Back to kitchen remodel contractors
Pederson Construction
- Based in
- San Rafael
- On San Francisco permits
- Sep 2011 to Jul 2018
- Last 24 months
- 0 permits filed
35 permits since 2000: 34 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
14 kitchen remodel permits: 14 completed. Typically 0 days from filing to permit and 128 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 16, 2018 | Completed final sign-off Feb 2019 | 501 Andover St | kitchen remodel. new cabinets, appliances, counter tops. in kind. upgrade electrical in kitchen. everything in same location. no moving of doors and wallsDetails
kitchen remodel. new cabinets, appliances, counter tops. in kind. upgrade electrical in kitchen. everything in same location. no moving of doors and walls | $50,000 |
| Aug 3, 2017 | Completed final sign-off Jan 2018 | 2118 Vallejo St | revision to pa #201707071242. remove wing wall for kitchen cabinetry.Details
revision to pa #201707071242. remove wing wall for kitchen cabinetry. | $5,000 |
| Jul 7, 2017 | Completed final sign-off Jan 2018 | 2118 Vallejo St | remove (e) kitchen cabs/replace with new. replace applicances & plumbing. upgrade recessed cans to led, refinish floorsDetails
remove (e) kitchen cabs/replace with new. replace applicances & plumbing. upgrade recessed cans to led, refinish floors | $125,000 |
| Apr 17, 2017 | Completed final sign-off Sep 2017 | 430 Fell St | kitchen remodel, new kitchen cabinets and counter tops.Details
kitchen remodel, new kitchen cabinets and counter tops. | $40,000 |
| Feb 2, 2017 | Completed final sign-off Apr 2017 | 1669 Page St | kitchen remodel - new counter tops, existing cabinets to remain, new appliances, no structural work.Details
kitchen remodel - new counter tops, existing cabinets to remain, new appliances, no structural work. | $20,000 |
| Nov 23, 2016 | Completed final sign-off Feb 2017 | 368 10th Av | replace kitchen cabinetry, no change to kitchen layout. new countertops. upgrade electrical for kitchen.Details
replace kitchen cabinetry, no change to kitchen layout. new countertops. upgrade electrical for kitchen. | $20,000 |
| Nov 23, 2016 | Completed final sign-off Feb 2017 | 366 10th Av | replace kitchen cabinetry, no change to kitchen layout. new countertops. upgrade electrical for kitchen.Details
replace kitchen cabinetry, no change to kitchen layout. new countertops. upgrade electrical for kitchen. | $20,000 |
| Jul 1, 2015 | Completed final sign-off Oct 2015 | 911 Capp St | reinstall portion wall for #911 & #913. all work in #911, new bath fixtures, move non bearing bathroom partition wall, new kitchen cabinets and counters, add hallway to kitchen. bathroom 5'x8'. kitchen 11'-9" x 8'.Details
reinstall portion wall for #911 & #913. all work in #911, new bath fixtures, move non bearing bathroom partition wall, new kitchen cabinets and counters, add hallway to kitchen. bathroom 5'x8'. kitchen 11'-9" x 8'. | $20,000 |
| Jul 16, 2014 | Completed final sign-off Nov 2014 | 2327 Bay St | kitchen remodel. new cabinets, replace window, back door, new fixtures and appliances. bathroom and powder room remodel, new tile, bath window and powder rm window. new bath vanity, new tile and bath fixturesDetails
kitchen remodel. new cabinets, replace window, back door, new fixtures and appliances. bathroom and powder room remodel, new tile, bath window and powder rm window. new bath vanity, new tile and bath fixtures | $60,000 |
| Jun 27, 2014 | Completed final sign-off Nov 2014 | 2721 Golden Gate Av | new first floor water closet and interior remodel of existing 2nd fl bath and kitchenDetails
new first floor water closet and interior remodel of existing 2nd fl bath and kitchen | $50,000 |
| Apr 30, 2014 | Completed final sign-off Jun 2014 | 1649 Page St | new kitchen cabinets, layout to remain. new kitchen counter top, new bath vanity.Details
new kitchen cabinets, layout to remain. new kitchen counter top, new bath vanity. | $15,000 |
| Apr 3, 2014 | Completed final sign-off Aug 2014 | 95 Mercedes Wy | new kitchen appliances, remove trash compactor and oven and replace with cabinet. lower bath remodel. replace tub with shower stall. move pedestal sink to opposite wall.move non load bearing bathroom wall back 16". replace bath window. new fixtures, tile. sheetrock storage at basement. electricalDetails
new kitchen appliances, remove trash compactor and oven and replace with cabinet. lower bath remodel. replace tub with shower stall. move pedestal sink to opposite wall.move non load bearing bathroom wall back 16". replace bath window. new fixtures, tile. sheetrock storage at basement. electrical | $40,000 |
| Jul 3, 2013 | Completed final sign-off Nov 2013 | 700 Carolina St | kitchen remodel - new appliances, remove 2 walls & put in bar area, replace 1 wall with a 4 x10 header. electrical upgrades, new gas line to the stove, slight modifications to existing cabinetry to accommodate new appliances, cabinetry to remain.Details
kitchen remodel - new appliances, remove 2 walls & put in bar area, replace 1 wall with a 4 x10 header. electrical upgrades, new gas line to the stove, slight modifications to existing cabinetry to accommodate new appliances, cabinetry to remain. | $15,000 |
| Sep 28, 2011 | Completed final sign-off Dec 2011 | 660 Waller St | remodel existing kitchen, replace cabinets, counter top, replace window in kind. install all new florescent & led under cabinet lighting. replace flooring (upper unit).Details
remodel existing kitchen, replace cabinets, counter top, replace window in kind. install all new florescent & led under cabinet lighting. replace flooring (upper unit). | $10,000 |