Back to bathroom remodel contractors
Pete Moffat Construction Inc
- Based in
- Palo Alto
- On San Francisco permits
- Nov 2004 to Jul 2025
- Last 24 months
- 2 permits filed
60 permits since 2000: 49 completed, 2 never finaled, 9 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 6 completed. Typically 40 days from filing to permit and 386 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 7, 2024 | Completed final sign-off Apr 2025 | 450 02nd Av | remodel of an existing bathroomDetails
remodel of an existing bathroom | $25,000 |
| Mar 5, 2021 | Completed final sign-off Sep 2021 | 3045 Jackson St | repair master bath and hallway due to water damage. no exterior work. no walls changed. repair floor finish.Details
repair master bath and hallway due to water damage. no exterior work. no walls changed. repair floor finish. | $20,000 |
| Aug 6, 2019 | Completed final sign-off Dec 2020 | 689 Minna St | exterior infill at (e) bathroom to repair roof & envelope. new parapet wall & fence. remove (e) skylights & (e) fireplace.Details
exterior infill at (e) bathroom to repair roof & envelope. new parapet wall & fence. remove (e) skylights & (e) fireplace. | $15,000 |
| Jul 12, 2018 | Completed final sign-off Mar 2020 | 755 Marina Bl | remodel (e) kitc & 2 baths, add (n) ext stair at lightwell to kitchen, replace windows at 1st and 2nd flrs per plans, replace (e) rear yard deck/stair w/(n) smaller deck and sprial stair. door and window remodel at 1st flr. fdtn rpr.remove bsmt cooktop to comply w/'87 nsr d943214 wetbar/fullbath okDetails
remodel (e) kitc & 2 baths, add (n) ext stair at lightwell to kitchen, replace windows at 1st and 2nd flrs per plans, replace (e) rear yard deck/stair w/(n) smaller deck and sprial stair. door and window remodel at 1st flr. fdtn rpr.remove bsmt cooktop to comply w/'87 nsr d943214 wetbar/fullbath ok | $900,000 |
| May 23, 2016 | Completed final sign-off Dec 2017 | 2950 Broadway | revision to pa 2012-0604-1778 and 2015-0414-3616 modifications to interior paritions; change bathroom location on level 4, misc structural revisions.Details
revision to pa 2012-0604-1778 and 2015-0414-3616 modifications to interior paritions; change bathroom location on level 4, misc structural revisions. | $50,000 |
| Oct 22, 2014 | Completed final sign-off Dec 2023 | 660 Sanchez St | full exterior & interior remodel, including bathrooms & kitchen excavation for garage & utiities/storage addition at rear of building.Details
full exterior & interior remodel, including bathrooms & kitchen excavation for garage & utiities/storage addition at rear of building. | $930,000 |