Back to bathroom remodel contractors
Perez Construction Llc.
- Based in
- San Francisco
- On San Francisco permits
- Sep 2014 to Aug 2026
- Last 24 months
- 48 permits filed
157 permits since 2000: 126 completed, 13 in progress, 11 never finaled, 7 expired or cancelled.
Of the 11 never-finaled permits, 3 are 3 to 5 years old, 8 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
63 bathroom remodel permits: 49 completed, 6 in progress, 6 never finaled, 2 expired or cancelled. Typically 8 days from filing to permit and 163 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 25, 2026 | In progress issued Aug 2026 | 282 Eureka St | kitchen renovation w/ (n) fixtures, finishes, cabinets, & appliances, modify interior openings @ kitchen, breakfast, entry, & family rooms @ 2nd fl. convert (e) closets @ 3rd fl to (n) main bath w/ (n) skylight. install (n) exterior doors & windows within (e) openings all flrs. repair/replace (e)...Details
kitchen renovation w/ (n) fixtures, finishes, cabinets, & appliances, modify interior openings @ kitchen, breakfast, entry, & family rooms @ 2nd fl. convert (e) closets @ 3rd fl to (n) main bath w/ (n) skylight. install (n) exterior doors & windows within (e) openings all flrs. repair/replace (e)... | $55,000 |
| Apr 29, 2026 | In progress issued May 2026 | 617 Mississippi St | to remodel unit 617 on 3rd floor, including a new kitchen location, renovated bathroom & add a new bathroom.Details
to remodel unit 617 on 3rd floor, including a new kitchen location, renovated bathroom & add a new bathroom. | $75,000 |
| Apr 9, 2026 | In progress issued Jul 2026 | 4019 Cesar Chavez St | interior remodel (no changes to exterior facade) including additon of 2 new baths, 1 new office space @ garage. associated structural work as required.Details
interior remodel (no changes to exterior facade) including additon of 2 new baths, 1 new office space @ garage. associated structural work as required. | $150,000 |
| Mar 19, 2026 | Completed final sign-off Aug 2026 | 1853 15th Av | remodel 2 (e) bathrooms and retile one shower in master bathroom in sfd.Details
remodel 2 (e) bathrooms and retile one shower in master bathroom in sfd. | $38,000 |
| Mar 11, 2026 | Completed final sign-off May 2026 | 95 High St | unit 1- remodel two (e) bathrooms on lower levelDetails
unit 1- remodel two (e) bathrooms on lower level | $30,000 |
| Feb 13, 2026 | Completed final sign-off May 2026 | 2315 Broadway | removal of (e) winding stair & extension of 3-flight stair from 2nd flr of the dwelling unit to 3rd flr. relocation of (e) laundry on 3rd flr to new location, new layout for bath 204, removal of 5 windows & replacement of one window in-kind @ north facade.Details
removal of (e) winding stair & extension of 3-flight stair from 2nd flr of the dwelling unit to 3rd flr. relocation of (e) laundry on 3rd flr to new location, new layout for bath 204, removal of 5 windows & replacement of one window in-kind @ north facade. | $10,000 |
| Dec 10, 2025 | Completed final sign-off Jun 2026 | 115 Nevada St | interior remodel - level 1 bath 404 sf of renovation within level 1 only existing office, living room, bath. new storageDetails
interior remodel - level 1 bath 404 sf of renovation within level 1 only existing office, living room, bath. new storage | $95,000 |
| Oct 23, 2025 | Completed final sign-off Sep 2026 | 1233 Shrader St | interior remodel of 2nd and 3rd floors. casework and lightinfg in bedrooms and family room. relocate existing interior bedroom door. replace existing laundry room door, cabinets wsher and dryer in kind. replace tile in bathroom at 3rd floor.Details
