Pinkowski Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2014 to Feb 2018
- Last 24 months
- 0 permits filed
7 permits since 2000: 6 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 62 days from filing to permit and 266 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 30, 2017 | Completed final sign-off May 2018 | 65 Alpine Tr | deck extension and new stair to grade, reconfiguration of 1st floor, install new french doors, replace extg door with window, new lighting, plumbing fixtures and finishes.Details
deck extension and new stair to grade, reconfiguration of 1st floor, install new french doors, replace extg door with window, new lighting, plumbing fixtures and finishes. | $65,000 |