Back to kitchen remodel contractors
Peterson Mullin Const
- Based in
- Tiburon
- On San Francisco permits
- Feb 2000 to Feb 2013
- Last 24 months
- 0 permits filed
114 permits since 2000: 58 completed, 21 never finaled, 35 expired or cancelled.
Of the 21 never-finaled permits, 21 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 7 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 281 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 21, 2012 | Expired or cancelled expired Jun 2018 | 64 Whitney St | remodel existing kitchen & bathroom, remove portion of wall between kitchen & dining room. install 4 new windows & 1 new door at rear bedroom. replace siding at rear where new windows & door are. repair/reroof flat roof at rear bedroom. install new laundry closet.Details
remodel existing kitchen & bathroom, remove portion of wall between kitchen & dining room. install 4 new windows & 1 new door at rear bedroom. replace siding at rear where new windows & door are. repair/reroof flat roof at rear bedroom. install new laundry closet. | $55,000 |
| Oct 27, 2011 | Completed final sign-off Mar 2012 | 229 07th Av | unit #229-remodel 3rd fl reconfigure some interior partitions, replace lath & plaster with sheetrock, insulate exterior walls & ceiling. remodel (e) bathroom & kitchen. add 1 new bathroom, rebuild portion of stairs to make code conforming, repl (e) windows at rear & side lightwell within (e) openingDetails
unit #229-remodel 3rd fl reconfigure some interior partitions, replace lath & plaster with sheetrock, insulate exterior walls & ceiling. remodel (e) bathroom & kitchen. add 1 new bathroom, rebuild portion of stairs to make code conforming, repl (e) windows at rear & side lightwell within (e) opening | $65,000 |
| Jun 29, 2011 | Never finaled issued Jul 2011, no final | 1675 48th Av | replace roof, 2nd floor and wall due to fire damaged reconfigure kitchen and baths. replace extg doors, windows and skylights, new slab on grade at rear lowered floor. new front facade. new roof deck at rear, structural upgrade plans.Details
replace roof, 2nd floor and wall due to fire damaged reconfigure kitchen and baths. replace extg doors, windows and skylights, new slab on grade at rear lowered floor. new front facade. new roof deck at rear, structural upgrade plans. | $75,000 |
| Jun 23, 2010 | Completed final sign-off Nov 2011 | 368 Moultrie St | interior remodel of (e) kitchen in the 2nd fl, master bath and bedroom in the 1st floor. replace and repair wall and ceiling finishes as required for new work. replace rear windows and add new sliding door and window at master suite, add 2 skylights in stair lwell&kitch.replace rear siding w/stuccoDetails
interior remodel of (e) kitchen in the 2nd fl, master bath and bedroom in the 1st floor. replace and repair wall and ceiling finishes as required for new work. replace rear windows and add new sliding door and window at master suite, add 2 skylights in stair lwell&kitch.replace rear siding w/stucco | $100,000 |
| Aug 22, 2005 | Never finaled issued Aug 2005, no final | 166 Sears St | remodel kitchen, 3 baths, replace sheetrock, tape, and paint. flourescent lightsDetails
remodel kitchen, 3 baths, replace sheetrock, tape, and paint. flourescent lights | $20,000 |
| Nov 24, 2004 | Completed final sign-off Mar 2005 | 2067 23rd Av | remodel kitchen & living room - no structural work, flr light on 1st switch at kitchenDetails
remodel kitchen & living room - no structural work, flr light on 1st switch at kitchen | $5,000 |
| Oct 6, 2004 | Completed final sign-off May 2006 | 366 Liberty St | remodel (e) 3 bedrooms & 1 kitchen. remove sheetrock were needed & make repairs were needed.Details
remodel (e) 3 bedrooms & 1 kitchen. remove sheetrock were needed & make repairs were needed. | $21,800 |
| Feb 4, 2004 | Completed final sign-off Dec 2004 | 3042 Jackson St | #2- remodel (e)kitchen/bath,remove/replace lath/plaster with 5/8"type x drywall.no structural work.Details
#2- remodel (e)kitchen/bath,remove/replace lath/plaster with 5/8"type x drywall.no structural work. | $25,000 |
| Mar 27, 2000 | Completed final sign-off Jan 2001 | 2519 Chestnut St | remodel 3 bathrooms & 1 kitchen, install new windows at rear,replace dryrot at rear wall & crackedDetails
remodel 3 bathrooms & 1 kitchen, install new windows at rear,replace dryrot at rear wall & cracked | |
| Feb 22, 2000 | Completed final sign-off Jul 2000 | 775 Noe St | convert 2 unit bldg to single family,delete upstairs kitchen, rev to appl #9816508 & 20000131689Details
convert 2 unit bldg to single family,delete upstairs kitchen, rev to appl #9816508 & 20000131689 |