Back to kitchen remodel contractors
Pete Moffat Construction Inc
- Based in
- Palo Alto
- On San Francisco permits
- Nov 2004 to Jul 2025
- Last 24 months
- 2 permits filed
60 permits since 2000: 49 completed, 2 never finaled, 9 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 76 days from filing to permit and 303 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 24, 2023 | Completed final sign-off Feb 2024 | 3766 22nd St | interior remodel of extg kitchen & powder rm located on 2nd flr. minor wall no-bearing interior layout change to create pantry. no new plumbing locations being added (replaced in same location). remodel area is approx 390sfDetails
interior remodel of extg kitchen & powder rm located on 2nd flr. minor wall no-bearing interior layout change to create pantry. no new plumbing locations being added (replaced in same location). remodel area is approx 390sf | $150,000 |
| Jul 12, 2018 | Completed final sign-off Mar 2020 | 755 Marina Bl | remodel (e) kitc & 2 baths, add (n) ext stair at lightwell to kitchen, replace windows at 1st and 2nd flrs per plans, replace (e) rear yard deck/stair w/(n) smaller deck and sprial stair. door and window remodel at 1st flr. fdtn rpr.remove bsmt cooktop to comply w/'87 nsr d943214 wetbar/fullbath okDetails
remodel (e) kitc & 2 baths, add (n) ext stair at lightwell to kitchen, replace windows at 1st and 2nd flrs per plans, replace (e) rear yard deck/stair w/(n) smaller deck and sprial stair. door and window remodel at 1st flr. fdtn rpr.remove bsmt cooktop to comply w/'87 nsr d943214 wetbar/fullbath ok | $900,000 |
| Oct 22, 2014 | Completed final sign-off Dec 2023 | 660 Sanchez St | full exterior & interior remodel, including bathrooms & kitchen excavation for garage & utiities/storage addition at rear of building.Details
full exterior & interior remodel, including bathrooms & kitchen excavation for garage & utiities/storage addition at rear of building. | $930,000 |
| Sep 18, 2012 | Completed final sign-off Jul 2013 | 1998 Vallejo St | remove non bearing partition walls between dining room and living room and dining room and entry. replace kitchen countertops. add tv cabinet at living room fireplace. interior remodel onlyDetails
remove non bearing partition walls between dining room and living room and dining room and entry. replace kitchen countertops. add tv cabinet at living room fireplace. interior remodel only | $10,000 |
| Sep 18, 2012 | Completed final sign-off Sep 2013 | 1998 Vallejo St | remove non bearing partition walls between dining room and living room oand dining room and entry.patac and repair hardwood floors. replace kitchen countertops. interior remodel onlyDetails
remove non bearing partition walls between dining room and living room oand dining room and entry.patac and repair hardwood floors. replace kitchen countertops. interior remodel only | $10,000 |