Back to kitchen remodel contractors
Perloff Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Jul 2002
- Last 24 months
- 0 permits filed
12 permits since 2000: 7 completed, 5 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 2 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 142 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 15, 2002 | Completed final sign-off Mar 2003 | 252 States St | replace/remodel kitchen and 2 bathrooms, replace (e) stairs w/ new steel staircaseDetails
replace/remodel kitchen and 2 bathrooms, replace (e) stairs w/ new steel staircase | $60,000 |
| May 1, 2001 | Expired or cancelled expired Sep 2001 | 360 Liberty St | remove finishes (wall) down to studs areas include kitchen bathrooms and tw0 bedrooms explore demoDetails
remove finishes (wall) down to studs areas include kitchen bathrooms and tw0 bedrooms explore demo | $5,000 |
| Jan 17, 2001 | Completed final sign-off Feb 2001 | 1990 Green St | new kitchen cabinets,crown moulding,(n)hardwood flrs,(n)can trims & switches.cosmetic work.non strucDetails
new kitchen cabinets,crown moulding,(n)hardwood flrs,(n)can trims & switches.cosmetic work.non struc | $15,000 |