Back to bathroom remodel contractors
Planning & Architecture
- Based in
- Oakland
- On San Francisco permits
- Feb 2002 to Feb 2026
- Last 24 months
- 1 permit filed
20 permits since 2000: 18 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 134 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 23, 2015 | Completed final sign-off Mar 2016 | 650 Delancey St | bathroom remodel including new cabinets, fixtures & finishes. plumbing & electrical work under seperate permits. compliance with maher ordinance no 155-13 not required.Details
bathroom remodel including new cabinets, fixtures & finishes. plumbing & electrical work under seperate permits. compliance with maher ordinance no 155-13 not required. | $15,000 |
| Dec 7, 2009 | Completed final sign-off Apr 2010 | 650 Delancey St | live work unit 403, 4th floor. remodel 2 bathrooms. work to include new tile and paint, new cainets and plumbing fixtures. elec and plbg under separate permits. no wall removal or addition.Details
live work unit 403, 4th floor. remodel 2 bathrooms. work to include new tile and paint, new cainets and plumbing fixtures. elec and plbg under separate permits. no wall removal or addition. | $30,000 |
| Jul 16, 2007 | Completed final sign-off Oct 2007 | 3172 Sacramento St | bathroom remodel on 3/f. replacement of fixtures and finishes. no structural work. plumbing & electrical work under seperate permit.Details
bathroom remodel on 3/f. replacement of fixtures and finishes. no structural work. plumbing & electrical work under seperate permit. | $20,000 |
| Jan 27, 2006 | Completed final sign-off Dec 2006 | 3172 Sacramento St | kitchen remodel. new cabinets and appiances. bathroom remodel upstairs. bathroom fixture replacement only downstairs. plumbing and electrical work under seperate permits. kitchen 2nd floor. bathrooms on 2nd & 3rd floor.Details
kitchen remodel. new cabinets and appiances. bathroom remodel upstairs. bathroom fixture replacement only downstairs. plumbing and electrical work under seperate permits. kitchen 2nd floor. bathrooms on 2nd & 3rd floor. | $50,000 |
| Jan 16, 2004 | Completed final sign-off Dec 2004 | 3190 Sacramento St | remodel 1 kitchen & 2 bathrooms,(n)doorway in kitchen in non bearing wall,(n)pocket door in bathroomDetails
remodel 1 kitchen & 2 bathrooms,(n)doorway in kitchen in non bearing wall,(n)pocket door in bathroom | $40,000 |