Back to bathroom remodel contractors
Property Mgmnt Merchandisea
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to May 2009
- Last 24 months
- 0 permits filed
67 permits since 2000: 44 completed, 5 never finaled, 18 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 11 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 131 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 2, 2007 | Completed final sign-off Sep 2007 | 1040 Sutter St | work on unit #26. remodel kitchen bathroom granit counter tops. granit floors florecent light fixtures. no structural changes. new sink.Details
work on unit #26. remodel kitchen bathroom granit counter tops. granit floors florecent light fixtures. no structural changes. new sink. | $9,000 |
| Mar 2, 2007 | Completed final sign-off Aug 2007 | 1040 Sutter St | work on unit #43. remodel kitchen bathroom granit counter tops. granit floors florecent light fixtures. no structural changes. new sink.Details
work on unit #43. remodel kitchen bathroom granit counter tops. granit floors florecent light fixtures. no structural changes. new sink. | $9,000 |
| Dec 5, 2006 | Completed final sign-off Dec 2006 | 634 Clay St | revision to 200512029367. rooms and bath renovation (room a1,a2,a3 only. reducing scope of workDetails
revision to 200512029367. rooms and bath renovation (room a1,a2,a3 only. reducing scope of work | |
| Nov 3, 2006 | Completed final sign-off Jan 2007 | 1640 Vallejo St | work @ unit# 2. remodel kitchen & bathroom area. new cabinets granit counter tops. granit walls in tub area. all floors new hardwood floors. no structural changes. lighting flourescent. no window work. no door work.Details
work @ unit# 2. remodel kitchen & bathroom area. new cabinets granit counter tops. granit walls in tub area. all floors new hardwood floors. no structural changes. lighting flourescent. no window work. no door work. | $10,000 |
| Oct 26, 2006 | Completed final sign-off Jan 2007 | 419 Pierce St | replacement of cabinets, replace sink, install granite floors & counter tops. install gfi over counter. new faucet. new p traps & angle stops. bathroom-new vanity, sink, new shower valve, install granite floors, counter, sink, and shower area and florescent light.Details
replacement of cabinets, replace sink, install granite floors & counter tops. install gfi over counter. new faucet. new p traps & angle stops. bathroom-new vanity, sink, new shower valve, install granite floors, counter, sink, and shower area and florescent light. | $9,000 |
| Sep 27, 2006 | Completed final sign-off Nov 2006 | 545 Ofarrell St | replace (1) 4x4 window header & (1) 2x12 ceiling joint damaged by fire in unit# 215. replace dry wall in unit# 215, #216 & #315 bathroom only. replace sub floor & linoleum in unit# 215. replace windows in unit# 215, #216 & #315. total 3 windows. windows not visible from street. repair siding inDetails
replace (1) 4x4 window header & (1) 2x12 ceiling joint damaged by fire in unit# 215. replace dry wall in unit# 215, #216 & #315 bathroom only. replace sub floor & linoleum in unit# 215. replace windows in unit# 215, #216 & #315. total 3 windows. windows not visible from street. repair siding in | $10,000 |
| Sep 11, 2006 | Completed final sign-off Jul 2007 | 1640 Vallejo St | remove 2 load bearing walls in kitchen area and install 2 beams and 3 posts, relocate bathroom sink and toilet, relocate kitchen sink, dishwasher, add lighting to kitchen, replace kitchen cabinets.Details
remove 2 load bearing walls in kitchen area and install 2 beams and 3 posts, relocate bathroom sink and toilet, relocate kitchen sink, dishwasher, add lighting to kitchen, replace kitchen cabinets. | $40,000 |
| May 19, 2006 | Completed final sign-off Nov 2006 | 54 04th St | remodel room #303 to make ada accessible including bathroom. replace front doors to building to make one 36" and one 24".Details
remodel room #303 to make ada accessible including bathroom. replace front doors to building to make one 36" and one 24". | $18,000 |
| Apr 12, 2005 | Completed final sign-off Jun 2005 | 545 Ofarrell St | remove ceiling in bathroom, install vent fan install new sheetrock, remove & reinstall toilet, bathtDetails
remove ceiling in bathroom, install vent fan install new sheetrock, remove & reinstall toilet, batht | $800 |
| Aug 15, 2002 | Expired or cancelled expired Nov 2004 | 2618 Gough St | remove posts at (e)garage level to create more space for parking;renovate kitchen,add new bathDetails
remove posts at (e)garage level to create more space for parking;renovate kitchen,add new bath | $30,000 |
| Jul 17, 2000 | Completed final sign-off Jul 2001 | 2823 Laguna St | kitchen and bathroom remodeling on 3rd floorDetails
kitchen and bathroom remodeling on 3rd floor | $20,000 |
| Jun 7, 2000 | Completed final sign-off Oct 2000 | 350 Turk St | replace kitchen and bath cabinets, repalce sheetrock and tile, replce dishwasher and toilet unit1104Details
replace kitchen and bath cabinets, repalce sheetrock and tile, replce dishwasher and toilet unit1104 | $14,000 |
| Mar 9, 2000 | Expired or cancelled expired Sep 2000 | 2350 Washington St | replace kitchen cabinets, tiles in bath & kitchenDetails
replace kitchen cabinets, tiles in bath & kitchen |