Back to kitchen remodel contractors
Polichio And Horne Inc
- Based in
- Lafayette
- On San Francisco permits
- Jan 2000 to Mar 2024
- Last 24 months
- 0 permits filed
20 permits since 2000: 16 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 6 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 55 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 22, 2024 | Completed final sign-off Mar 2024 | 940 Guerrero St | unit #1 remodel kitchen and bathroom like for like. build new closet for washer and dryer. paint interior and install vinly flooring.Details
unit #1 remodel kitchen and bathroom like for like. build new closet for washer and dryer. paint interior and install vinly flooring. | $50,000 |
| Sep 6, 2022 | Completed final sign-off Jun 2023 | 940 Guerrero St | unit 14,15,16,17,18: kitchen remodel like for like. replace cabinets, countertops, appliances.Details
unit 14,15,16,17,18: kitchen remodel like for like. replace cabinets, countertops, appliances. | $100,000 |
| Jun 7, 2022 | Completed final sign-off Jun 2023 | 940 Guerrero St | unit #3,6,11,12: kitchen remodel in-kind. bathroom remodel in-kind. lvt flooring. paint. remodel 1 bath and 1 kitchen in each of 4 units.Details
unit #3,6,11,12: kitchen remodel in-kind. bathroom remodel in-kind. lvt flooring. paint. remodel 1 bath and 1 kitchen in each of 4 units. | $40,000 |
| Jan 30, 2020 | Completed final sign-off Mar 2020 | 1 Powell St | unit 601 - remodel kitchen and bath like for like. install n shower pan and shower valve, n bath tile, flooring, new electrical fixture & trim. new countertops. no structural workDetails
unit 601 - remodel kitchen and bath like for like. install n shower pan and shower valve, n bath tile, flooring, new electrical fixture & trim. new countertops. no structural work | $40,000 |
| Jan 30, 2020 | Completed final sign-off Mar 2020 | 1 Powell St | unit 704 - remodel kitchen and bath in kind. no structural workDetails
unit 704 - remodel kitchen and bath in kind. no structural work | $40,000 |
| Oct 20, 2005 | Expired or cancelled expired Feb 2008 | 552 46th Av | kitchen remodel, cabs, countertops, sheetrock-insulation, no change to existing layoutDetails
kitchen remodel, cabs, countertops, sheetrock-insulation, no change to existing layout | $20,000 |
| Dec 13, 2001 | Completed final sign-off Jan 2002 | 137 Bosworth St | replace lino fl in #101, front door @101a&b patch/repair peeling paint in hallway/kitchen/bathDetails
replace lino fl in #101, front door @101a&b patch/repair peeling paint in hallway/kitchen/bath | $2,000 |
| Apr 11, 2000 | Expired or cancelled expired Jul 2001 | 2639 24th St | remove and replace subflooring in kitchen and bathroomDetails
remove and replace subflooring in kitchen and bathroom | $7,000 |