Back to kitchen remodel contractors
Post & Lintel Construction
- Based in
- Fremont
- On San Francisco permits
- Mar 2006 to Mar 2016
- Last 24 months
- 0 permits filed
22 permits since 2000: 16 completed, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 5 completed, 1 never finaled, 2 expired or cancelled. Typically 1 days from filing to permit and 202 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 10, 2015 | Completed final sign-off Nov 2017 | 1492 Guerrero St | interior remodel to include new kitchen, new bathrooms and refurbish of (e) finishes throughout residence. new deck proposed within (e) building envelope at level 2 and atic level. the front elevation to remain intact & repaired in kind. rear facade upgrade will remove (e) stair and resurface facadeDetails
interior remodel to include new kitchen, new bathrooms and refurbish of (e) finishes throughout residence. new deck proposed within (e) building envelope at level 2 and atic level. the front elevation to remain intact & repaired in kind. rear facade upgrade will remove (e) stair and resurface facade | $125,000 |
| Nov 12, 2014 | Completed final sign-off Mar 2015 | 1258 Stanyan St | revision to pa #2014/0604/7532. in lieu of fire rated skylight at kitchen, provide fire rated parapet.Details
revision to pa #2014/0604/7532. in lieu of fire rated skylight at kitchen, provide fire rated parapet. | |
| Jun 4, 2014 | Completed final sign-off Mar 2015 | 1258 Stanyan St | remodel of interior for extg s.f.d. on 3rd floor which includes replacement of plmg fixtures, cabinets and counter tops for extg bathoom and kitchen & bar areas. replace extg exterior windows in kind. remove extg skylights to be replaced with new skylights. replace extg kitchen appliances with newDetails
remodel of interior for extg s.f.d. on 3rd floor which includes replacement of plmg fixtures, cabinets and counter tops for extg bathoom and kitchen & bar areas. replace extg exterior windows in kind. remove extg skylights to be replaced with new skylights. replace extg kitchen appliances with new | $106,492 |
| Mar 24, 2014 | Never finaled issued Apr 2014, no final | 2145 California St | interior remodel of a condominium dwelling unit #5 in a five unit ,3 story building work shall include kitchen, bathroom and living remodel, work shall also include the replacement of (e) exterior windows and doors not visible from the street.Details
interior remodel of a condominium dwelling unit #5 in a five unit ,3 story building work shall include kitchen, bathroom and living remodel, work shall also include the replacement of (e) exterior windows and doors not visible from the street. | $30,000 |
| Sep 22, 2011 | Expired or cancelled cancelled Dec 2011 | 301 Main St | remodel kitchen, replace cabinets, countertop & appliances.Details
remodel kitchen, replace cabinets, countertop & appliances. | $35,000 |
| Sep 22, 2011 | Expired or cancelled expired Apr 2013 | 2790 19th Av | remodel kitchen & 2 bathrooms, replace cabinets, countertop & appliances & lighting, same layout for kitchen. replace tiles, cabinets, countertop & lighting, same layout for bathroom.Details
remodel kitchen & 2 bathrooms, replace cabinets, countertop & appliances & lighting, same layout for kitchen. replace tiles, cabinets, countertop & lighting, same layout for bathroom. | $70,000 |
| Oct 19, 2010 | Completed final sign-off May 2011 | 3320 Washington St | unit #3320-repl kitchen cabinets,countertop,appliances & sink. repl recessed lights to title 24 compliant led recessed lights. upgrd countertop outlets to code,(e) kitchen layout stays the same,bathrm remodel-repl all tiles,cabinets,plumbing fixtures & layout to be the same. repl lights, no moving/aDetails
unit #3320-repl kitchen cabinets,countertop,appliances & sink. repl recessed lights to title 24 compliant led recessed lights. upgrd countertop outlets to code,(e) kitchen layout stays the same,bathrm remodel-repl all tiles,cabinets,plumbing fixtures & layout to be the same. repl lights, no moving/a | $85,000 |
| Mar 9, 2006 | Completed final sign-off Aug 2006 | 80 Brentwood Av | remove & replace kitchen cabinets, new electrical system in kitchen in kitchen. relocate water, drain and gas line. new exhaust vent location. replace (e) windowDetails
remove & replace kitchen cabinets, new electrical system in kitchen in kitchen. relocate water, drain and gas line. new exhaust vent location. replace (e) window | $37,000 |