Professional Concrete Work
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Dec 2012
- Last 24 months
- 0 permits filed
119 permits since 2000: 59 completed, 14 never finaled, 46 expired or cancelled.
Of the 14 never-finaled permits, 14 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 never finaled. Typically 16 days from filing to permit and 154 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 20, 2009 | Completed final sign-off Apr 2010 | 347 Clipper St | provide new-non-rated walls and doors where shown for kitchen, bedroom & bathroom. provide new plumbing fictures where indicated for new bathroom. provide new structural framing, posts and beams as required for new layout. legalize full bathroom on ground floor level.Details
provide new-non-rated walls and doors where shown for kitchen, bedroom & bathroom. provide new plumbing fictures where indicated for new bathroom. provide new structural framing, posts and beams as required for new layout. legalize full bathroom on ground floor level. | $12,500 |
| Feb 11, 2008 | Never finaled issued Mar 2008, no final | 100 De Montfort Av | front building - 100 demontfort ave (lower flat) - remove interior stairway from garage to 1209 capitol, add bedroom & relocate bathroom. 1209 capitol (upper flat) - split (add) bathroom , wall removal between kitchen & dining.Details
front building - 100 demontfort ave (lower flat) - remove interior stairway from garage to 1209 capitol, add bedroom & relocate bathroom. 1209 capitol (upper flat) - split (add) bathroom , wall removal between kitchen & dining. | $80,000 |