Back to bathroom remodel contractors
Peter Harris Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Aug 2024
- Last 24 months
- 0 permits filed
105 permits since 2000: 81 completed, 1 in progress, 4 never finaled, 19 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
21 bathroom remodel permits: 20 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 286 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 20, 2022 | Completed final sign-off Aug 2024 | 4034 20th St | bldg a: revision to pa# 202110019684. structural details and relocation of half bath on 3rd fl.Details
bldg a: revision to pa# 202110019684. structural details and relocation of half bath on 3rd fl. | |
| Apr 14, 2022 | Completed final sign-off Feb 2026 | 4040 20th St | sb9 application: construct new 3 story over 1 basement, type 5, two family dwelling per sb9(senate bill 9). upper unit with 3 bedroom 2.5 bathrooms & roof deck. 2nd unit: 2 bedroom and 2 bathrooms.Details
sb9 application: construct new 3 story over 1 basement, type 5, two family dwelling per sb9(senate bill 9). upper unit with 3 bedroom 2.5 bathrooms & roof deck. 2nd unit: 2 bedroom and 2 bathrooms. | $757,609 |
| Jun 12, 2020 | Completed final sign-off May 2022 | 4042 20th St | add adu per ordinance 95-17 at ground level with one bedroom and one bathroom. replace windows at front and back, add entry door. eliminate interior stair. add 6' metal fence and gate at property line 80% open. rebuild existing front stairs. relocate gas and electric meters.Details
add adu per ordinance 95-17 at ground level with one bedroom and one bathroom. replace windows at front and back, add entry door. eliminate interior stair. add 6' metal fence and gate at property line 80% open. rebuild existing front stairs. relocate gas and electric meters. | $80,000 |
| Oct 26, 2017 | Completed final sign-off Aug 2018 | 59 Manzanita Av | at exterior, replace select(r) windows and doors in (e) location. new deck at rear yard. bathroom remodel. (n) electrical and lighting work. (n) radiant floorheating and retrofit radiant floor heating to replace forced air system. skylight replacement.Details
at exterior, replace select(r) windows and doors in (e) location. new deck at rear yard. bathroom remodel. (n) electrical and lighting work. (n) radiant floorheating and retrofit radiant floor heating to replace forced air system. skylight replacement. | $175,000 |
| Oct 27, 2015 | Completed final sign-off Dec 2016 | 946 Ashbury St | interior remodeling at 3rd level including replacing existing bathroom finishes, fixtures, & plumbing. add dormer & skylights @ bathroom.Details
interior remodeling at 3rd level including replacing existing bathroom finishes, fixtures, & plumbing. add dormer & skylights @ bathroom. | $10,000 |
| Jul 17, 2015 | Completed final sign-off Jul 2016 | 946 Ashbury St | interior remodel of kitchen and bathrooms. install new elevator and revise stair per plan. relocate the rear stair at deck which is less than 30" from grade.Details
interior remodel of kitchen and bathrooms. install new elevator and revise stair per plan. relocate the rear stair at deck which is less than 30" from grade. | $200,000 |
| Jun 4, 2015 | Completed final sign-off Mar 2016 | 352 Lake St | gut and remodel 3rd fl split bathroom. add water closet oni top floor. no structural changesDetails
gut and remodel 3rd fl split bathroom. add water closet oni top floor. no structural changes | $48,000 |
| Jul 15, 2014 | Completed final sign-off Dec 2014 | 1415 Shrader St | interior renovation to include kitchen and bath improvement. removal of (e) steel shear frame and installatio of (n) monent fram, new glass guardrail @(e) stair and new lighting. all work is in interior only.Details
interior renovation to include kitchen and bath improvement. removal of (e) steel shear frame and installatio of (n) monent fram, new glass guardrail @(e) stair and new lighting. all work is in interior only. | $150,000 |
| Nov 15, 2012 | Completed final sign-off Apr 2014 | 4022 21st St | replace gate at front with weather tight door. remove one of 2 extg interior stairs that connect second floor to 1st floor, then alter the remaining stair to access the 1st floor.remodel 1st floor extg bathroom and new windows and doors at rear. new garage door. remodel 2nd floor extg kitchen andDetails
replace gate at front with weather tight door. remove one of 2 extg interior stairs that connect second floor to 1st floor, then alter the remaining stair to access the 1st floor.remodel 1st floor extg bathroom and new windows and doors at rear. new garage door. remodel 2nd floor extg kitchen and | $50,000 |