interior remodel of 2nd and 3rd floors. casework and lightinfg in bedrooms and family room. relocate existing interior bedroom door. replace existing laundry room door, cabinets wsher and dryer in kind. replace tile in bathroom at 3rd floor. | $83,307 |
| Jul 28, 2025 | Completed final sign-off Dec 2025 | 1330 Masonic Av | in kind window replacement. interior renovations on the 2nd and 3rd floors.including in-kind w/ (n) tempered glazing, add wathersealing to (e) entry doors; new hardwood flooring on 3rd floor & tile floor in primary bathroom; other minor improvements including soundproffing & hvacDetails
in kind window replacement. interior renovations on the 2nd and 3rd floors.including in-kind w/ (n) tempered glazing, add wathersealing to (e) entry doors; new hardwood flooring on 3rd floor & tile floor in primary bathroom; other minor improvements including soundproffing & hvac | $75,000 |
| Jul 28, 2025 | Completed final sign-off Sep 2026 | 650 23rd Av | 1st fl addition of doors for fire ladder access, 2nd fl remodeling of bathroom, kitchen/dining, adding a patio door in play area, replacing door with window in e location, 3rd fl, room changes, adding new windows in new location/existing location, remodel of master bath, bathrooms, addition of bedrmDetails
1st fl addition of doors for fire ladder access, 2nd fl remodeling of bathroom, kitchen/dining, adding a patio door in play area, replacing door with window in e location, 3rd fl, room changes, adding new windows in new location/existing location, remodel of master bath, bathrooms, addition of bedrm | $250,000 |
| Jul 28, 2025 | Completed final sign-off Dec 2025 | 1255 California St | unit 303: remodel (e) kitchen, powder room and bathroom. no changes on exit path. no removal of wallsDetails
unit 303: remodel (e) kitchen, powder room and bathroom. no changes on exit path. no removal of walls | $60,000 |
| Jul 9, 2025 | Completed final sign-off Feb 2026 | 30 Surrey St | replace sheetrock w/ 5/8" type "a" gypsum bd. at wall & & ceiling in garage. remodel (e) bathroom on 1/f, (e) kitchen on 2/f and two (e) bathrooms on 3/f. like for likeDetails
replace sheetrock w/ 5/8" type "a" gypsum bd. at wall & & ceiling in garage. remodel (e) bathroom on 1/f, (e) kitchen on 2/f and two (e) bathrooms on 3/f. like for like | $60,000 |
| Apr 29, 2025 | In progress issued Apr 2025 | 1216 Folsom St | add bath tub in e) bath on 2nd/f. add toilet at e) laundry on 3rd/fDetails
add bath tub in e) bath on 2nd/f. add toilet at e) laundry on 3rd/f | $30,000 |
| Mar 25, 2025 | In progress issued Mar 2025 | 1216 Folsom St | remodel existing master bathroom on 2nd floor in kind., remodel existing bathroom vanities on 3rd floor.Details
remodel existing master bathroom on 2nd floor in kind., remodel existing bathroom vanities on 3rd floor. | $30,000 |
| Dec 11, 2024 | Completed final sign-off May 2026 | 237 04th Av | interior remodel: (n) family room, office, bath, laundry room at 1st floor. remodel kitchen and half bath at 2nd floor, remodel (2) baths at 3rd floor. shared plans w/ pa# 202411205361Details
interior remodel: (n) family room, office, bath, laundry room at 1st floor. remodel kitchen and half bath at 2nd floor, remodel (2) baths at 3rd floor. shared plans w/ pa# 202411205361 | $350,000 |
| Dec 5, 2024 | Completed final sign-off Mar 2026 | 4250 23rd St | attic build out. new connecting stair to habitavke attic floor. new 8'x8' dormer. new skylights. two new windows, replace 3 (e) windows. remodel two bathroom laundry room and closets.Details
attic build out. new connecting stair to habitavke attic floor. new 8'x8' dormer. new skylights. two new windows, replace 3 (e) windows. remodel two bathroom laundry room and closets. | $100,000 |
