Back to bathroom remodel contractors
Peter Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Dec 2009 to Oct 2019
- Last 24 months
- 0 permits filed
14 permits since 2000: 11 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 8 completed, 1 never finaled, 1 expired or cancelled. Typically 2 days from filing to permit and 148 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 25, 2018 | Completed final sign-off Jan 2020 | 255 Minerva St | legalize as-built unit(unit b) on basement fl w/ two bedrms, one kitchen, one 3-fixture bath & dining/living rm per plan. per ord# 43-14.Details
legalize as-built unit(unit b) on basement fl w/ two bedrms, one kitchen, one 3-fixture bath & dining/living rm per plan. per ord# 43-14. | $20,000 |
| Nov 10, 2016 | Completed final sign-off Feb 2017 | 269 Victoria St | add 2 bedrooms, one and half bath and relocated washer and dryer at 1st floor per planDetails
add 2 bedrooms, one and half bath and relocated washer and dryer at 1st floor per plan | $39,500 |
| Nov 1, 2016 | Never finaled issued Nov 2016, no final | 255 Minerva St | repair or fix the siding of the house at the rear. not visible from street. also, repaint the flat roof and fix or repair tile in the bathroom.Details
repair or fix the siding of the house at the rear. not visible from street. also, repaint the flat roof and fix or repair tile in the bathroom. | $1,000 |
| Jun 18, 2013 | Completed final sign-off Aug 2013 | 241 Everglade Dr | remodel one bathroom on 2nd floor and replace a new electrical panel service. no change in wall & opening layout. bathroom lighting shall be high efficiency or controlled by mnaul on sensors.Details
remodel one bathroom on 2nd floor and replace a new electrical panel service. no change in wall & opening layout. bathroom lighting shall be high efficiency or controlled by mnaul on sensors. | $4,000 |
| Nov 5, 2012 | Completed final sign-off Apr 2013 | 2366 32nd Av | convert (e) storage room to 1 bedroom, add 1 bedroom, 1 bathroom & 1 storage room on 1st floor per plan (garage)Details
convert (e) storage room to 1 bedroom, add 1 bedroom, 1 bathroom & 1 storage room on 1st floor per plan (garage) | $38,000 |
| Dec 20, 2011 | Completed final sign-off May 2012 | 136 Del Monte St | add 2 bedrooms, office, full bath, powder room and laundry area on 1st floorDetails
add 2 bedrooms, office, full bath, powder room and laundry area on 1st floor | $40,000 |
| Mar 21, 2011 | Completed final sign-off May 2012 | 47 Tingley St | revision to permit #201102180569. switching location of bathroom on 2nd floor.Details
revision to permit #201102180569. switching location of bathroom on 2nd floor. | |
| Feb 18, 2011 | Completed final sign-off Feb 2012 | 47 Tingley St | to comply with nov 200735038 of 12.20.07: add family room, two bedrooms & two bathrooms on 1st floor. add one bathroom & bedrom & kitchen remodeling on 2nd floor.Details
to comply with nov 200735038 of 12.20.07: add family room, two bedrooms & two bathrooms on 1st floor. add one bathroom & bedrom & kitchen remodeling on 2nd floor. | $60,000 |
| Dec 15, 2010 | Expired or cancelled cancelled Aug 2022 | 47 Tingley St | remodel master bedroom & bathroom, relcoate ktichen & add one bath at 2nd floor; construct 2 bedrooms, 2 bathrooms, family room, laundry area at ground floor.Details
remodel master bedroom & bathroom, relcoate ktichen & add one bath at 2nd floor; construct 2 bedrooms, 2 bathrooms, family room, laundry area at ground floor. | $50,000 |
| Oct 5, 2010 | Completed final sign-off Feb 2011 | 765 Athens St | add 2 bed rooms, 2 bathrooms, playroom, family room, storage and laundry area at extg ground floor.Details
add 2 bed rooms, 2 bathrooms, playroom, family room, storage and laundry area at extg ground floor. | $50,000 |