Back to bathroom remodel contractors
Pro Com Home Services California Inc
- Based in
- Seattle
- On San Francisco permits
- Dec 2016 to Apr 2021
- Last 24 months
- 0 permits filed
58 permits since 2000: 48 completed, 8 never finaled, 2 expired or cancelled.
Of the 8 never-finaled permits, 8 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
26 bathroom remodel permits: 25 completed, 1 never finaled. Typically 27 days from filing to permit and 364 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 13, 2019 | Completed final sign-off Nov 2020 | 318 San Jose Av | kitchen remodel to replace two windows and create new opening in one non-load bearing wall. minor changes to other interior openings in kitchen. expand/remodel bathroom within building envelope. remodel bathroom 2 within building envelopeDetails
kitchen remodel to replace two windows and create new opening in one non-load bearing wall. minor changes to other interior openings in kitchen. expand/remodel bathroom within building envelope. remodel bathroom 2 within building envelope | $25,000 |
| Dec 13, 2019 | Completed final sign-off Jan 2021 | 583 29th Av | remodel of existing bedroom. interior addition of a new bathroom and cloest w/ in master bedroomDetails
remodel of existing bedroom. interior addition of a new bathroom and cloest w/ in master bedroom | $18,000 |
| Dec 6, 2019 | Completed final sign-off Feb 2021 | 724 Olmstead St | demo (e) bath, kitchen and portion of wall in bedroom 1 to create extended hallway, then rebuild in different location a new bathroom & kitchen on the same floor. no work at ground level.Details
demo (e) bath, kitchen and portion of wall in bedroom 1 to create extended hallway, then rebuild in different location a new bathroom & kitchen on the same floor. no work at ground level. | $95,000 |
| Dec 2, 2019 | Completed final sign-off Mar 2021 | 39 Coleridge St | remodel of (e) bonus room to add bathroom, replace a window (rear) and replace patio door. floor structure to be lowered approx 6 inches to increase ceiling height. bonus room used as an office.Details
remodel of (e) bonus room to add bathroom, replace a window (rear) and replace patio door. floor structure to be lowered approx 6 inches to increase ceiling height. bonus room used as an office. | $18,000 |
| Nov 14, 2019 | Completed final sign-off Oct 2020 | 316 San Jose Av | rev to pa# 201907186275; remove (e) closet wall, relocate tub & water closet, add closet in bed 2, add closet to bed 3, (e) shower to remain, swap windows at bed 3 & kitchen, add windows in master bath, infill (e) will no longer install sky lights at master bath & stair hall, infill window atDetails
rev to pa# 201907186275; remove (e) closet wall, relocate tub & water closet, add closet in bed 2, add closet to bed 3, (e) shower to remain, swap windows at bed 3 & kitchen, add windows in master bath, infill (e) will no longer install sky lights at master bath & stair hall, infill window at | |
| Aug 29, 2019 | Completed final sign-off Oct 2021 | 2310 26th Av | lower level: master bedroom with full bath and family room. upper level: remodel kitchen, demo wall between living, dining and kitchen. build 2 level addition at extg lightwell facing blind wall of neighbor.Details
lower level: master bedroom with full bath and family room. upper level: remodel kitchen, demo wall between living, dining and kitchen. build 2 level addition at extg lightwell facing blind wall of neighbor. | $120,000 |
| Aug 5, 2019 | Completed final sign-off Mar 2020 | 56 Lopez Av | revision to pa 201904026846. master bath suite - move 3 walls, reconfigure plumbing, 1 wall become "stem" wall, electrical moved to shower back wallDetails
revision to pa 201904026846. master bath suite - move 3 walls, reconfigure plumbing, 1 wall become "stem" wall, electrical moved to shower back wall | |
| Jul 18, 2019 | Completed final sign-off Oct 2020 | 316 San Jose Av | add common area light fixtures. add master bathroom & closet area, remodel kitchen, reduce wall partitions. rmeodel (e) water closet powder room. remodel (e) bathroom. update electrical in remodeled rooms, add lighting, place (n) laundry in (e) room closet.Details
add common area light fixtures. add master bathroom & closet area, remodel kitchen, reduce wall partitions. rmeodel (e) water closet powder room. remodel (e) bathroom. update electrical in remodeled rooms, add lighting, place (n) laundry in (e) room closet. | $75,000 |
| Apr 2, 2019 | Completed final sign-off Mar 2020 | 56 Lopez Av | remodel bathroom & bedroom. layout remains unchanged.Details
remodel bathroom & bedroom. layout remains unchanged. | $40,000 |
| Apr 2, 2019 | Completed final sign-off Mar 2021 | 168 28th Av | residential remodel, replace windows and doors, add lightwell, ground floor condition floor area in basement add 1/2 bathroom. windows on west elevation (front) to be wood not clad.Details
residential remodel, replace windows and doors, add lightwell, ground floor condition floor area in basement add 1/2 bathroom. windows on west elevation (front) to be wood not clad. | $300,000 |
| Mar 1, 2019 | Completed final sign-off May 2019 | 273 09th St | 2nd fl - ti of existing space. new non-structural partitions, lighting, millwork and kitchen equipment. upgrading bathroom to be accessibleDetails
