Peak Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Oct 2012
- Last 24 months
- 0 permits filed
26 permits since 2000: 22 completed, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 0 days from filing to permit and 74 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 25, 2003 | Completed final sign-off Aug 2003 | 3834 Sacramento St | repair 40% rear stair as per n.o.v. install new handrail. comply with all itemsDetails
repair 40% rear stair as per n.o.v. install new handrail. comply with all items | $2,500 |
| Jul 30, 2001 | Completed final sign-off Mar 2002 | 43 Worth St | repair & replace dry rot damaged stringer; treads and rails on a portion of the front entry stairs,Details
repair & replace dry rot damaged stringer; treads and rails on a portion of the front entry stairs, | $2,600 |
| Nov 16, 2000 | Completed final sign-off Jan 2001 | 25 Divisadero St | repair dry rot damage to existing rear stairs & up grade railings deck to comply with codeDetails
repair dry rot damage to existing rear stairs & up grade railings deck to comply with code | $2,500 |