Back to kitchen remodel contractors
Pristine Builders Group
- Based in
- Novato
- On San Francisco permits
- Sep 2021 to Sep 2026
- Last 24 months
- 13 permits filed
21 permits since 2000: 10 completed, 10 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 1 completed, 1 in progress, 1 never finaled. Typically 1 days from filing to permit and 341 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 8, 2026 | In progress issued May 2026 | 625 10th Av | revision 202604049050- plan included to show full scope of remodel to kitchen, 2 bathroom and powder bath. upgrade (e) stairs railing to code. alteration to interior non load bearing walls. replace interior doors throughout . paint exteriorDetails
revision 202604049050- plan included to show full scope of remodel to kitchen, 2 bathroom and powder bath. upgrade (e) stairs railing to code. alteration to interior non load bearing walls. replace interior doors throughout . paint exterior | |
| Sep 25, 2024 | Completed final sign-off Sep 2025 | 2826 Sacramento St | interior remodel to 2nd level kitchen, dining and powder room area including back stairs. remodel upper level bedrooms, closets, and bathrooms. add laundry, bathroom, and storage to 1st level.Details
interior remodel to 2nd level kitchen, dining and powder room area including back stairs. remodel upper level bedrooms, closets, and bathrooms. add laundry, bathroom, and storage to 1st level. | $75,000 |
| May 12, 2022 | Never finaled issued Oct 2022, no final | 457 38th Av | int alt 1st fl - (n) master bedrm, (n) master bathroom, (n) family room of unconditioned space; 2nd fl - remodel (e) kitchen & (e) bath; 3rd fl - (n) bath & laundry closets; (n) 3 story stair, structural upgrade as req'd; (n) radiant in-flr heat sys, plumb & elect work via separate permit; (n)Details
int alt 1st fl - (n) master bedrm, (n) master bathroom, (n) family room of unconditioned space; 2nd fl - remodel (e) kitchen & (e) bath; 3rd fl - (n) bath & laundry closets; (n) 3 story stair, structural upgrade as req'd; (n) radiant in-flr heat sys, plumb & elect work via separate permit; (n) | $375,000 |