Back to kitchen remodel contractors
Promodeling Inc.
- Based in
- El Cerrito
- On San Francisco permits
- Jan 2019 to Aug 2026
- Last 24 months
- 12 permits filed
37 permits since 2000: 27 completed, 4 in progress, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 5 completed, 3 in progress, 1 expired or cancelled. Typically 0 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 20, 2026 | In progress issued Mar 2026 | 875 La Playa | unit 275 - renovation of 1077 sf condo, kitchen counter top cabinet. master bathroom remodeling like for like. guest bathroom remodeling like for like. new recessed light @ living space, bathrooms & bedrooms. new doors & closet doorsDetails
unit 275 - renovation of 1077 sf condo, kitchen counter top cabinet. master bathroom remodeling like for like. guest bathroom remodeling like for like. new recessed light @ living space, bathrooms & bedrooms. new doors & closet doors | $40,000 |
| Jun 9, 2025 | In progress issued Jun 2025 | 730 Arguello Bl | bathroom: (e) tub to be replaced with shower pan, (e) wdw & sink to be replace in-kind,(e) lights to be replaced with new,new van & floor, fan.kitchen:new cabs & ctr-top,(e) walls behind range to be removed & range & hood moved back to align w/ rest of cabs,new sink, appliances,new floor,new lights.Details
bathroom: (e) tub to be replaced with shower pan, (e) wdw & sink to be replace in-kind,(e) lights to be replaced with new,new van & floor, fan.kitchen:new cabs & ctr-top,(e) walls behind range to be removed & range & hood moved back to align w/ rest of cabs,new sink, appliances,new floor,new lights. | $73,968 |
| Feb 21, 2025 | In progress issued Mar 2025 | 3360 24th St | remodel bathroom & kitchen, like to like, upgrade mep to current code. install new fixtures. in kindDetails
remodel bathroom & kitchen, like to like, upgrade mep to current code. install new fixtures. in kind | $20,000 |
| Jan 6, 2025 | Completed final sign-off Feb 2026 | 38 Waverly Pl | prop h: reconfigure layout that will accommodate various uses including retial space and a coffee station with front counter & back kitchen, coffee equipment to support beverage program.interior millwork and finishes. electrical/plumbing systems to suport proposed design. outdoor seating.Details
prop h: reconfigure layout that will accommodate various uses including retial space and a coffee station with front counter & back kitchen, coffee equipment to support beverage program.interior millwork and finishes. electrical/plumbing systems to suport proposed design. outdoor seating. | $150,000 |
| Apr 15, 2024 | Completed final sign-off Jul 2024 | 3045 Jackson St | kitchen remodel: remove and replace cabinets, countertops, old appliances, flooring material. remove pony wall & enlarge opening in large wall. new outlets & switches. new downlights and under counter lights. new paint, ceiling & window frame. new microhoodDetails
kitchen remodel: remove and replace cabinets, countertops, old appliances, flooring material. remove pony wall & enlarge opening in large wall. new outlets & switches. new downlights and under counter lights. new paint, ceiling & window frame. new microhood | $49,615 |
| Mar 11, 2024 | Expired or cancelled expired Feb 2026 | 808 Haight St | kitchen remodel like for like. install new cabinet, relocate range hood stove & relocate sink. replace plumbing fixtures. bring outlets up to code. new sub panelDetails
kitchen remodel like for like. install new cabinet, relocate range hood stove & relocate sink. replace plumbing fixtures. bring outlets up to code. new sub panel | $40,000 |
| Feb 9, 2022 | Completed final sign-off Jun 2022 | 1701 Grove St | apt 6: remodeling one kitchen, like for like. replace plumbing fixtures, appliances, update mep up to code.Details
apt 6: remodeling one kitchen, like for like. replace plumbing fixtures, appliances, update mep up to code. | $16,000 |
| Feb 21, 2020 | Completed final sign-off Jul 2020 | 125 Gilbert St | unit 10 - remodel kitchen and bath like for likeDetails
unit 10 - remodel kitchen and bath like for like | $12,000 |
| Feb 19, 2019 | Completed final sign-off Aug 2020 | 651 Noe St | remove load bearing wall, remodel kitchen based on attached floor plan & bathroom remodel & add shower & relocate dryer and washer to storage room, patch shingle sheeting and composite shingles. install new electrical sub panel and relocate hvac & ductDetails
remove load bearing wall, remodel kitchen based on attached floor plan & bathroom remodel & add shower & relocate dryer and washer to storage room, patch shingle sheeting and composite shingles. install new electrical sub panel and relocate hvac & duct | $50,000 |