Back to kitchen remodel contractors
Pro Com Home Services California Inc
- Based in
- Seattle
- On San Francisco permits
- Dec 2016 to Apr 2021
- Last 24 months
- 0 permits filed
58 permits since 2000: 48 completed, 8 never finaled, 2 expired or cancelled.
Of the 8 never-finaled permits, 8 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
20 kitchen remodel permits: 18 completed, 2 never finaled. Typically 20 days from filing to permit and 374 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 13, 2019 | Completed final sign-off Nov 2020 | 318 San Jose Av | kitchen remodel to replace two windows and create new opening in one non-load bearing wall. minor changes to other interior openings in kitchen. expand/remodel bathroom within building envelope. remodel bathroom 2 within building envelopeDetails
kitchen remodel to replace two windows and create new opening in one non-load bearing wall. minor changes to other interior openings in kitchen. expand/remodel bathroom within building envelope. remodel bathroom 2 within building envelope | $25,000 |
| Dec 6, 2019 | Completed final sign-off Feb 2021 | 724 Olmstead St | demo (e) bath, kitchen and portion of wall in bedroom 1 to create extended hallway, then rebuild in different location a new bathroom & kitchen on the same floor. no work at ground level.Details
demo (e) bath, kitchen and portion of wall in bedroom 1 to create extended hallway, then rebuild in different location a new bathroom & kitchen on the same floor. no work at ground level. | $95,000 |
| Nov 14, 2019 | Completed final sign-off Oct 2020 | 316 San Jose Av | rev to pa# 201907186275; remove (e) closet wall, relocate tub & water closet, add closet in bed 2, add closet to bed 3, (e) shower to remain, swap windows at bed 3 & kitchen, add windows in master bath, infill (e) will no longer install sky lights at master bath & stair hall, infill window atDetails
rev to pa# 201907186275; remove (e) closet wall, relocate tub & water closet, add closet in bed 2, add closet to bed 3, (e) shower to remain, swap windows at bed 3 & kitchen, add windows in master bath, infill (e) will no longer install sky lights at master bath & stair hall, infill window at | |
| Oct 17, 2019 | Completed final sign-off Aug 2020 | 1316 Clayton St | remodel to exgt kitchen. wall to be opened up between kitchen and dining room. expansion of closet in living room.Details
remodel to exgt kitchen. wall to be opened up between kitchen and dining room. expansion of closet in living room. | $5,000 |
| Aug 29, 2019 | Completed final sign-off Oct 2021 | 2310 26th Av | lower level: master bedroom with full bath and family room. upper level: remodel kitchen, demo wall between living, dining and kitchen. build 2 level addition at extg lightwell facing blind wall of neighbor.Details
lower level: master bedroom with full bath and family room. upper level: remodel kitchen, demo wall between living, dining and kitchen. build 2 level addition at extg lightwell facing blind wall of neighbor. | $120,000 |
| Aug 20, 2019 | Completed final sign-off Mar 2021 | 150 Lombard St | like for like kitchen remodel.Details
like for like kitchen remodel. | $12,000 |
| Jul 18, 2019 | Completed final sign-off Oct 2020 | 316 San Jose Av | add common area light fixtures. add master bathroom & closet area, remodel kitchen, reduce wall partitions. rmeodel (e) water closet powder room. remodel (e) bathroom. update electrical in remodeled rooms, add lighting, place (n) laundry in (e) room closet.Details
add common area light fixtures. add master bathroom & closet area, remodel kitchen, reduce wall partitions. rmeodel (e) water closet powder room. remodel (e) bathroom. update electrical in remodeled rooms, add lighting, place (n) laundry in (e) room closet. | $75,000 |
| Jun 21, 2019 | Never finaled issued Jun 2019, no final | 3835 Judah St | kitchen remodel replacement stove, refrigerator and cabinets after replacement of (e) installed units. no change in wall layout and opening.Details
kitchen remodel replacement stove, refrigerator and cabinets after replacement of (e) installed units. no change in wall layout and opening. | $50,000 |
| Apr 2, 2019 | Never finaled issued Apr 2019, no final | 63 Lamartine St | kitchen renovation. not changing layout. in-kind. no walls altered, modified or infilled.Details
