Peterson Mullin Const
- Based in
- Tiburon
- On San Francisco permits
- Feb 2000 to Feb 2013
- Last 24 months
- 0 permits filed
114 permits since 2000: 58 completed, 21 never finaled, 35 expired or cancelled.
Of the 21 never-finaled permits, 21 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 3 completed, 1 never finaled. Typically 0 days from filing to permit and 145 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 27, 2011 | Completed final sign-off Mar 2012 | 229 07th Av | unit #229-remodel 3rd fl reconfigure some interior partitions, replace lath & plaster with sheetrock, insulate exterior walls & ceiling. remodel (e) bathroom & kitchen. add 1 new bathroom, rebuild portion of stairs to make code conforming, repl (e) windows at rear & side lightwell within (e) openingDetails
unit #229-remodel 3rd fl reconfigure some interior partitions, replace lath & plaster with sheetrock, insulate exterior walls & ceiling. remodel (e) bathroom & kitchen. add 1 new bathroom, rebuild portion of stairs to make code conforming, repl (e) windows at rear & side lightwell within (e) opening | $65,000 |
| Jun 10, 2011 | Never finaled issued Jun 2011, no final | 2050 Jefferson St | interior remodeling. non struc partiotions removal at 1st fl and n=bathrm. reconfigure laundry and mech equio at grg/1st fl. remodel 2nd fl kitc. poweder rm n stair to 1st fl. remodel 3rd fl bathrm and reconfigure partition to add 1 bathrm n closets. remodel 4th fl to relocate bathrm, create new cloDetails
interior remodeling. non struc partiotions removal at 1st fl and n=bathrm. reconfigure laundry and mech equio at grg/1st fl. remodel 2nd fl kitc. poweder rm n stair to 1st fl. remodel 3rd fl bathrm and reconfigure partition to add 1 bathrm n closets. remodel 4th fl to relocate bathrm, create new clo | $100,000 |
| Jun 23, 2010 | Completed final sign-off Nov 2011 | 368 Moultrie St | interior remodel of (e) kitchen in the 2nd fl, master bath and bedroom in the 1st floor. replace and repair wall and ceiling finishes as required for new work. replace rear windows and add new sliding door and window at master suite, add 2 skylights in stair lwell&kitch.replace rear siding w/stuccoDetails
interior remodel of (e) kitchen in the 2nd fl, master bath and bedroom in the 1st floor. replace and repair wall and ceiling finishes as required for new work. replace rear windows and add new sliding door and window at master suite, add 2 skylights in stair lwell&kitch.replace rear siding w/stucco | $100,000 |
| Oct 2, 2000 | Completed final sign-off Nov 2000 | 249 17th Av | install new concrete patio w/garden walls, repair rear stairs,fix dryrot at rear bldgDetails
install new concrete patio w/garden walls, repair rear stairs,fix dryrot at rear bldg | $1,500 |