| Nov 20, 2024 | Completed final sign-off Nov 2025 | 2450 41st Av | kitchen and bath remodel on the upper floor, new bath on lower floor at existing bedroom. internal interior foyer expansion.Details
kitchen and bath remodel on the upper floor, new bath on lower floor at existing bedroom. internal interior foyer expansion. | $125,000 |
| Jul 29, 2024 | Completed final sign-off Jul 2026 | 1590 22nd Av | addition of 836 sf heated area (no addition to building envelope) including new radiant heating, new bathroom, bedroom, study, and exercise room. new connecting stairway between floor levels. remodel kitchen and alter selected walls. infill (e) lightwell (52 sf) as part of kitchen remodel.Details
addition of 836 sf heated area (no addition to building envelope) including new radiant heating, new bathroom, bedroom, study, and exercise room. new connecting stairway between floor levels. remodel kitchen and alter selected walls. infill (e) lightwell (52 sf) as part of kitchen remodel. | $500,000 |
| Jul 19, 2024 | Expired or cancelled expired Mar 2026 | 4250 23rd St | remove walls at living room to open the space. relocated the powder room. shift wall at bedroom 5 and remodel bathroom 4. new foundation at north wall. no change to elevations view from streetDetails
remove walls at living room to open the space. relocated the powder room. shift wall at bedroom 5 and remodel bathroom 4. new foundation at north wall. no change to elevations view from street | $50,000 |
| Jun 4, 2024 | Completed final sign-off Sep 2024 | 928 Diamond St | revision to pa#202404240653 and 202405131984: replace (3) existing 45 min fire rated windows in one bathroom on 2nd floor and two bedrooms on 3rd floor.Details
revision to pa#202404240653 and 202405131984: replace (3) existing 45 min fire rated windows in one bathroom on 2nd floor and two bedrooms on 3rd floor. | $5,000 |
| May 13, 2024 | Completed final sign-off Sep 2024 | 928 Diamond St | 3/f: remodel existing (2) bathrooms of unit 928 in duplex. relocate existing laundry closet from 2/f to 3/f. no exterior work.Details
3/f: remodel existing (2) bathrooms of unit 928 in duplex. relocate existing laundry closet from 2/f to 3/f. no exterior work. | $50,000 |
| Apr 24, 2024 | Completed final sign-off Sep 2024 | 928 Diamond St | remodel extg bathroom with shower pan on 2nd floor in kind.Details
remodel extg bathroom with shower pan on 2nd floor in kind. | $8,000 |
| Jan 23, 2024 | Completed final sign-off Jun 2024 | 178 27th St | renovation on 3rd floor of s.f.d. remodel primary bathroom. add one bathroom. replace exterior doors in kind at front and at rear.Details
renovation on 3rd floor of s.f.d. remodel primary bathroom. add one bathroom. replace exterior doors in kind at front and at rear. | $60,000 |
| Sep 15, 2023 | Completed final sign-off Nov 2023 | 217 Miramar Av | bathroom remodel in kind on second floor in single family dwelling.Details
bathroom remodel in kind on second floor in single family dwelling. | $30,000 |
| Jul 25, 2023 | Completed final sign-off Jun 2024 | 1233 Shrader St | remodel kitchen and baths. new window at rear. not visible from the street. new skylights. no expansion of building opening.Details
remodel kitchen and baths. new window at rear. not visible from the street. new skylights. no expansion of building opening. | $120,000 |
| Jul 3, 2023 | Completed final sign-off Jun 2024 | 615 Mississippi St | remodel (e) kitchen and bathroom, add new half bathroom. replace most windows on 2/f & 3/f. new water heating system, both unit, relocated to garage.Details
remodel (e) kitchen and bathroom, add new half bathroom. replace most windows on 2/f & 3/f. new water heating system, both unit, relocated to garage. | $150,000 |
