Back to kitchen remodel contractors
Pellandini & Company
- Based in
- Pacifica
- On San Francisco permits
- Oct 2007 to Jun 2022
- Last 24 months
- 0 permits filed
27 permits since 2000: 17 completed, 8 never finaled, 2 expired or cancelled.
Of the 8 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
7 kitchen remodel permits: 3 completed, 3 never finaled, 1 expired or cancelled. Typically 36 days from filing to permit and 122 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 15, 2021 | Completed final sign-off May 2022 | 401 Harrison St | unit 32d: soft demolition of two non-structural interior walls around kitchen. closing of opening between 32c & 32d to restore separate units.Details
unit 32d: soft demolition of two non-structural interior walls around kitchen. closing of opening between 32c & 32d to restore separate units. | $10,000 |
| Jun 29, 2021 | Never finaled issued Oct 2021, no final | 845 Lake St | 4/f unit 15 aka 5: remodel of (e) kitchen and bathroom. new plumbing, electrical and lighting associated with the remodel. no work to be performed in other areas. building does not have a fire sprinkler system.Details
4/f unit 15 aka 5: remodel of (e) kitchen and bathroom. new plumbing, electrical and lighting associated with the remodel. no work to be performed in other areas. building does not have a fire sprinkler system. | $50,000 |
| Feb 11, 2019 | Never finaled issued Feb 2019, no final | 690 Arguello Bl | unit 101:interior remodel to e codo. relocate interior wall and replace door between master bath and master closet, remove interior wall by kitchen, structural interior wall by kitchen, replace add light fixtures, plumbing, wall finishes, floorDetails
unit 101:interior remodel to e codo. relocate interior wall and replace door between master bath and master closet, remove interior wall by kitchen, structural interior wall by kitchen, replace add light fixtures, plumbing, wall finishes, floor | $100,000 |
| Feb 24, 2009 | Never finaled issued Apr 2009, no final | 2884 24th St | reconfigure interior storefront area to create a better floor for the hot food service. installation of exhaust hoods. installation of new flooring. quarry tile at back kitchen area. interior false roof (terra cotta).Details
reconfigure interior storefront area to create a better floor for the hot food service. installation of exhaust hoods. installation of new flooring. quarry tile at back kitchen area. interior false roof (terra cotta). | $65,000 |
| Jan 29, 2009 | Completed final sign-off Apr 2009 | 1200 California St | remodel extg kitchen. removal of a non lead bearing wall between kitchen and dining room. new undercabinet light extg ceiling lights to remain. extg smoke detectors are hard wire. at least 50% high efficacy wattage in kitchen.Details
remodel extg kitchen. removal of a non lead bearing wall between kitchen and dining room. new undercabinet light extg ceiling lights to remain. extg smoke detectors are hard wire. at least 50% high efficacy wattage in kitchen. | $50,000 |
| Jul 28, 2008 | Completed final sign-off Mar 2010 | 562 Arlington St | addition to the back of house - 1st flr & 2nd flr to extend 13'-7" & 3rd flr 5'-5". a partial roof deck is located on top of 2nd flr. add family rm & laundry rm @ 1st floor. remodel kitchen & built in office @ 2nd flr; extension of 2 bedrooms & roof deck @ 3rd floor.Details
addition to the back of house - 1st flr & 2nd flr to extend 13'-7" & 3rd flr 5'-5". a partial roof deck is located on top of 2nd flr. add family rm & laundry rm @ 1st floor. remodel kitchen & built in office @ 2nd flr; extension of 2 bedrooms & roof deck @ 3rd floor. | $100,000 |
| Oct 25, 2007 | Expired or cancelled expired Mar 2011 | 1865 Post St | cosmetic renovation of interior restaurant. refinish (e) bar area, repair damaged light fixtures replace (e) booth with (n), repair hardware in (e) restrooms.replace (e) flooring . no changes to (e) exhaust system in kitchen. (e) sprinkler system to remain unchanged. no changes to ingress, egress.Details
cosmetic renovation of interior restaurant. refinish (e) bar area, repair damaged light fixtures replace (e) booth with (n), repair hardware in (e) restrooms.replace (e) flooring . no changes to (e) exhaust system in kitchen. (e) sprinkler system to remain unchanged. no changes to ingress, egress. | $80,000 |