ front (existing window frame & trim not change)Details
remodel kitcen and bath @ upper leve w/ new finishes & fixtures. new door & window replacement @ indoor lightwell (not visible from st). new window sash replacement @ front (existing window frame & trim not change) | $72,500 |
| Dec 2, 2022 | Completed final sign-off Jan 2023 | 2211 47th Av | remodel upstairs bathroom same layout.Details
remodel upstairs bathroom same layout. | $11,000 |
| Nov 16, 2022 | Completed final sign-off Oct 2023 | 1915 29th Av | remove partial (e) wall. re-arrange (e) bathroom. replace (e) sliding door w/ new window & install (n) kitchenette. all work on g/f.Details
remove partial (e) wall. re-arrange (e) bathroom. replace (e) sliding door w/ new window & install (n) kitchenette. all work on g/f. | $32,000 |
| Jul 29, 2022 | Completed final sign-off Nov 2022 | 2487 22nd Av | remodel upstairs bathroom. converting bathtub to shower, same layout. remodel kitchen upstairs. update electrical upstairs.Details
remodel upstairs bathroom. converting bathtub to shower, same layout. remodel kitchen upstairs. update electrical upstairs. | $35,000 |
| Jul 28, 2022 | Completed final sign-off May 2023 | 1883 33rd Av | add a full bath on 2nd fl. add media, 2 bedrooms, a full bath. add kitchenette with refrigerator, sink, hood & 2 burners stove. no oven on 1st fl. replace/ relocate water heaters & furnace. upgrade electrical & plumbing system.Details
add a full bath on 2nd fl. add media, 2 bedrooms, a full bath. add kitchenette with refrigerator, sink, hood & 2 burners stove. no oven on 1st fl. replace/ relocate water heaters & furnace. upgrade electrical & plumbing system. | $80,000 |
| Jan 6, 2022 | Completed final sign-off Jul 2022 | 7020 Geary Bl | comply w/ compaint #202184568: legalize (e) bedroom & media room. convert (e) half bathroom into full bathroom, & add kitchentte. all work at g/f.Details
comply w/ compaint #202184568: legalize (e) bedroom & media room. convert (e) half bathroom into full bathroom, & add kitchentte. all work at g/f. | $42,000 |
| Dec 3, 2021 | Completed final sign-off Jan 2022 | 1883 33rd Av | remodel bathroom, convert bathtub to shower same layout. remodel kitchen with same layout.Details
remodel bathroom, convert bathtub to shower same layout. remodel kitchen with same layout. | $19,000 |
| Jun 21, 2021 | Never finaled issued Jun 2021, no final | 1927 Lake St | remodel kitchen and bathrooms (same layout). upgrade main electrical panel to 200 amps (like for like)Details
remodel kitchen and bathrooms (same layout). upgrade main electrical panel to 200 amps (like for like) | $22,000 |
| Dec 29, 2020 | Completed final sign-off Oct 2021 | 325 Louisburg St | on 1st fl: add 2 bedrooms, 3 full bath, 1 office and 1 media roomDetails
on 1st fl: add 2 bedrooms, 3 full bath, 1 office and 1 media room | $30,000 |
| Jun 20, 2019 | Completed final sign-off Apr 2020 | 250 Cayuga Av | interior remodel add 2 new bedrooms, 2 baths, mud storage at gr flDetails
interior remodel add 2 new bedrooms, 2 baths, mud storage at gr fl | $100,000 |
| May 31, 2019 | Completed final sign-off Jan 2020 | 1582 46th Av | revision to pa 2019-0314-5208 to rconfigure interior layout for 2nd fl; switch location of bathroom and bedroom. add peninsula to the kitchen. install new lightingsDetails
revision to pa 2019-0314-5208 to rconfigure interior layout for 2nd fl; switch location of bathroom and bedroom. add peninsula to the kitchen. install new lightings | $8,000 |
| May 20, 2019 | Completed final sign-off Sep 2019 | 55 Navajo Av | remodel (e) kitchen & bath. add 1 (n) bath. upgrade partial ceiling framing & install one 3'x3' skylight. partial wall removal at dining area. all work at 2nd flr.Details
remodel (e) kitchen & bath. add 1 (n) bath. upgrade partial ceiling framing & install one 3'x3' skylight. partial wall removal at dining area. all work at 2nd flr. | $42,000 |
| Apr 4, 2019 | Completed final sign-off Apr 2020 | 250 Cayuga Av | interior remodel: add new bathroom at 2nd floor, remodel existing kitchen and bathroom at 2nd floor.Details
interior remodel: add new bathroom at 2nd floor, remodel existing kitchen and bathroom at 2nd floor. | $45,000 |