| Jun 27, 2023 | Completed final sign-off Aug 2024 | 1358 15th Av | within the extg envelope, 1/f- new office, family room, bath, laundry and insulate the garage space; 2/f- kitchen and bath remodel, new windows and doors on the rear of property, remove exterior stair to grade, new interior stair to 1st story, no work on 3/f. new rear deck on grade less than 30".Details
within the extg envelope, 1/f- new office, family room, bath, laundry and insulate the garage space; 2/f- kitchen and bath remodel, new windows and doors on the rear of property, remove exterior stair to grade, new interior stair to 1st story, no work on 3/f. new rear deck on grade less than 30". | $250,000 |
| Mar 1, 2023 | Completed final sign-off Jan 2024 | 722 Duncan St | rev to pa# 2023-0109-9855: install (2) 5'0"x4'0" 60 min fire rated fixed windows on 2nd fl. at the east side of the building remodel (e) bathroom on 3rd fl.Details
rev to pa# 2023-0109-9855: install (2) 5'0"x4'0" 60 min fire rated fixed windows on 2nd fl. at the east side of the building remodel (e) bathroom on 3rd fl. | $20,000 |
| Dec 30, 2022 | Completed final sign-off Nov 2025 | 62 Dolores Tr | renovation of (e) single family home. windows. interior renovation of kitchen, living, bedroom and bathrooms.Details
renovation of (e) single family home. windows. interior renovation of kitchen, living, bedroom and bathrooms. | $500,000 |
| Dec 2, 2022 | Completed final sign-off May 2023 | 38 Surrey St | remodel (e) kitchen, 3- bathrooms, half bath and laundry roomDetails
remodel (e) kitchen, 3- bathrooms, half bath and laundry room | $60,000 |
| Oct 31, 2022 | Completed final sign-off Feb 2023 | 4160 17th St | remodel two bathrooms in kind.Details
remodel two bathrooms in kind. | $50,000 |
| Jun 6, 2022 | Completed final sign-off Aug 2022 | 504 Ellsworth St | bathroom remodeling in kind on second fl. of single family dwellingDetails
bathroom remodeling in kind on second fl. of single family dwelling | $40,000 |
| Apr 6, 2022 | Completed final sign-off Apr 2023 | 17 Hoff St | unit #17: remodeling 1 existing kitchen and 1 bathroom of unit #17 of apartment building.Details
unit #17: remodeling 1 existing kitchen and 1 bathroom of unit #17 of apartment building. | $20,000 |
| Feb 14, 2022 | Completed final sign-off Oct 2022 | 2267 25th Av | revision to pa 2022-0111-5737 add 305 sf in (e) family rm; remodel (e) bathroom & add half bath on 1st fl; upgrade (e) interior stair; add 4'6x19" skylight & 30" high 1 hr er parapet @ north side lightwellDetails
revision to pa 2022-0111-5737 add 305 sf in (e) family rm; remodel (e) bathroom & add half bath on 1st fl; upgrade (e) interior stair; add 4'6x19" skylight & 30" high 1 hr er parapet @ north side lightwell | $150,000 |
| Feb 1, 2022 | Completed final sign-off May 2023 | 182 Flood Av | create (n) family room & bathroom in (e) garage space. to infill under an (e) 2/f space.Details
create (n) family room & bathroom in (e) garage space. to infill under an (e) 2/f space. | $150,000 |
| Jan 13, 2022 | Completed final sign-off Feb 2022 | 28 Winfield St | convert existing 4.2 ft x 4.5ft closet space into half bath with new toilet and sink; perform related electrical, plumbing and tiling work; replace swing door with pocket door.Details
convert existing 4.2 ft x 4.5ft closet space into half bath with new toilet and sink; perform related electrical, plumbing and tiling work; replace swing door with pocket door. | $25,000 |
| Jan 11, 2022 | Completed final sign-off Oct 2022 | 2267 25th Av | kitchen and bathroom remodel on 2nd floor of single family dwelling.Details
kitchen and bathroom remodel on 2nd floor of single family dwelling. | $40,000 |