| Oct 11, 2012 | Completed final sign-off Aug 2013 | 1980 Vallejo St | unit #2 new finishes in (3) bathrooms. adding an a/c unit, adding storage/built ins intalling lights fixts & outlets.Details
unit #2 new finishes in (3) bathrooms. adding an a/c unit, adding storage/built ins intalling lights fixts & outlets. | $50,000 |
| Jun 14, 2012 | Completed final sign-off Feb 2013 | 3737 16th St | revision to 201201252834. structural revisions and clarifications. architectural plans showing existing and proposed kitchen and bath, window changes , new fireplace, misc specsDetails
revision to 201201252834. structural revisions and clarifications. architectural plans showing existing and proposed kitchen and bath, window changes , new fireplace, misc specs | $100 |
| Jan 25, 2012 | Completed final sign-off Feb 2013 | 3737 16th St | expand opening in interior walls, both sides of kitchen, remove & replace finishes in kitchen & 3 (e) bathrooms. new cabinets, trim, plumbing, electrical, fixtures. new tile. no additional sq ft.Details
expand opening in interior walls, both sides of kitchen, remove & replace finishes in kitchen & 3 (e) bathrooms. new cabinets, trim, plumbing, electrical, fixtures. new tile. no additional sq ft. | $195,000 |
| Dec 23, 2011 | Completed final sign-off Jun 2012 | 66 Saint Francis Bl | kitchen remodel @ ground floor with new combined mud/laundry/bathroom& new exterior deck, voluntary structural strengthening @ basement.Details
kitchen remodel @ ground floor with new combined mud/laundry/bathroom& new exterior deck, voluntary structural strengthening @ basement. | $45,000 |
| Feb 9, 2010 | Completed final sign-off Dec 2010 | 3016 Pine St | remove &replace finishes, cabinets, tile, hardwood, drywall in kitchen, master bath, 2nd. floor bath, living/dining room. (n) plumbing & electrical, non-structural work.provide high efficency lighting/manual on occupancy sensor per title 24 mandatory measures.Details
remove &replace finishes, cabinets, tile, hardwood, drywall in kitchen, master bath, 2nd. floor bath, living/dining room. (n) plumbing & electrical, non-structural work.provide high efficency lighting/manual on occupancy sensor per title 24 mandatory measures. | $125,000 |
| Nov 20, 2009 | Expired or cancelled expired May 2011 | 1090 Dolores St | revision to applications 2009-0205-1446 & 200910098742. change (e) rear storage room into habitable space with half bathroom, change heating system for the building to radiant heat and add a washer/dryer to unit #2. no exterior changes or structural work.Details
revision to applications 2009-0205-1446 & 200910098742. change (e) rear storage room into habitable space with half bathroom, change heating system for the building to radiant heat and add a washer/dryer to unit #2. no exterior changes or structural work. | $5,000 |
| Jun 13, 2008 | Completed final sign-off Sep 2008 | 171 14th Av | remove and replace finishes and fixtures of top floor bathroom, no structural work. new lighting controlled by occupancy sensors.Details
remove and replace finishes and fixtures of top floor bathroom, no structural work. new lighting controlled by occupancy sensors. | $30,000 |
| Feb 8, 2007 | Completed final sign-off Jun 2007 | 144 Clipper St | revision to pa#200506235879. delete master bath (sheet a1.2)Details
revision to pa#200506235879. delete master bath (sheet a1.2) | |
| May 1, 2006 | Completed final sign-off Oct 2006 | 30 Loma Vista Tr | gut and remodel master bathroom. no structural work. no change to exteriorDetails
gut and remodel master bathroom. no structural work. no change to exterior | $25,000 |
| Mar 30, 2006 | Completed final sign-off Jan 2007 | 171 14th Av | renovation of e bathroom, addition of new bath, updating/replacing e double hung windows with n double glazed windows, renovating e closets, add skylight 5'4" from prop lineDetails
renovation of e bathroom, addition of new bath, updating/replacing e double hung windows with n double glazed windows, renovating e closets, add skylight 5'4" from prop line | $50,000 |
| Nov 13, 2003 | Completed final sign-off Feb 2004 | 112 30th St | gut & redo finished on kitchen & bathroom no structural work to be performed. no structural changeDetails
gut & redo finished on kitchen & bathroom no structural work to be performed. no structural change | $30,000 |
| Oct 10, 2003 | Completed final sign-off Jan 2004 | 2201 Leavenworth St | patch walls &ceilings for lighting, replace ceiling in 2 bath&kitchen for lighting.replace insulatioDetails
patch walls &ceilings for lighting, replace ceiling in 2 bath&kitchen for lighting.replace insulatio | $4,500 |