119 permits since 2000: 59 completed, 14 never finaled, 46 expired or cancelled.
Of the 14 never-finaled permits, 14 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 3 completed, 2 never finaled. Typically 28 days from filing to permit and 276 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 20, 2009 | Completed final sign-off Apr 2010 | 347 Clipper St | provide new-non-rated walls and doors where shown for kitchen, bedroom & bathroom. provide new plumbing fictures where indicated for new bathroom. provide new structural framing, posts and beams as required for new layout. legalize full bathroom on ground floor level.Details
provide new-non-rated walls and doors where shown for kitchen, bedroom & bathroom. provide new plumbing fictures where indicated for new bathroom. provide new structural framing, posts and beams as required for new layout. legalize full bathroom on ground floor level. | $12,500 |
| Mar 12, 2009 | Never finaled issued Mar 2009, no final | 927 Larkin St | repair bathroom floor drain & sink p trap. change 4 duplex outlets to gfi. all work in 2nd floor bathroom.Details
repair bathroom floor drain & sink p trap. change 4 duplex outlets to gfi. all work in 2nd floor bathroom. | $1,600 |
| Feb 14, 2008 | Completed final sign-off Jun 2009 | 533 Noe St | convert an existing basement into a new garage, sitting room, bathroom & indoor staircase from basement/ garage floor to 1st floor. new curb cut, driveway & retaining wall with guard rail on top of retaining wall for new driveway. construct garage entry monent frameDetails
convert an existing basement into a new garage, sitting room, bathroom & indoor staircase from basement/ garage floor to 1st floor. new curb cut, driveway & retaining wall with guard rail on top of retaining wall for new driveway. construct garage entry monent frame | $30,000 |
| Feb 11, 2008 | Never finaled issued Mar 2008, no final | 100 De Montfort Av | front building - 100 demontfort ave (lower flat) - remove interior stairway from garage to 1209 capitol, add bedroom & relocate bathroom. 1209 capitol (upper flat) - split (add) bathroom , wall removal between kitchen & dining.Details
front building - 100 demontfort ave (lower flat) - remove interior stairway from garage to 1209 capitol, add bedroom & relocate bathroom. 1209 capitol (upper flat) - split (add) bathroom , wall removal between kitchen & dining. | $80,000 |
| Mar 27, 2007 | Completed final sign-off May 2008 | 994 Corbett Av | revision to approved applic. #20206/02/10/4362: excavate for, shore, and construct concrete retaining walls, creating additional space for gym, solar room, and wine cellar at first story (g/f). minor revisions to layout of bathrooms at 2nd, 3rd floors. nov #200675017 dated 9/12/2006.Details
revision to approved applic. #20206/02/10/4362: excavate for, shore, and construct concrete retaining walls, creating additional space for gym, solar room, and wine cellar at first story (g/f). minor revisions to layout of bathrooms at 2nd, 3rd floors. nov #200675017 dated 9/12/2006. | $50,000 |