Back to bathroom remodel contractors
Pt Construction & Plumbing Inc
- Based in
- Daly City
- On San Francisco permits
- Feb 2006 to May 2017
- Last 24 months
- 0 permits filed
25 permits since 2000: 23 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 11 completed, 1 expired or cancelled. Typically 2 days from filing to permit and 173 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 30, 2017 | Completed final sign-off Sep 2017 | 1300 Geneva Av | bathroom remodel; replace 1 outlet, 1 switch, 3 lights, 1 toilet, 1 walkin shower, 1 sink and 1 hand shower.Details
bathroom remodel; replace 1 outlet, 1 switch, 3 lights, 1 toilet, 1 walkin shower, 1 sink and 1 hand shower. | $7,000 |
| Mar 6, 2017 | Completed final sign-off Dec 2017 | 2063 41st Av | gr fl new bedroom and storage & full bathroom. 2nd fl remodel (e) kitchen, dining rm, (e) bathroom, (e) bdrooms, new bath, add new exterior stairway at rear side of building. remove lath & plaster with 3/8" type 'x' sheetrockDetails
gr fl new bedroom and storage & full bathroom. 2nd fl remodel (e) kitchen, dining rm, (e) bathroom, (e) bdrooms, new bath, add new exterior stairway at rear side of building. remove lath & plaster with 3/8" type 'x' sheetrock | $48,000 |
| Apr 6, 2015 | Completed final sign-off Nov 2015 | 1785 08th Av | remodel (1) kitchen and (1) bathroom. no walls to be moved/ no structuralDetails
remodel (1) kitchen and (1) bathroom. no walls to be moved/ no structural | $18,000 |
| Dec 2, 2014 | Completed final sign-off Jun 2016 | 1558 32nd Av | 1st floor add two bedrooms, one office, one full bath and a laundry area per plan. replace patio door and windows. 2nd floor remodel kitchen, add one full bath, replace 9 windows at rear.Details
1st floor add two bedrooms, one office, one full bath and a laundry area per plan. replace patio door and windows. 2nd floor remodel kitchen, add one full bath, replace 9 windows at rear. | $75,000 |
| Mar 15, 2013 | Completed final sign-off Aug 2013 | 35 Marietta Dr | add one & 1 half bath, office & home theater & bedroom on garage (ground) level.Details
add one & 1 half bath, office & home theater & bedroom on garage (ground) level. | $21,000 |
| Aug 4, 2010 | Completed final sign-off Dec 2010 | 269 Pope St | legalize 2 bedrooms & family room. add 1 new full bathroomDetails
legalize 2 bedrooms & family room. add 1 new full bathroom | $14,000 |
| Sep 22, 2009 | Expired or cancelled expired Apr 2011 | 3515 Scott St | replace cabinet and floor tile in bath, provide h.e. light on "manual on" occupancy sensor in bathDetails
replace cabinet and floor tile in bath, provide h.e. light on "manual on" occupancy sensor in bath | $4,500 |
| Oct 14, 2008 | Completed final sign-off Mar 2009 | 434 Capitol Av | add two bedrooms, 2 full bathrooms, two storages & laundry area on (e) ground floor. provide new footing for new load bearing wall between two new bedrooms.Details
add two bedrooms, 2 full bathrooms, two storages & laundry area on (e) ground floor. provide new footing for new load bearing wall between two new bedrooms. | $50,000 |
| Aug 8, 2008 | Completed final sign-off Jun 2009 | 3240 Cabrillo St | revision to pa# 2008/07/11/6480 to convert a portion of the ex. garage to 1 new bedroom, family rm and 1 new bathroom. remodel ex. bath and add a new master bath on the 2nd floor.Details
revision to pa# 2008/07/11/6480 to convert a portion of the ex. garage to 1 new bedroom, family rm and 1 new bathroom. remodel ex. bath and add a new master bath on the 2nd floor. | $30,000 |
| Mar 7, 2008 | Completed final sign-off Jun 2008 | 2107 30th Av | remodel existing 1 st and 2nd floors. add new bedrooms, bathroom, storage and replace (e) window with new door on the 1st fl. remodel (e) 2 bathrooms and kitchen on the 2nd floor. rebuild (e) interior stairs. add 5 skylights. recesse garage dr.Details
remodel existing 1 st and 2nd floors. add new bedrooms, bathroom, storage and replace (e) window with new door on the 1st fl. remodel (e) 2 bathrooms and kitchen on the 2nd floor. rebuild (e) interior stairs. add 5 skylights. recesse garage dr. | $43,815 |
| Apr 13, 2007 | Completed final sign-off Oct 2007 | 459 20th Av | remodel 2nd floor relocated kitchen and relocated stair to groundfloor. new bathroom. remodel 3rd floor - relocated bathroom for master bedroom. new bathroom. add new deck at the rear of building. in the buildable area less 10' height.Details
remodel 2nd floor relocated kitchen and relocated stair to groundfloor. new bathroom. remodel 3rd floor - relocated bathroom for master bedroom. new bathroom. add new deck at the rear of building. in the buildable area less 10' height. | $36,000 |
| Apr 6, 2007 | Completed final sign-off Oct 2007 | 459 20th Av | add new fire rate wall to seperate playroom, bedroom and bathroom at the ground floor. enclose ground floor open space under existing sunroom.Details
add new fire rate wall to seperate playroom, bedroom and bathroom at the ground floor. enclose ground floor open space under existing sunroom. | $20,000 |