Planning & Architecture
- Based in
- Oakland
- On San Francisco permits
- Feb 2002 to Feb 2026
- Last 24 months
- 1 permit filed
20 permits since 2000: 18 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 2 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 644 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 23, 2020 | Expired or cancelled expired Aug 2025 | 434 41st Av | repairs to (e) deck and stairs. less than 50%Details
repairs to (e) deck and stairs. less than 50% | $5,000 |
| Jan 23, 2009 | Completed final sign-off Apr 2010 | 18 Roanoke St | revision to pa# 2008-0331-8361-changes include omitting balcony to leave roof as is, reconfiguring of interior walls at garage level. change in stair detailing from steel to woodDetails
revision to pa# 2008-0331-8361-changes include omitting balcony to leave roof as is, reconfiguring of interior walls at garage level. change in stair detailing from steel to wood | |
| Feb 13, 2002 | Completed final sign-off Jun 2005 | 127 Belvedere St | 2 story addition at rear of bldg housing 4 new connecting stair between 1st & 2nd floorsDetails
2 story addition at rear of bldg housing 4 new connecting stair between 1st & 2nd floors | $100,000 |