2nd fl - ti of existing space. new non-structural partitions, lighting, millwork and kitchen equipment. upgrading bathroom to be accessible | $87,653 |
| Jan 25, 2019 | Completed final sign-off Jul 2020 | 172 University St | interior renovation of kitchen and baths (2.5) replace and extend rear deck and deck roofDetails
interior renovation of kitchen and baths (2.5) replace and extend rear deck and deck roof | $125,000 |
| Jan 18, 2019 | Completed final sign-off Aug 2020 | 381 Teresita Bl | infill 2nd story lightwell at property line, remodel kitchen & (e) full bath, 3 (n) skylights, open walls between kitchen/dining/living, (n) full bath, (n) interior stair, (n) conditioned space on ground fl. (n) furnace and ducts, finish garage with sheet rockDetails
infill 2nd story lightwell at property line, remodel kitchen & (e) full bath, 3 (n) skylights, open walls between kitchen/dining/living, (n) full bath, (n) interior stair, (n) conditioned space on ground fl. (n) furnace and ducts, finish garage with sheet rock | $150,000 |
| Dec 14, 2018 | Completed final sign-off May 2019 | 2001 Mcallister St | replace shower pan & install tile shower, replace vanity, replace tile in bath, replace + update fixtures, replace bedroom carpet + pad, replace + update thermostats, paint all walls + ceilings . update light fixtures and 2nd floor non elevator to 2nd floor no adaptability requirements.Details
replace shower pan & install tile shower, replace vanity, replace tile in bath, replace + update fixtures, replace bedroom carpet + pad, replace + update thermostats, paint all walls + ceilings . update light fixtures and 2nd floor non elevator to 2nd floor no adaptability requirements. | |
| Nov 29, 2018 | Completed final sign-off Mar 2019 | 1635 California St | remodeling 1/2 bath, and 1 master bath . no change of (e) floor plan.Details
remodeling 1/2 bath, and 1 master bath . no change of (e) floor plan. | $38,000 |
| Oct 22, 2018 | Completed final sign-off Apr 2022 | 226 Mullen Av | excavation of 190 cubic yards for (n) habitable 1st floor, including (n) bath & two (n) bedrooms. 2nd floor: renovation - (n) half bath & remodel kitchen. shoring under separate permit.Details
excavation of 190 cubic yards for (n) habitable 1st floor, including (n) bath & two (n) bedrooms. 2nd floor: renovation - (n) half bath & remodel kitchen. shoring under separate permit. | $100,000 |
| Oct 15, 2018 | Completed final sign-off Nov 2018 | 201 Harrison St | remodel bathroom, like for like.Details
remodel bathroom, like for like. | $10,000 |
| Aug 14, 2018 | Completed final sign-off Aug 2019 | 30 Santa Marina St | kitchen (15x10) & bathroom (9x7) remodel like for like. electrical upgrade 100 amp. no structural work.Details
kitchen (15x10) & bathroom (9x7) remodel like for like. electrical upgrade 100 amp. no structural work. | $47,042 |
| Aug 14, 2018 | Completed final sign-off Nov 2018 | 1445 Fulton St | bathroom remodel like for like (10x5) no structural work.Details
bathroom remodel like for like (10x5) no structural work. | $20,000 |
| Jul 17, 2018 | Never finaled issued Jul 2018, no final | 201 Harrison St | demo existing bath and remodel, like for like. no layout changes.Details
demo existing bath and remodel, like for like. no layout changes. | $12,000 |
| Dec 28, 2017 | Completed final sign-off Mar 2018 | 811 Moultrie St | revision of scope of work for permit # 201712196853, (1) bathroom remodel not (2) , in kind, no light remodeling in kitchen,Details
revision of scope of work for permit # 201712196853, (1) bathroom remodel not (2) , in kind, no light remodeling in kitchen, | |
| Dec 19, 2017 | Completed final sign-off Mar 2018 | 811 Moultrie St | repairs & light remodel of kitchen only backsplash, remodel bathroom (x2) in-kindDetails
repairs & light remodel of kitchen only backsplash, remodel bathroom (x2) in-kind | $12,000 |
| Nov 22, 2017 | Completed final sign-off Oct 2019 | 247 Edna St | converts (e) ground floor open space to a (n) bedroom, bathroom, game room. convert (e) crawl space to (n) family room. renovate (e) kitchen and bathroom. (n) rear deck. with exterior work. addition of adu per ordinance 162-16Details
converts (e) ground floor open space to a (n) bedroom, bathroom, game room. convert (e) crawl space to (n) family room. renovate (e) kitchen and bathroom. (n) rear deck. with exterior work. addition of adu per ordinance 162-16 | $110,000 |
| Oct 17, 2017 | Completed final sign-off Dec 2017 | 528 Lyon St | top unit - remodel bathroom - remove and replace tub, toilet, vanity,, like , lifhting in same locatins or existing.Details
top unit - remodel bathroom - remove and replace tub, toilet, vanity,, like , lifhting in same locatins or existing. | $20,000 |
| Jul 11, 2017 | Completed final sign-off Dec 2020 | 72 Vernon St | 256 sq.ft. 2 story addition. new 2 bathrooms. preservation repair front walls. new stucco.Details
256 sq.ft. 2 story addition. new 2 bathrooms. preservation repair front walls. new stucco. | $75,000 |
| Dec 12, 2016 | Completed final sign-off Sep 2021 | 754 10th Av | change of use - accessory dwg unit. 1 bedrm, 1 1/2 bath, kitchen, living rm. addition at rearof structure under (e)2nd story & deck (from single family to 2 family dwelling)Details
change of use - accessory dwg unit. 1 bedrm, 1 1/2 bath, kitchen, living rm. addition at rearof structure under (e)2nd story & deck (from single family to 2 family dwelling) | $150,000 |