Back to kitchen remodel contractors
Pinkowski Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2014 to Feb 2018
- Last 24 months
- 0 permits filed
7 permits since 2000: 6 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 2 completed, 1 expired or cancelled. Typically 8 days from filing to permit and 428 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 23, 2018 | Completed final sign-off Jul 2019 | 4508 Balboa St | remodel kitchen in-kind (no alteration of any walls)Details
remodel kitchen in-kind (no alteration of any walls) | $35,000 |
| Feb 22, 2018 | Expired or cancelled cancelled Jan 2026 | 4508 Balboa St | replace cabinets, remodel kitchen and bath, move exit door from side to rear yard.Details
replace cabinets, remodel kitchen and bath, move exit door from side to rear yard. | $35,000 |
| Jul 29, 2014 | Completed final sign-off Aug 2015 | 178 Stillings Av | remodel kitchen in same location ; replace cabinets, applicances, counter, add lighting. to comply cec 150.0(k)3Details
remodel kitchen in same location ; replace cabinets, applicances, counter, add lighting. to comply cec 150.0(k)3 | $40,000 |