| Dec 10, 2018 | Completed final sign-off Apr 2019 | 500 Peralta Av | remodel bathroom: convert tub to shower pan. no walls moved, added or infilled, all existing layouts to remain unchanged.Details
remodel bathroom: convert tub to shower pan. no walls moved, added or infilled, all existing layouts to remain unchanged. | $12,000 |
| Nov 28, 2018 | Completed final sign-off May 2019 | 665 18th Av | remodel kitchen and bathroom. same layout. no wall modification. no structural work.Details
remodel kitchen and bathroom. same layout. no wall modification. no structural work. | $20,000 |
| May 31, 2018 | Completed final sign-off Apr 2019 | 1619 29th Av | develop gr fl accessory rms, 1 bdrm, 1 bath, family rm, office room, storage laundry. new stair to fam rm. 1 car park maintained,extend partial e s lightwell to grd. 4x4 not visible, remodel 2 baths, add 1/2 bath upstairs,open walls in kitchen, add new beams. change wndws/drsDetails
develop gr fl accessory rms, 1 bdrm, 1 bath, family rm, office room, storage laundry. new stair to fam rm. 1 car park maintained,extend partial e s lightwell to grd. 4x4 not visible, remodel 2 baths, add 1/2 bath upstairs,open walls in kitchen, add new beams. change wndws/drs | $95,000 |
| Mar 2, 2018 | Completed final sign-off Jul 2018 | 1493 46th Av | remodel bathrooms (1.5) same layoutDetails
remodel bathrooms (1.5) same layout | $15,000 |
| Nov 30, 2017 | Completed final sign-off Jan 2018 | 17 Sears St | convert (e) closet to be a full bathroom at 2nd floorDetails
convert (e) closet to be a full bathroom at 2nd floor | $10,000 |
| Sep 12, 2017 | Completed final sign-off Feb 2018 | 943 Goettingen St | two new bedrooms with one full bathroom to be constructed at ground floor.(in compliance of nov#200904365). replace (e) plumbing fixture at 2nd floor bathroom.Details
two new bedrooms with one full bathroom to be constructed at ground floor.(in compliance of nov#200904365). replace (e) plumbing fixture at 2nd floor bathroom. | $36,000 |
| Jun 26, 2017 | Completed final sign-off Jun 2018 | 663 18th Av | relocate (e) kitchen, convert (e) kitchen space to new bedroom, bathroom & upgrade partial (e) 3rd floor ceiling. all work at third floor. interior demo less than 75%. no work to exterior.Details
relocate (e) kitchen, convert (e) kitchen space to new bedroom, bathroom & upgrade partial (e) 3rd floor ceiling. all work at third floor. interior demo less than 75%. no work to exterior. | $45,000 |
| Feb 3, 2017 | Completed final sign-off Dec 2017 | 2463 31st Av | infill the e 2nd fl lightwell. relocate bath at 2nd fl. remove interior wall at 2nd fl. provide new post and post ftg at 1st flDetails
infill the e 2nd fl lightwell. relocate bath at 2nd fl. remove interior wall at 2nd fl. provide new post and post ftg at 1st fl | $35,000 |
| Dec 30, 2016 | Completed final sign-off Apr 2019 | 500 Peralta Av | 2-story rear addition incl 1 family at grd floor & 1 new bedroom at 2/fl, 1 new bedroom & library, 1 bath to be constructed at (e) ground floor.Details
2-story rear addition incl 1 family at grd floor & 1 new bedroom at 2/fl, 1 new bedroom & library, 1 bath to be constructed at (e) ground floor. | $100,000 |
| Mar 4, 2016 | Completed final sign-off Oct 2016 | 1020 Santiago St | two new bedrooms, one media room & bathroom to be constructed at ground floor per plan.Details
two new bedrooms, one media room & bathroom to be constructed at ground floor per plan. | $50,000 |
| Aug 15, 2014 | Never finaled issued Sep 2015, no final | 15 25th North Av | alteration, remodel & 85 sf addition to (e) residence. scope includes a reduction in bldg height w/partial demo of 2nd fl, addition of a new roof over remaining 1st fl, facade changes w/new doors & windows, contruction of a new interior stairwell & the interior remodel incl 1 kitchen & 2.5 baths.Details
alteration, remodel & 85 sf addition to (e) residence. scope includes a reduction in bldg height w/partial demo of 2nd fl, addition of a new roof over remaining 1st fl, facade changes w/new doors & windows, contruction of a new interior stairwell & the interior remodel incl 1 kitchen & 2.5 baths. | $700,000 |