Back to kitchen remodel contractors
Peter Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Dec 2009 to Oct 2019
- Last 24 months
- 0 permits filed
14 permits since 2000: 11 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 5 days from filing to permit and 231 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 25, 2018 | Completed final sign-off Jan 2020 | 255 Minerva St | legalize as-built unit(unit b) on basement fl w/ two bedrms, one kitchen, one 3-fixture bath & dining/living rm per plan. per ord# 43-14.Details
legalize as-built unit(unit b) on basement fl w/ two bedrms, one kitchen, one 3-fixture bath & dining/living rm per plan. per ord# 43-14. | $20,000 |
| Aug 3, 2012 | Completed final sign-off Sep 2012 | 2630 23rd Av | kitchen remodelling: change new cabinet & countertop, no wall relocation. a minimum of 50% of the total rated wattage of permanently installed lighting in kitchen shall be high efficacy - cec 150(k)8.Details
kitchen remodelling: change new cabinet & countertop, no wall relocation. a minimum of 50% of the total rated wattage of permanently installed lighting in kitchen shall be high efficacy - cec 150(k)8. | $3,000 |
| Feb 18, 2011 | Completed final sign-off Feb 2012 | 47 Tingley St | to comply with nov 200735038 of 12.20.07: add family room, two bedrooms & two bathrooms on 1st floor. add one bathroom & bedrom & kitchen remodeling on 2nd floor.Details
to comply with nov 200735038 of 12.20.07: add family room, two bedrooms & two bathrooms on 1st floor. add one bathroom & bedrom & kitchen remodeling on 2nd floor. | $60,000 |