Back to kitchen remodel contractors
Period Restoration Dba Condylis Baier
- Based in
- Oakland
- On San Francisco permits
- Aug 2005 to Aug 2023
- Last 24 months
- 0 permits filed
20 permits since 2000: 16 completed, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 6 completed. Typically 1 days from filing to permit and 456 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 3, 2022 | Completed final sign-off Sep 2023 | 1100 Union St | kitchen remodel: non structuralDetails
kitchen remodel: non structural | $150,000 |
| Feb 3, 2020 | Completed final sign-off Jan 2021 | 320 Santa Ana Av | kitchen remodel: relace cabinets, appliances, update electrical as required, new counters, sink, tile floor, paint, (appliances, sink, etc, same locations) +- 12x12Details
kitchen remodel: relace cabinets, appliances, update electrical as required, new counters, sink, tile floor, paint, (appliances, sink, etc, same locations) +- 12x12 | $50,000 |
| Dec 17, 2014 | Completed final sign-off Aug 2017 | 2698 Pacific Av | rev. to 201312315387. internal reconf baths,bed,closets,kitchen.remove skylite(proposed ones only)@ north wall. g/f:keep orig window(no longer chgs),seal windows@south wall near grd(not visable fr street). widen stair to 4/f.remove window @ north 4th ctrl ct & switch fr wood to steel doors.Details
rev. to 201312315387. internal reconf baths,bed,closets,kitchen.remove skylite(proposed ones only)@ north wall. g/f:keep orig window(no longer chgs),seal windows@south wall near grd(not visable fr street). widen stair to 4/f.remove window @ north 4th ctrl ct & switch fr wood to steel doors. | |
| Dec 31, 2013 | Completed final sign-off Aug 2017 | 2698 Pacific Av | gr/fl create garage at e social rm, 2 beds, 2 baths, add elevator, wine rm, laundry, exercise rm, family rm. 2/f remodel kitchen, add powder rm, remove e stair @ north & create balcony. flip east e stair direction (keep landing), n windows @ north popout. laminate glass all other windows.Details
gr/fl create garage at e social rm, 2 beds, 2 baths, add elevator, wine rm, laundry, exercise rm, family rm. 2/f remodel kitchen, add powder rm, remove e stair @ north & create balcony. flip east e stair direction (keep landing), n windows @ north popout. laminate glass all other windows. | $350,000 |
| Aug 15, 2012 | Completed final sign-off Apr 2013 | 173 Merced Av | kitchen remodel, in kind window replacementDetails
kitchen remodel, in kind window replacement | $25,000 |
| Feb 24, 2006 | Completed final sign-off Nov 2006 | 2020 Broadway | complete kitchen remodel. new cabinets, appliances, plumbing, electrical, finish floor, blueboard & plaster. no structural changes. contact bldg insp at the start of job to review scope. additional plans & permits may be required.Details
complete kitchen remodel. new cabinets, appliances, plumbing, electrical, finish floor, blueboard & plaster. no structural changes. contact bldg insp at the start of job to review scope. additional plans & permits may be required. | $450,000 |