Back to bathroom remodel contractors
Pinnacle Remodeling Construction
- Based in
- Daly City
- On San Francisco permits
- Sep 2003 to Dec 2025
- Last 24 months
- 5 permits filed
57 permits since 2000: 39 completed, 2 in progress, 8 never finaled, 8 expired or cancelled.
Of the 8 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
23 bathroom remodel permits: 14 completed, 1 in progress, 3 never finaled, 5 expired or cancelled. Typically 4 days from filing to permit and 272 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 26, 2025 | In progress issued May 2026 | 163 07th Av | provide steel beam at garage, partial 1/f lightwell infill. create full bath from 2/f water closet (unit 165). remodel kitchen and bath at 3/f (unit 163). modify roof terrace accessible from (e) 4th story. renovate bath. replace cabinetry at wet bar (unit 163)Details
provide steel beam at garage, partial 1/f lightwell infill. create full bath from 2/f water closet (unit 165). remodel kitchen and bath at 3/f (unit 163). modify roof terrace accessible from (e) 4th story. renovate bath. replace cabinetry at wet bar (unit 163) | $225,500 |
| Nov 4, 2024 | Completed final sign-off Aug 2025 | 81 Skyview Wy | revision to pa #202408168899: replace the footing below (e) post per structural plan. cosmetic remodel (e) kitchen & bathroom, add (n) powder room on 2/f. upgrade electrical fixtures on 2/f.Details
revision to pa #202408168899: replace the footing below (e) post per structural plan. cosmetic remodel (e) kitchen & bathroom, add (n) powder room on 2/f. upgrade electrical fixtures on 2/f. | $5,000 |
| Aug 16, 2024 | Completed final sign-off Aug 2025 | 81 Skyview Wy | add 2 bedrooms, 1 full bathroom, 1 laundry room, 1 family room, & 1 wet bar on 1/f per plan.Details
add 2 bedrooms, 1 full bathroom, 1 laundry room, 1 family room, & 1 wet bar on 1/f per plan. | $100,000 |
| Oct 29, 2021 | Never finaled issued Nov 2021, no final | 2643 38th Av | remodel (e) kitchen & (e) bathroom in-kind.Details
remodel (e) kitchen & (e) bathroom in-kind. | $20,000 |
| Aug 31, 2021 | Never finaled issued Sep 2021, no final | 45 Cleary Ct | unit #4: remodel 2 bathrooms like for like. remodel (1) kitchen like for like. non-structural. work in unit #4 only.Details
unit #4: remodel 2 bathrooms like for like. remodel (1) kitchen like for like. non-structural. work in unit #4 only. | $35,000 |
| Aug 24, 2021 | Expired or cancelled expired Apr 2025 | 863 Waller St | to comply with nov# 202180204.202181360.202180210.202179953 and to complete cnr permit to remodel kitchen and bathroom in unit 1,5,8,9, and 10. 2 kitchen remodel and 2 bathroom remodel in units #5 and #10. lighting comply with cec 150.0(k)Details
to comply with nov# 202180204.202181360.202180210.202179953 and to complete cnr permit to remodel kitchen and bathroom in unit 1,5,8,9, and 10. 2 kitchen remodel and 2 bathroom remodel in units #5 and #10. lighting comply with cec 150.0(k) | $25,000 |
| Aug 24, 2021 | Expired or cancelled expired Apr 2025 | 863 Waller St | apt 3: remodel ktichen and bathroom. no remove walls. lights per cenc 150.0(k)Details
apt 3: remodel ktichen and bathroom. no remove walls. lights per cenc 150.0(k) | $23,000 |
| Mar 23, 2021 | Completed final sign-off Dec 2021 | 310 Valdez Av | remodel (e) kitchen like to like. remodel 2 (e) bathroom like to like. no wall demolition; no change to layout.Details
remodel (e) kitchen like to like. remodel 2 (e) bathroom like to like. no wall demolition; no change to layout. | $25,000 |
| Jan 30, 2020 | Completed final sign-off May 2022 | 190 Lomita Av | 1st floor: remodel (e) laundry. 2nd floor: remodel/ relocate kitchen, modify (e) kitchen to bedroom, remodel (e) bathroom. 3rd floor: modify (e) master closet and bath to bedroom, turn (e) bathroom to two (n) bathrooms. modify (e) laundry to full bathDetails
1st floor: remodel (e) laundry. 2nd floor: remodel/ relocate kitchen, modify (e) kitchen to bedroom, remodel (e) bathroom. 3rd floor: modify (e) master closet and bath to bedroom, turn (e) bathroom to two (n) bathrooms. modify (e) laundry to full bath | $90,000 |
| Dec 18, 2019 | Never finaled issued Dec 2019, no final | 1 Daniel Burnham Ct | remodel existing kitchen like for like. remodel bathroom/replace tub w/ shower panDetails
remodel existing kitchen like for like. remodel bathroom/replace tub w/ shower pan | $35,000 |
| Oct 22, 2019 | Completed final sign-off Jun 2022 | 136 Lomita Av | 1st fl relocate laundry into e backroom. 2nd fl remove e kitchen, modify e kitchen to bedroom, e half bath to full bath. 3rd fl remodel e bath, new bedroom and modify e 3 clos bath to two full bath, replace all windowsDetails
