Pt Construction & Plumbing Inc
- Based in
- Daly City
- On San Francisco permits
- Feb 2006 to May 2017
- Last 24 months
- 0 permits filed
25 permits since 2000: 23 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 3 days from filing to permit and 173 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 6, 2017 | Completed final sign-off Dec 2017 | 2063 41st Av | gr fl new bedroom and storage & full bathroom. 2nd fl remodel (e) kitchen, dining rm, (e) bathroom, (e) bdrooms, new bath, add new exterior stairway at rear side of building. remove lath & plaster with 3/8" type 'x' sheetrockDetails
gr fl new bedroom and storage & full bathroom. 2nd fl remodel (e) kitchen, dining rm, (e) bathroom, (e) bdrooms, new bath, add new exterior stairway at rear side of building. remove lath & plaster with 3/8" type 'x' sheetrock | $48,000 |
| Mar 7, 2008 | Completed final sign-off Jun 2008 | 2107 30th Av | remodel existing 1 st and 2nd floors. add new bedrooms, bathroom, storage and replace (e) window with new door on the 1st fl. remodel (e) 2 bathrooms and kitchen on the 2nd floor. rebuild (e) interior stairs. add 5 skylights. recesse garage dr.Details
remodel existing 1 st and 2nd floors. add new bedrooms, bathroom, storage and replace (e) window with new door on the 1st fl. remodel (e) 2 bathrooms and kitchen on the 2nd floor. rebuild (e) interior stairs. add 5 skylights. recesse garage dr. | $43,815 |
| Apr 13, 2007 | Completed final sign-off Oct 2007 | 459 20th Av | remodel 2nd floor relocated kitchen and relocated stair to groundfloor. new bathroom. remodel 3rd floor - relocated bathroom for master bedroom. new bathroom. add new deck at the rear of building. in the buildable area less 10' height.Details
remodel 2nd floor relocated kitchen and relocated stair to groundfloor. new bathroom. remodel 3rd floor - relocated bathroom for master bedroom. new bathroom. add new deck at the rear of building. in the buildable area less 10' height. | $36,000 |