Back to bathroom remodel contractors
Period Restoration Dba Condylis Baier
- Based in
- Oakland
- On San Francisco permits
- Aug 2005 to Aug 2023
- Last 24 months
- 0 permits filed
20 permits since 2000: 16 completed, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 expired or cancelled. Typically 2 days from filing to permit and 622 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 28, 2020 | Completed final sign-off Jan 2021 | 320 Santa Ana Av | bathroom remodel: replace vanity, sinks, tile floor, shower, paint. update electrical and plumbing as required. dryrot repair to subfloor and floor joists(2) (sister if required) repair in kindDetails
bathroom remodel: replace vanity, sinks, tile floor, shower, paint. update electrical and plumbing as required. dryrot repair to subfloor and floor joists(2) (sister if required) repair in kind | $25,000 |
| Sep 9, 2019 | Expired or cancelled expired Aug 2022 | 1188 Lombard St | remodel of exiting 2nd floor bathroom, and laundry room. install 2 new beams. remove extg 2 bathroom wallsDetails
remodel of exiting 2nd floor bathroom, and laundry room. install 2 new beams. remove extg 2 bathroom walls | $90,000 |
| Aug 15, 2019 | Completed final sign-off Sep 2019 | 1188 Lombard St | exploratory demolition of finishes (drywall, tile, etc). no framing to be altered. less than 50 sq ft bathroom on 2nd flDetails
exploratory demolition of finishes (drywall, tile, etc). no framing to be altered. less than 50 sq ft bathroom on 2nd fl | $1,500 |
| Dec 17, 2014 | Completed final sign-off Aug 2017 | 2698 Pacific Av | rev. to 201312315387. internal reconf baths,bed,closets,kitchen.remove skylite(proposed ones only)@ north wall. g/f:keep orig window(no longer chgs),seal windows@south wall near grd(not visable fr street). widen stair to 4/f.remove window @ north 4th ctrl ct & switch fr wood to steel doors.Details
rev. to 201312315387. internal reconf baths,bed,closets,kitchen.remove skylite(proposed ones only)@ north wall. g/f:keep orig window(no longer chgs),seal windows@south wall near grd(not visable fr street). widen stair to 4/f.remove window @ north 4th ctrl ct & switch fr wood to steel doors. | |
| Dec 31, 2013 | Completed final sign-off Aug 2017 | 2698 Pacific Av | gr/fl create garage at e social rm, 2 beds, 2 baths, add elevator, wine rm, laundry, exercise rm, family rm. 2/f remodel kitchen, add powder rm, remove e stair @ north & create balcony. flip east e stair direction (keep landing), n windows @ north popout. laminate glass all other windows.Details
gr/fl create garage at e social rm, 2 beds, 2 baths, add elevator, wine rm, laundry, exercise rm, family rm. 2/f remodel kitchen, add powder rm, remove e stair @ north & create balcony. flip east e stair direction (keep landing), n windows @ north popout. laminate glass all other windows. | $350,000 |