Back to bathroom remodel contractors
Promodeling Inc.
- Based in
- El Cerrito
- On San Francisco permits
- Jan 2019 to Aug 2026
- Last 24 months
- 12 permits filed
37 permits since 2000: 27 completed, 4 in progress, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 10 completed, 3 in progress. Typically 0 days from filing to permit and 66 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 19, 2026 | Completed final sign-off Jun 2026 | 1167 Plymouth Av | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $30,000 |
| Mar 30, 2026 | Completed final sign-off May 2026 | 630 Mangels Av | bathroom remodel: tub to be replaced with curbless shower (same location) e) sink & toilet to be replaced in kind. new lighting- 1 recessed light, add new exhaust ventDetails
bathroom remodel: tub to be replaced with curbless shower (same location) e) sink & toilet to be replaced in kind. new lighting- 1 recessed light, add new exhaust vent | $42,597 |
| Mar 20, 2026 | In progress issued Mar 2026 | 875 La Playa | unit 275 - renovation of 1077 sf condo, kitchen counter top cabinet. master bathroom remodeling like for like. guest bathroom remodeling like for like. new recessed light @ living space, bathrooms & bedrooms. new doors & closet doorsDetails
unit 275 - renovation of 1077 sf condo, kitchen counter top cabinet. master bathroom remodeling like for like. guest bathroom remodeling like for like. new recessed light @ living space, bathrooms & bedrooms. new doors & closet doors | $40,000 |
| Aug 1, 2025 | Completed final sign-off Jan 2026 | 4140 22nd St | garage level: existing bathroom remodel - replace tub with walk-in shower, new vanity, new lights, new toilet (relocate approx. 6" towards the vanity), under floor heating, new tile, new exhaust, add archway at shower entryway. hall - new archway in b/t foyer and hallway, new switches, new closet,Details
garage level: existing bathroom remodel - replace tub with walk-in shower, new vanity, new lights, new toilet (relocate approx. 6" towards the vanity), under floor heating, new tile, new exhaust, add archway at shower entryway. hall - new archway in b/t foyer and hallway, new switches, new closet, | $96,500 |
| Jun 9, 2025 | In progress issued Jun 2025 | 730 Arguello Bl | bathroom: (e) tub to be replaced with shower pan, (e) wdw & sink to be replace in-kind,(e) lights to be replaced with new,new van & floor, fan.kitchen:new cabs & ctr-top,(e) walls behind range to be removed & range & hood moved back to align w/ rest of cabs,new sink, appliances,new floor,new lights.Details
bathroom: (e) tub to be replaced with shower pan, (e) wdw & sink to be replace in-kind,(e) lights to be replaced with new,new van & floor, fan.kitchen:new cabs & ctr-top,(e) walls behind range to be removed & range & hood moved back to align w/ rest of cabs,new sink, appliances,new floor,new lights. | $73,968 |
| Feb 21, 2025 | In progress issued Mar 2025 | 3360 24th St | remodel bathroom & kitchen, like to like, upgrade mep to current code. install new fixtures. in kindDetails
remodel bathroom & kitchen, like to like, upgrade mep to current code. install new fixtures. in kind | $20,000 |
| Oct 21, 2024 | Completed final sign-off Dec 2024 | 1369 Oak St | bathroom remodel - like to like. (n) vanity, (n) toilet,remove & replace (e) lights,remove & replace (e) shower w/ (n) tile, (n) waterproofing replcament in shower walls,(n) exhaust went,(n) tile floor in bathroomDetails
bathroom remodel - like to like. (n) vanity, (n) toilet,remove & replace (e) lights,remove & replace (e) shower w/ (n) tile, (n) waterproofing replcament in shower walls,(n) exhaust went,(n) tile floor in bathroom | $114,800 |
| Jul 1, 2024 | Completed final sign-off Aug 2024 | 1770 Pacific Av | bathroom remodel, close existing door from hallway, replace plumbing fixtures, light, (n) towel warmer, shower, (n) fan, 2 recessed lights; 1 master bedroom remodelDetails
bathroom remodel, close existing door from hallway, replace plumbing fixtures, light, (n) towel warmer, shower, (n) fan, 2 recessed lights; 1 master bedroom remodel | $46,000 |
| Oct 16, 2023 | Completed final sign-off Jul 2024 | 200 Brannan St | unit #216: bathroom remodel - new vanity, new toilet, bathroom install of new light in vanity, remove (e) bathtub and replace w/ (n) shower w/ corner bench, new waterproofing, replace wall tile. new bath exhaust fan, all same location, (n) tile floor in bath. remove (e) soffit.Details
unit #216: bathroom remodel - new vanity, new toilet, bathroom install of new light in vanity, remove (e) bathtub and replace w/ (n) shower w/ corner bench, new waterproofing, replace wall tile. new bath exhaust fan, all same location, (n) tile floor in bath. remove (e) soffit. | $38,250 |
| Oct 5, 2020 | Completed final sign-off Apr 2021 | 1770 Pacific Av | unit #401: 50sf bathroom remodel with change of layout. filling in 1 (e) doorway and replace 1 side facing window in-kind. relocate toilet, vanity and shower. adding a new exhaust fan to the exterior. new light fixtures to be added. maher n/a.Details
unit #401: 50sf bathroom remodel with change of layout. filling in 1 (e) doorway and replace 1 side facing window in-kind. relocate toilet, vanity and shower. adding a new exhaust fan to the exterior. new light fixtures to be added. maher n/a. | $27,000 |
| Feb 21, 2020 | Completed final sign-off Jul 2020 | 125 Gilbert St | unit 10 - remodel kitchen and bath like for likeDetails
unit 10 - remodel kitchen and bath like for like | $12,000 |
| Aug 28, 2019 | Completed final sign-off Sep 2019 | 347 Cornwall St | remodel bathroom, like for like. remove and replace light. remove tub. install walk-ink shower. remove and replace shower headDetails
remodel bathroom, like for like. remove and replace light. remove tub. install walk-ink shower. remove and replace shower head | $8,000 |
| Feb 19, 2019 | Completed final sign-off Aug 2020 | 651 Noe St | remove load bearing wall, remodel kitchen based on attached floor plan & bathroom remodel & add shower & relocate dryer and washer to storage room, patch shingle sheeting and composite shingles. install new electrical sub panel and relocate hvac & ductDetails
remove load bearing wall, remodel kitchen based on attached floor plan & bathroom remodel & add shower & relocate dryer and washer to storage room, patch shingle sheeting and composite shingles. install new electrical sub panel and relocate hvac & duct | $50,000 |