Post & Lintel Construction
- Based in
- Fremont
- On San Francisco permits
- Mar 2006 to Mar 2016
- Last 24 months
- 0 permits filed
22 permits since 2000: 16 completed, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 2 completed, 2 never finaled. Typically 949 days from filing to permit and 566 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 10, 2015 | Completed final sign-off Nov 2017 | 1492 Guerrero St | interior remodel to include new kitchen, new bathrooms and refurbish of (e) finishes throughout residence. new deck proposed within (e) building envelope at level 2 and atic level. the front elevation to remain intact & repaired in kind. rear facade upgrade will remove (e) stair and resurface facadeDetails
interior remodel to include new kitchen, new bathrooms and refurbish of (e) finishes throughout residence. new deck proposed within (e) building envelope at level 2 and atic level. the front elevation to remain intact & repaired in kind. rear facade upgrade will remove (e) stair and resurface facade | $125,000 |
| Aug 8, 2014 | Completed final sign-off Nov 2015 | 3494 21st St | exterior remodel of an extg rear yard patio and 2nd floor deck over an extg garage. work shall include the construction of new stairs between levels, replacing the extg deck board and railing, replacing and heighting the rear yard fence, construction of new planters and refinishing ofDetails
exterior remodel of an extg rear yard patio and 2nd floor deck over an extg garage. work shall include the construction of new stairs between levels, replacing the extg deck board and railing, replacing and heighting the rear yard fence, construction of new planters and refinishing of | $30,000 |
| Jun 12, 2008 | Never finaled issued Jun 2013, no final | 34 Clarendon Av | removal of existing side yard deck & stair, construction of a new side yard deck extending to the rear above garde.Details
removal of existing side yard deck & stair, construction of a new side yard deck extending to the rear above garde. | $14,000 |
| Apr 16, 2008 | Never finaled issued Jun 2013, no final | 34 Clarendon Av | site permit exterior finish repairs, wndw replacement, auto runway and curb cut repairs, side yard deck and stair extension, cabinet and finish upgrades at kchn, remove interior steel braces new landscaping, security gate and fences/enclose ext deck with new green houseDetails
site permit exterior finish repairs, wndw replacement, auto runway and curb cut repairs, side yard deck and stair extension, cabinet and finish upgrades at kchn, remove interior steel braces new landscaping, security gate and fences/enclose ext deck with new green house | $180,000 |