Back to bathroom remodel contractors
Pederson Construction
- Based in
- San Rafael
- On San Francisco permits
- Sep 2011 to Jul 2018
- Last 24 months
- 0 permits filed
35 permits since 2000: 34 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 9 completed. Typically 0 days from filing to permit and 145 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 5, 2018 | Completed final sign-off Aug 2018 | 547 Douglass St | replace bathroom fixtures. new tub and tile surround. 2 bathrooms, 1 for each unit in kind remodel.Details
replace bathroom fixtures. new tub and tile surround. 2 bathrooms, 1 for each unit in kind remodel. | $12,000 |
| Jun 6, 2017 | Completed final sign-off Dec 2017 | 3733 22nd St | remodel ground fl, interior remodel to include (e) bedroom, (e) full bath, plumbing work in bathroom. electrical work in bedroom, bath & deck.Details
remodel ground fl, interior remodel to include (e) bedroom, (e) full bath, plumbing work in bathroom. electrical work in bedroom, bath & deck. | $15,000 |
| Nov 13, 2015 | Completed final sign-off Apr 2016 | 536 Steiner St | interior remodel of dwelling. new 1st floor room & bath. new spiral stair between 1st and 2nd floor in unit a. new bath in each unitDetails
interior remodel of dwelling. new 1st floor room & bath. new spiral stair between 1st and 2nd floor in unit a. new bath in each unit | $141,000 |
| Jul 1, 2015 | Completed final sign-off Oct 2015 | 911 Capp St | reinstall portion wall for #911 & #913. all work in #911, new bath fixtures, move non bearing bathroom partition wall, new kitchen cabinets and counters, add hallway to kitchen. bathroom 5'x8'. kitchen 11'-9" x 8'.Details
reinstall portion wall for #911 & #913. all work in #911, new bath fixtures, move non bearing bathroom partition wall, new kitchen cabinets and counters, add hallway to kitchen. bathroom 5'x8'. kitchen 11'-9" x 8'. | $20,000 |
| Jul 16, 2014 | Completed final sign-off Nov 2014 | 2327 Bay St | kitchen remodel. new cabinets, replace window, back door, new fixtures and appliances. bathroom and powder room remodel, new tile, bath window and powder rm window. new bath vanity, new tile and bath fixturesDetails
kitchen remodel. new cabinets, replace window, back door, new fixtures and appliances. bathroom and powder room remodel, new tile, bath window and powder rm window. new bath vanity, new tile and bath fixtures | $60,000 |
| Jun 27, 2014 | Completed final sign-off Nov 2014 | 2721 Golden Gate Av | new first floor water closet and interior remodel of existing 2nd fl bath and kitchenDetails
new first floor water closet and interior remodel of existing 2nd fl bath and kitchen | $50,000 |
| Apr 30, 2014 | Completed final sign-off Jun 2014 | 1649 Page St | new kitchen cabinets, layout to remain. new kitchen counter top, new bath vanity.Details
new kitchen cabinets, layout to remain. new kitchen counter top, new bath vanity. | $15,000 |
| Apr 3, 2014 | Completed final sign-off Aug 2014 | 95 Mercedes Wy | new kitchen appliances, remove trash compactor and oven and replace with cabinet. lower bath remodel. replace tub with shower stall. move pedestal sink to opposite wall.move non load bearing bathroom wall back 16". replace bath window. new fixtures, tile. sheetrock storage at basement. electricalDetails
new kitchen appliances, remove trash compactor and oven and replace with cabinet. lower bath remodel. replace tub with shower stall. move pedestal sink to opposite wall.move non load bearing bathroom wall back 16". replace bath window. new fixtures, tile. sheetrock storage at basement. electrical | $40,000 |
| Apr 27, 2012 | Completed final sign-off Dec 2012 | 2402 Washington St | remodel 2 bathrms, guest bathrm, master bathrm, new vanities, countertops, new tub & shower pan, new tile. 3 windows replacements, paint. add wall outlets & switches, wall sconce. plumbing rough in & trim. new toilets, tile tub & shower surround & flrs. wainscott guest bathroom. window not visibleDetails
remodel 2 bathrms, guest bathrm, master bathrm, new vanities, countertops, new tub & shower pan, new tile. 3 windows replacements, paint. add wall outlets & switches, wall sconce. plumbing rough in & trim. new toilets, tile tub & shower surround & flrs. wainscott guest bathroom. window not visible | $20,000 |