Back to bathroom remodel contractors
Peak Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Oct 2012
- Last 24 months
- 0 permits filed
26 permits since 2000: 22 completed, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 3 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 133 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 10, 2012 | Completed final sign-off Feb 2013 | 4370 17th St | remodel rental flat. replace bathtub and vanity and kitchen counters. replace (e) french doors to rearyard with vinyl slider, install new forced air gas furnace, upgrade electr, receptacles with new sub panel, cover (e) rear bedroom walls with 5/8 drywall. repair dry rot damage to rear deck and bathDetails
remodel rental flat. replace bathtub and vanity and kitchen counters. replace (e) french doors to rearyard with vinyl slider, install new forced air gas furnace, upgrade electr, receptacles with new sub panel, cover (e) rear bedroom walls with 5/8 drywall. repair dry rot damage to rear deck and bath | $32,500 |
| Mar 4, 2008 | Expired or cancelled expired Jan 2009 | 939 Castro St | remodel existing bathroom. no change to structural walls or window. install new shower stall. reframe existing closet.Details
remodel existing bathroom. no change to structural walls or window. install new shower stall. reframe existing closet. | $18,750 |
| Aug 18, 2004 | Completed final sign-off Nov 2004 | 256 Grand View Av | remodel two (e) bathrooms. no change of interior or exterior walls. no change to windows or exteriorDetails
remodel two (e) bathrooms. no change of interior or exterior walls. no change to windows or exterior | $36,750 |
| Jul 9, 2002 | Never finaled issued Jul 2002, no final | 880 Castro St | complete bathroom remodel, renew 200110231425Details
complete bathroom remodel, renew 200110231425 | |
| Nov 5, 2001 | Completed final sign-off Mar 2002 | 1150 Lombard St | renovate (e) bathroom: remove fixture and replace w/ new, remove tile and replace w/ newDetails
renovate (e) bathroom: remove fixture and replace w/ new, remove tile and replace w/ new | $18,550 |
| Oct 23, 2001 | Expired or cancelled expired Apr 2002 | 880 Castro St | remodel 2 baths in each bath remove existing fixts & replace w/ new remove & replace ceramic tile shDetails
remodel 2 baths in each bath remove existing fixts & replace w/ new remove & replace ceramic tile sh | $22,500 |