| Jul 15, 2021 | Expired or cancelled expired May 2026 | 475 28th St | basement addition, addition at kitchen/deck, add bay at rear facade at 2nd level, add 2 powder rooms, remodel 2 bathrooms and kitchen. new ground floor area is 1,198 sq. ft.Details
basement addition, addition at kitchen/deck, add bay at rear facade at 2nd level, add 2 powder rooms, remodel 2 bathrooms and kitchen. new ground floor area is 1,198 sq. ft. | $420,000 |
| Jul 2, 2021 | Never finaled issued Jul 2021, no final | 615 Teresita Bl | revision to app# 202012090642. revision to rear windows, rear railing, crawl space existing plan and bathroom and laundryDetails
revision to app# 202012090642. revision to rear windows, rear railing, crawl space existing plan and bathroom and laundry | |
| Jun 22, 2021 | Completed final sign-off Nov 2025 | 769 Cayuga Av | remodel of exisitng kitchen, bathroom, & entry in second floor of main home, and conversion of existing lower floor garage/storage into one additional bedroom, bathroom & family room. 2 lightwell infills. widen garage door.Details
remodel of exisitng kitchen, bathroom, & entry in second floor of main home, and conversion of existing lower floor garage/storage into one additional bedroom, bathroom & family room. 2 lightwell infills. widen garage door. | $514,198 |
| May 25, 2021 | Completed final sign-off Aug 2021 | 415 Myra Wy | one bathroom remodel, layout and opening will not change. lighting h.e. tile entryway foyer interior and add heating mat approx 100 sq ft extg conditioned space. supplemental heat, 2 kw max, and controlled for 30 minutes.Details
one bathroom remodel, layout and opening will not change. lighting h.e. tile entryway foyer interior and add heating mat approx 100 sq ft extg conditioned space. supplemental heat, 2 kw max, and controlled for 30 minutes. | $30,000 |
| May 7, 2021 | In progress issued Jul 2024 | 3777 22nd St | partial demo (e) rear kitchen extension & deck & (e) interior walls, stairs. excavate portion of (e) storage to allow occupiable headroom @ lower level. addition @ rear yard include extending (e) roof heigh, new windows & new skylights. new walls for interior remodel. 4 bedrooms, 3.5 baths, kitchen,Details
partial demo (e) rear kitchen extension & deck & (e) interior walls, stairs. excavate portion of (e) storage to allow occupiable headroom @ lower level. addition @ rear yard include extending (e) roof heigh, new windows & new skylights. new walls for interior remodel. 4 bedrooms, 3.5 baths, kitchen, | $1,250,000 |
| Mar 31, 2021 | Completed final sign-off May 2022 | 515 Gates St | basement: add 778 sq. ft. of habitable space including bedroom, office, media room and one bath. 1st flr: add stairs to basement and remodel master bath.Details
basement: add 778 sq. ft. of habitable space including bedroom, office, media room and one bath. 1st flr: add stairs to basement and remodel master bath. | $62,000 |
| Mar 29, 2021 | Completed final sign-off Apr 2023 | 17 Hoff St | per ordinance 162-16 -convert (e) garage and storage to two adus and two regular dwelling units. new units within existing building footprint. new units include bedroom, bathroom, and kitchen -soft-story retrofit under permit #201406027201Details
per ordinance 162-16 -convert (e) garage and storage to two adus and two regular dwelling units. new units within existing building footprint. new units include bedroom, bathroom, and kitchen -soft-story retrofit under permit #201406027201 | $150,000 |
| Jan 6, 2021 | Never finaled issued Jan 2021, no final | 615 Teresita Bl | to comply with complaint# 2022071440: (2nd fl) bathroom remodel in kind with change of bathtub to shower.Details
