21 permits since 2000: 10 completed, 10 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
10 bathroom remodel permits: 4 completed, 5 in progress, 1 never finaled. Typically 0 days from filing to permit and 113 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2026 | In progress issued Sep 2026 | 4256 23rd St | remodel 2 top floor bathrooms in kind.Details
remodel 2 top floor bathrooms in kind. | $103,000 |
| Aug 25, 2026 | In progress filed Aug 2026, not yet issued | 845 Vermont St | revision to pa# 202203089445. remove fire escape both units. comply w/ (e) access requirment found in eg-03. infill below overhang @ facade. create (n) sliding glass door & french balcony. layout change to primary closet/bath kids bedroom & bath, & (n) built-ins @ entry.Details
revision to pa# 202203089445. remove fire escape both units. comply w/ (e) access requirment found in eg-03. infill below overhang @ facade. create (n) sliding glass door & french balcony. layout change to primary closet/bath kids bedroom & bath, & (n) built-ins @ entry. | |
| May 8, 2026 | In progress issued May 2026 | 625 10th Av | revision 202604049050- plan included to show full scope of remodel to kitchen, 2 bathroom and powder bath. upgrade (e) stairs railing to code. alteration to interior non load bearing walls. replace interior doors throughout . paint exteriorDetails
revision 202604049050- plan included to show full scope of remodel to kitchen, 2 bathroom and powder bath. upgrade (e) stairs railing to code. alteration to interior non load bearing walls. replace interior doors throughout . paint exterior | |
| Apr 7, 2026 | In progress issued Apr 2026 | 625 10th Av | remodel master bathroom in like kind. no structural work. no walls or framing modifications.Details
remodel master bathroom in like kind. no structural work. no walls or framing modifications. | $180,000 |
| Oct 21, 2024 | In progress issued Mar 2025 | 707 Douglass St | foundation replacement; new interior stair; remodel 2 bathrooms; new platform at grade; convert laundry to shop. no exterior alterationsDetails
foundation replacement; new interior stair; remodel 2 bathrooms; new platform at grade; convert laundry to shop. no exterior alterations | $387,000 |
| Sep 25, 2024 | Completed final sign-off Sep 2025 | 2826 Sacramento St | interior remodel to 2nd level kitchen, dining and powder room area including back stairs. remodel upper level bedrooms, closets, and bathrooms. add laundry, bathroom, and storage to 1st level.Details
interior remodel to 2nd level kitchen, dining and powder room area including back stairs. remodel upper level bedrooms, closets, and bathrooms. add laundry, bathroom, and storage to 1st level. | $75,000 |
| Jul 19, 2024 | Completed final sign-off Oct 2024 | 3326 25th St | bathroom remodel, existing locations not moving. bathtub to shower. no walls being moved. approx 100 sq ft.Details
bathroom remodel, existing locations not moving. bathtub to shower. no walls being moved. approx 100 sq ft. | $35,000 |
| May 17, 2024 | Completed final sign-off Oct 2024 | 1754 Grove St | bathroom will be remodeled with fixtures being replace in the same locationDetails
bathroom will be remodeled with fixtures being replace in the same location | $35,000 |
| Aug 16, 2022 | Completed final sign-off Jun 2025 | 65 Graystone Tr | revision to pa#202108247069 replace front door in (e) frame; elongate windows at 2n fl primar bath; new sliding glass door roof equipment (separate permit); new 2nd floor bathroom - window. all new windows to be aluminum clad woodDetails
revision to pa#202108247069 replace front door in (e) frame; elongate windows at 2n fl primar bath; new sliding glass door roof equipment (separate permit); new 2nd floor bathroom - window. all new windows to be aluminum clad wood | $8,500 |
| May 12, 2022 | Never finaled issued Oct 2022, no final | 457 38th Av | int alt 1st fl - (n) master bedrm, (n) master bathroom, (n) family room of unconditioned space; 2nd fl - remodel (e) kitchen & (e) bath; 3rd fl - (n) bath & laundry closets; (n) 3 story stair, structural upgrade as req'd; (n) radiant in-flr heat sys, plumb & elect work via separate permit; (n)Details
int alt 1st fl - (n) master bedrm, (n) master bathroom, (n) family room of unconditioned space; 2nd fl - remodel (e) kitchen & (e) bath; 3rd fl - (n) bath & laundry closets; (n) 3 story stair, structural upgrade as req'd; (n) radiant in-flr heat sys, plumb & elect work via separate permit; (n) | $375,000 |