1st fl relocate laundry into e backroom. 2nd fl remove e kitchen, modify e kitchen to bedroom, e half bath to full bath. 3rd fl remodel e bath, new bedroom and modify e 3 clos bath to two full bath, replace all windows | $85,000 |
| Aug 5, 2019 | Completed final sign-off Jun 2020 | 19 Riverton Dr | construct 2 bedrooms, 2 full bathrooms & media room @ ground floorDetails
construct 2 bedrooms, 2 full bathrooms & media room @ ground floor | $72,000 |
| Mar 28, 2019 | Completed final sign-off May 2019 | 1 Daniel Burnham Ct | remodel one bathroom, replace tile floor + shower tiles.Details
remodel one bathroom, replace tile floor + shower tiles. | $8,000 |
| Mar 12, 2018 | Expired or cancelled cancelled Jun 2018 | 3250 21st St | unit 1: bathroom remodel, remove tiles, vanity & water fixturesDetails
unit 1: bathroom remodel, remove tiles, vanity & water fixtures | $7,000 |
| Dec 14, 2017 | Completed final sign-off Sep 2018 | 800 27th Av | 1)remodel extg one bedroom & add one nw bathroom, one bedroom on 2nd fl per plan. 2)relocate the extg kitchen & dining room on 2nd fl. 3) add one entertainment room & bathroom on 1st floor per plans.Details
1)remodel extg one bedroom & add one nw bathroom, one bedroom on 2nd fl per plan. 2)relocate the extg kitchen & dining room on 2nd fl. 3) add one entertainment room & bathroom on 1st floor per plans. | $80,000 |
| Sep 7, 2017 | Completed final sign-off Oct 2022 | 1368 46th Av | horizontal additon at rear of (e) single family home at each flr, adding (n) bedrooms, bathroom, kitchen, dining & living room. proposed sprinkler system (nfpa-13r) under separate permit.Details
horizontal additon at rear of (e) single family home at each flr, adding (n) bedrooms, bathroom, kitchen, dining & living room. proposed sprinkler system (nfpa-13r) under separate permit. | $350,000 |
| Nov 5, 2014 | Completed final sign-off Aug 2015 | 3410 19th St | add 1 new full bath, relocate 1 (e) bathroom, add 1 shower room; . remodel kitchen. add office & study rooms, modify (e) bedroom #3. remove e bath, relocate and add shower at 2nd fl all work within interior of existing footprint.Details
add 1 new full bath, relocate 1 (e) bathroom, add 1 shower room; . remodel kitchen. add office & study rooms, modify (e) bedroom #3. remove e bath, relocate and add shower at 2nd fl all work within interior of existing footprint. | $22,000 |
| Apr 22, 2014 | Completed final sign-off Jun 2014 | 2743 37th Av | interior remodel: add a new half bathroom at 2nd floor. relocate laundry area to garage as per plan.Details
interior remodel: add a new half bathroom at 2nd floor. relocate laundry area to garage as per plan. | $3,800 |
| Oct 23, 2009 | Completed final sign-off Apr 2010 | 788 Huron Av | additional family room, study room, bathroom, recreation room & office at ground level.Details
additional family room, study room, bathroom, recreation room & office at ground level. | $30,200 |
| Nov 4, 2008 | Expired or cancelled expired Jun 2011 | 500 Hyde St | work @ unit#204. kitchen -demo existing cabinets/install new cabinets/countertops sink + tile floor. bath- replace shower valve. install new tile enclosure/toilet pedastal sink.Details
work @ unit#204. kitchen -demo existing cabinets/install new cabinets/countertops sink + tile floor. bath- replace shower valve. install new tile enclosure/toilet pedastal sink. | $20,000 |
| Nov 4, 2008 | Expired or cancelled expired Jan 2010 | 734 Bush St | work @ unit#65. kitchen -demo cabinets and install cabinet/sink, and tile floor. bath-replace shower valve, install new tile enclosure/toilet pedastal sink. electrical install 40 a sub-panel in unit.Details
work @ unit#65. kitchen -demo cabinets and install cabinet/sink, and tile floor. bath-replace shower valve, install new tile enclosure/toilet pedastal sink. electrical install 40 a sub-panel in unit. | $20,000 |
| May 19, 2008 | Completed final sign-off Sep 2008 | 93 Lakeshore Dr | garage floor remodeling: install (1) family room, (2) bedrooms, (1) bathroom, replace & enlarge (e) windows. 2nd floor remodeling: remodel (1) exist kitchen, (1) exist bathroom. install (1) new bathroom, replace all windows.Details
garage floor remodeling: install (1) family room, (2) bedrooms, (1) bathroom, replace & enlarge (e) windows. 2nd floor remodeling: remodel (1) exist kitchen, (1) exist bathroom. install (1) new bathroom, replace all windows. | $48,000 |
| Jul 17, 2007 | Completed final sign-off Apr 2008 | 230 Ney St | add two bedrooms, one bath, one storage at ground floor. replace rear portion of (e) concrete broken foundation. remodel one kitchen and three toilets in upper floorsDetails
add two bedrooms, one bath, one storage at ground floor. replace rear portion of (e) concrete broken foundation. remodel one kitchen and three toilets in upper floors | $30,000 |