Back to bathroom remodel contractors
Pellandini & Company
- Based in
- Pacifica
- On San Francisco permits
- Oct 2007 to Jun 2022
- Last 24 months
- 0 permits filed
27 permits since 2000: 17 completed, 8 never finaled, 2 expired or cancelled.
Of the 8 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 1 completed, 2 never finaled. Typically 11 days from filing to permit and 97 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 29, 2021 | Never finaled issued Oct 2021, no final | 845 Lake St | 4/f unit 15 aka 5: remodel of (e) kitchen and bathroom. new plumbing, electrical and lighting associated with the remodel. no work to be performed in other areas. building does not have a fire sprinkler system.Details
4/f unit 15 aka 5: remodel of (e) kitchen and bathroom. new plumbing, electrical and lighting associated with the remodel. no work to be performed in other areas. building does not have a fire sprinkler system. | $50,000 |
| Feb 11, 2019 | Never finaled issued Feb 2019, no final | 690 Arguello Bl | unit 101:interior remodel to e codo. relocate interior wall and replace door between master bath and master closet, remove interior wall by kitchen, structural interior wall by kitchen, replace add light fixtures, plumbing, wall finishes, floorDetails
unit 101:interior remodel to e codo. relocate interior wall and replace door between master bath and master closet, remove interior wall by kitchen, structural interior wall by kitchen, replace add light fixtures, plumbing, wall finishes, floor | $100,000 |
| Feb 27, 2015 | Completed final sign-off Jun 2015 | 112 Ripley St | to complete city & county req for condo conversion. install pressure balance valve (anti scauld) cement boards in showers, in 3 bathrooms. to address fireproofing in garage; install 1 hr gyp on walls, ceiling, address all penetrations in garage & fire rate install exhaust ducting from laundry(dryer)Details
to complete city & county req for condo conversion. install pressure balance valve (anti scauld) cement boards in showers, in 3 bathrooms. to address fireproofing in garage; install 1 hr gyp on walls, ceiling, address all penetrations in garage & fire rate install exhaust ducting from laundry(dryer) | $5,000 |