Payesko Constructioin Inc
- Based in
- San Rafael
- On San Francisco permits
- Nov 2000 to Jul 2022
- Last 24 months
- 0 permits filed
73 permits since 2000: 48 completed, 10 never finaled, 15 expired or cancelled.
Of the 10 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
8 stairs permits: 3 completed, 3 never finaled, 2 expired or cancelled. Typically 96 days from filing to permit and 191 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 16, 2019 | Never finaled issued Oct 2019, no final | 615 Belvedere St | proposed interior remodel - consisting of expanding kitchen, adding (n) stair to lower floor & reconfigure (e) bathroomsDetails
proposed interior remodel - consisting of expanding kitchen, adding (n) stair to lower floor & reconfigure (e) bathrooms | $150,000 |
| Jul 31, 2013 | Completed final sign-off Apr 2014 | 196 Avila St | renovation of bathroom; reconfiguring of extg lower level to include 2 bedrooms, one bathroom, and living room. revised stair layout configuration and light well, new skylight.Details
renovation of bathroom; reconfiguring of extg lower level to include 2 bedrooms, one bathroom, and living room. revised stair layout configuration and light well, new skylight. | $150,000 |
| Dec 24, 2009 | Completed final sign-off Nov 2012 | 132 16th Av | 3rd. floor addition: 2-bedrooms, 1-bathroom, & master suite with bathroom & dressing area. 2nd. floor; remove wall, add stairs. 1st. floor: enlarge laundry room, move bathroom.Details
3rd. floor addition: 2-bedrooms, 1-bathroom, & master suite with bathroom & dressing area. 2nd. floor; remove wall, add stairs. 1st. floor: enlarge laundry room, move bathroom. | $185,000 |
| Oct 4, 2007 | Never finaled issued May 2008, no final | 624 Parnassus Av | remove (e) non-conforming porch, replace with (n) deck and egress stairs. add french door to deck with sconces & lighting for stairs. all work at the rear.Details
remove (e) non-conforming porch, replace with (n) deck and egress stairs. add french door to deck with sconces & lighting for stairs. all work at the rear. | $10,500 |
| Nov 8, 2005 | Expired or cancelled expired Jul 2009 | 160 Grand View Av | remodel 1 bathroom 2nd /fl. new plumbing, electrical, drywall, tile, fixtures, shower-dryrot repair front porch & stairs. exterior siding repair/less than 50% .Details
remodel 1 bathroom 2nd /fl. new plumbing, electrical, drywall, tile, fixtures, shower-dryrot repair front porch & stairs. exterior siding repair/less than 50% . | $27,000 |
| Mar 27, 2002 | Completed final sign-off May 2002 | 610 29th St | dryrot repair foundation caps,bolting,mudsills,front stairs, bath remodel 2nd floor tile/fixturesDetails
dryrot repair foundation caps,bolting,mudsills,front stairs, bath remodel 2nd floor tile/fixtures | $17,000 |
| May 29, 2001 | Expired or cancelled expired Sep 2001 | 221 Grand View Av | as buildt revision to app#200104025800. replace existing deck-erect wood stairs not concrete. pier dDetails
as buildt revision to app#200104025800. replace existing deck-erect wood stairs not concrete. pier d | $1,000 |
| Nov 9, 2000 | Never finaled issued Apr 2002, no final | 700 03rd Av | replace (new) deck & stair-horizontal additionDetails
replace (new) deck & stair-horizontal addition | $110,000 |