to comply with complaint# 2022071440: (2nd fl) bathroom remodel in kind with change of bathtub to shower. | $10,000 |
| Dec 9, 2020 | Completed final sign-off Jul 2021 | 615 Teresita Bl | remodel with in the (e) building exterior envelope, expand habitable sqft. with in (e) envelope at 1 floor, reconfigure and reodel (e) kitchen and bath (n) 1/2 bath on 1st fl.Details
remodel with in the (e) building exterior envelope, expand habitable sqft. with in (e) envelope at 1 floor, reconfigure and reodel (e) kitchen and bath (n) 1/2 bath on 1st fl. | $110,000 |
| Nov 5, 2020 | Completed final sign-off Jun 2021 | 833 Cayuga Av | remodel one bath, convert another half bath into full master bath. build amaster and entry walk-in closets. infill (e) lightwell not visible from any street or yard and not abutting any adjacent lightwell.Details
remodel one bath, convert another half bath into full master bath. build amaster and entry walk-in closets. infill (e) lightwell not visible from any street or yard and not abutting any adjacent lightwell. | $40,000 |
| Oct 28, 2020 | Completed final sign-off Feb 2021 | 30 Jasper Pl | unit #30: change tub to shower in same location & replace single vanity to double vanity in bathroom. install d/w & g/d in kitchen. replace kitchen cabinets in-kind, countertop & backsplash.Details
unit #30: change tub to shower in same location & replace single vanity to double vanity in bathroom. install d/w & g/d in kitchen. replace kitchen cabinets in-kind, countertop & backsplash. | $20,000 |
| Oct 24, 2020 | Completed final sign-off Apr 2021 | 31 Milton St | one bath remodel & addition of new bathroom.Details
one bath remodel & addition of new bathroom. | $30,000 |
| Sep 11, 2020 | Completed final sign-off Dec 2020 | 248 San Jose Av | master bathroom (~6'x5') remodeling in kind with change of bathtub to shower. same layout.Details
master bathroom (~6'x5') remodeling in kind with change of bathtub to shower. same layout. | $20,000 |
| Sep 11, 2020 | Completed final sign-off Feb 2021 | 24 Jasper Pl | unit #28: bathroom (~6x8') remodel, change bathtub to shower. install dishwasher in kitchen. unit #32: kitchen (~10'x10') remodel & replace vanity in bathroom. all work in kind for both units.Details
unit #28: bathroom (~6x8') remodel, change bathtub to shower. install dishwasher in kitchen. unit #32: kitchen (~10'x10') remodel & replace vanity in bathroom. all work in kind for both units. | $35,000 |
| Jun 1, 2020 | Completed final sign-off Aug 2021 | 1983 San Jose Av | adding adu (487 sq ft) per ord 162-16 on 1st flr. add kitchen and convert family rm, bathroom & laundry on 1st flr to adu. add one-hour fire rated separation wall for entry hallway access to adu. renovation of (e) 1st flr under approved pa #2020-0122-2534 & #2020-0304-6200.Details
adding adu (487 sq ft) per ord 162-16 on 1st flr. add kitchen and convert family rm, bathroom & laundry on 1st flr to adu. add one-hour fire rated separation wall for entry hallway access to adu. renovation of (e) 1st flr under approved pa #2020-0122-2534 & #2020-0304-6200. | $7,000 |
| Feb 6, 2020 | Completed final sign-off Jun 2020 | 1979 San Jose Av | add master bathroom and convert sunroom to bedroom on 3rd fl of single family dwellingDetails
add master bathroom and convert sunroom to bedroom on 3rd fl of single family dwelling | $30,000 |
| Jan 22, 2020 | Completed final sign-off Aug 2020 | 1983 San Jose Av | renovation of (e) single family dwelling, add family room and bathroom (430 sq. ft.) & rear deck (60 sq.f) on 1st fl. add half bath and relocate (e) kitchen on 2nd fl. add master bathroom on 3rd fl.Details
