Perloff Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Jul 2002
- Last 24 months
- 0 permits filed
12 permits since 2000: 7 completed, 5 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 1 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 150 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 30, 2001 | Completed final sign-off Apr 2002 | 4122 20th St | new ground level deck. w/(n) hot tub. replace/enlarge exiting footings for added hot tub loadDetails
new ground level deck. w/(n) hot tub. replace/enlarge exiting footings for added hot tub load | $6,000 |
| Jul 5, 2001 | Expired or cancelled expired Jul 2002 | 360 Liberty St | rebuilt exterior deck, interior remodel according to drawing, lower the lower floor about 1 ft.Details
rebuilt exterior deck, interior remodel according to drawing, lower the lower floor about 1 ft. | $200,000 |