kitchen renovation. not changing layout. in-kind. no walls altered, modified or infilled. | $40,000 |
| Mar 1, 2019 | Completed final sign-off May 2019 | 273 09th St | 2nd fl - ti of existing space. new non-structural partitions, lighting, millwork and kitchen equipment. upgrading bathroom to be accessibleDetails
2nd fl - ti of existing space. new non-structural partitions, lighting, millwork and kitchen equipment. upgrading bathroom to be accessible | $87,653 |
| Jan 25, 2019 | Completed final sign-off Jul 2020 | 172 University St | interior renovation of kitchen and baths (2.5) replace and extend rear deck and deck roofDetails
interior renovation of kitchen and baths (2.5) replace and extend rear deck and deck roof | $125,000 |
| Jan 18, 2019 | Completed final sign-off Aug 2020 | 381 Teresita Bl | infill 2nd story lightwell at property line, remodel kitchen & (e) full bath, 3 (n) skylights, open walls between kitchen/dining/living, (n) full bath, (n) interior stair, (n) conditioned space on ground fl. (n) furnace and ducts, finish garage with sheet rockDetails
infill 2nd story lightwell at property line, remodel kitchen & (e) full bath, 3 (n) skylights, open walls between kitchen/dining/living, (n) full bath, (n) interior stair, (n) conditioned space on ground fl. (n) furnace and ducts, finish garage with sheet rock | $150,000 |
| Oct 22, 2018 | Completed final sign-off Apr 2022 | 226 Mullen Av | excavation of 190 cubic yards for (n) habitable 1st floor, including (n) bath & two (n) bedrooms. 2nd floor: renovation - (n) half bath & remodel kitchen. shoring under separate permit.Details
excavation of 190 cubic yards for (n) habitable 1st floor, including (n) bath & two (n) bedrooms. 2nd floor: renovation - (n) half bath & remodel kitchen. shoring under separate permit. | $100,000 |
| Aug 14, 2018 | Completed final sign-off Aug 2019 | 30 Santa Marina St | kitchen (15x10) & bathroom (9x7) remodel like for like. electrical upgrade 100 amp. no structural work.Details
kitchen (15x10) & bathroom (9x7) remodel like for like. electrical upgrade 100 amp. no structural work. | $47,042 |
| Mar 19, 2018 | Completed final sign-off Feb 2019 | 955 Corbett Av | unit #4: extg kitchen remodel. replace kitchen cabinets, appliances and flooring. no change to layout, doors, or openings.Details
unit #4: extg kitchen remodel. replace kitchen cabinets, appliances and flooring. no change to layout, doors, or openings. | $20,000 |
| Dec 28, 2017 | Completed final sign-off Mar 2018 | 811 Moultrie St | revision of scope of work for permit # 201712196853, (1) bathroom remodel not (2) , in kind, no light remodeling in kitchen,Details
revision of scope of work for permit # 201712196853, (1) bathroom remodel not (2) , in kind, no light remodeling in kitchen, | |
| Dec 19, 2017 | Completed final sign-off Mar 2018 | 811 Moultrie St | repairs & light remodel of kitchen only backsplash, remodel bathroom (x2) in-kindDetails
repairs & light remodel of kitchen only backsplash, remodel bathroom (x2) in-kind | $12,000 |
| Dec 19, 2017 | Completed final sign-off Mar 2018 | 201 Harrison St | remodel kitchen, including new cabinets & appliances. replace hardwood flooring. in-kind. n/a for maher.Details
remodel kitchen, including new cabinets & appliances. replace hardwood flooring. in-kind. n/a for maher. | $18,000 |
| Nov 22, 2017 | Completed final sign-off Oct 2019 | 247 Edna St | converts (e) ground floor open space to a (n) bedroom, bathroom, game room. convert (e) crawl space to (n) family room. renovate (e) kitchen and bathroom. (n) rear deck. with exterior work. addition of adu per ordinance 162-16Details
converts (e) ground floor open space to a (n) bedroom, bathroom, game room. convert (e) crawl space to (n) family room. renovate (e) kitchen and bathroom. (n) rear deck. with exterior work. addition of adu per ordinance 162-16 | $110,000 |
| Dec 12, 2016 | Completed final sign-off Sep 2021 | 754 10th Av | change of use - accessory dwg unit. 1 bedrm, 1 1/2 bath, kitchen, living rm. addition at rearof structure under (e)2nd story & deck (from single family to 2 family dwelling)Details
change of use - accessory dwg unit. 1 bedrm, 1 1/2 bath, kitchen, living rm. addition at rearof structure under (e)2nd story & deck (from single family to 2 family dwelling) | $150,000 |