renovation of (e) single family dwelling, add family room and bathroom (430 sq. ft.) & rear deck (60 sq.f) on 1st fl. add half bath and relocate (e) kitchen on 2nd fl. add master bathroom on 3rd fl. | $90,000 |
| Jan 15, 2020 | Completed final sign-off Jun 2020 | 1979 San Jose Av | remodel kitchen (main level) & bathroom (3rd fl) in kind. no structural work. comply w/ cec 150.0 (k).3 & 150.0 (k).5Details
remodel kitchen (main level) & bathroom (3rd fl) in kind. no structural work. comply w/ cec 150.0 (k).3 & 150.0 (k).5 | $30,000 |
| Nov 26, 2019 | Never finaled issued Jan 2021, no final | 833 Cayuga Av | 1st fl remodel, family rm, bath, office, laundry, 4 bedroom. convert 70 sf of garage into living space. new windows at rear. new internal stair, 2nd fl kitchen remodel.Details
1st fl remodel, family rm, bath, office, laundry, 4 bedroom. convert 70 sf of garage into living space. new windows at rear. new internal stair, 2nd fl kitchen remodel. | $150,000 |
| Oct 9, 2018 | Never finaled issued Feb 2022, no final | 436 Eureka St | horizontal expansion @ rear of all levels.(n) interior stair to connect all levels. remodel & reconfigure interior walls throughout per plans. excavate & expand existing garage.(n) doors and windows per elevations, new 2 beds & 2 baths.in ground hot tub location in rear yard.remodel kitchenDetails
horizontal expansion @ rear of all levels.(n) interior stair to connect all levels. remodel & reconfigure interior walls throughout per plans. excavate & expand existing garage.(n) doors and windows per elevations, new 2 beds & 2 baths.in ground hot tub location in rear yard.remodel kitchen | $800,000 |
| Aug 20, 2018 | Never finaled issued Dec 2018, no final | 1012 Chenery St | 1st fl - build a family room, on the ground floor with new 1/2 bath; 2nd fl - rebuild (e) stair & renovate kitchen, new 1/2 bath; 3rd fl - renovate master closet & officeDetails
1st fl - build a family room, on the ground floor with new 1/2 bath; 2nd fl - rebuild (e) stair & renovate kitchen, new 1/2 bath; 3rd fl - renovate master closet & office | $78,585 |
| Jul 18, 2018 | Completed final sign-off Oct 2018 | 1007 Portola Dr | add one master bathroom in an existing bedroom of single family dwelling.Details
add one master bathroom in an existing bedroom of single family dwelling. | $8,000 |
| May 23, 2018 | Completed final sign-off Sep 2023 | 41 Newburg St | expand (e)3rd fl w/ 297 sqft addition & add 313 sq ft roof deck @ 3rd fl level. @ street facade, replace/relocate (1)window, @ rear yard replace (1)window & (1)sliding glass door, relocate (1)window. (n)interior stair, renovate (e)kitchen, renovate (2)bath, add(2)bath. ** maher: n/a **Details
expand (e)3rd fl w/ 297 sqft addition & add 313 sq ft roof deck @ 3rd fl level. @ street facade, replace/relocate (1)window, @ rear yard replace (1)window & (1)sliding glass door, relocate (1)window. (n)interior stair, renovate (e)kitchen, renovate (2)bath, add(2)bath. ** maher: n/a ** | $325,000 |
| May 21, 2018 | Completed final sign-off Jan 2019 | 1007 Portola Dr | 1 kitchen remodel, same layout. 1 bathroom remodel, same layout. no alteration of wall, window and door.Details
1 kitchen remodel, same layout. 1 bathroom remodel, same layout. no alteration of wall, window and door. | $20,000 |
| Nov 10, 2017 | Never finaled issued Nov 2017, no final | 247 Edna St | 3rd floor: bathroom and kitchen remodelDetails
3rd floor: bathroom and kitchen remodel | $20,000 |
| Jun 7, 2017 | Completed final sign-off Dec 2017 | 70 Tingley St | replacement of kitchen cabinets & counter tops, demo bathrooms. this pa is for upstairs work only.Details
replacement of kitchen cabinets & counter tops, demo bathrooms. this pa is for upstairs work only. | $5,000 |