Back to bathroom remodel contractors
Payesko Constructioin Inc
- Based in
- San Rafael
- On San Francisco permits
- Nov 2000 to Jul 2022
- Last 24 months
- 0 permits filed
73 permits since 2000: 48 completed, 10 never finaled, 15 expired or cancelled.
Of the 10 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
21 bathroom remodel permits: 15 completed, 2 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 200 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2022 | Completed final sign-off Sep 2023 | 115 Quintara St | remodel one kitchen, two baths , new plumbing, electrical, insulation, drywall, cabinets, appliances, fixtures, flooring; no change in footprint.Details
remodel one kitchen, two baths , new plumbing, electrical, insulation, drywall, cabinets, appliances, fixtures, flooring; no change in footprint. | $90,000 |
| Feb 3, 2020 | Never finaled issued Feb 2020, no final | 617 Belvedere St | top unit: proposed interior remodel, consisting of expanding kitchen, & reconfigure existing bathroom.Details
top unit: proposed interior remodel, consisting of expanding kitchen, & reconfigure existing bathroom. | $150,000 |
| May 16, 2019 | Never finaled issued Oct 2019, no final | 615 Belvedere St | proposed interior remodel - consisting of expanding kitchen, adding (n) stair to lower floor & reconfigure (e) bathroomsDetails
proposed interior remodel - consisting of expanding kitchen, adding (n) stair to lower floor & reconfigure (e) bathrooms | $150,000 |
| Jan 22, 2018 | Completed final sign-off Jun 2018 | 1041 Lake St | remodel master bathroom replace tub/shower/toilet/faucet, new tile, drywall.Details
remodel master bathroom replace tub/shower/toilet/faucet, new tile, drywall. | $30,000 |
| Dec 5, 2016 | Completed final sign-off Jun 2017 | 2920 Buchanan St | unit #1: remodel of kitchen and 1st floor bath. no change in foot print, no structural. new electrical, plumbing, cabinets, counter, appliances, fixtures, tile, new shower pan, 5/8 rock. no walls moved, removed, added or infilled all existing layouts to remain unchanged.Details
unit #1: remodel of kitchen and 1st floor bath. no change in foot print, no structural. new electrical, plumbing, cabinets, counter, appliances, fixtures, tile, new shower pan, 5/8 rock. no walls moved, removed, added or infilled all existing layouts to remain unchanged. | $65,000 |
| Jul 27, 2016 | Completed final sign-off Sep 2020 | 1315 14th Av | demo (e) porch, add vertical 3rd stories, add 2 stories horironatl rear addition. remodel interior including 2 new baths and 2 additional bedrooms.Details
demo (e) porch, add vertical 3rd stories, add 2 stories horironatl rear addition. remodel interior including 2 new baths and 2 additional bedrooms. | $283,000 |
| Oct 20, 2015 | Expired or cancelled expired Mar 2020 | 2522 Post St | convert garage level into 3rd unit. includes 1 full bathroom, 1 kitchen and 1 bedroom. sprinklers separate permit first floor-- see pre-application minutesDetails
convert garage level into 3rd unit. includes 1 full bathroom, 1 kitchen and 1 bedroom. sprinklers separate permit first floor-- see pre-application minutes | $25,000 |
| Jul 31, 2013 | Completed final sign-off Apr 2014 | 196 Avila St | renovation of bathroom; reconfiguring of extg lower level to include 2 bedrooms, one bathroom, and living room. revised stair layout configuration and light well, new skylight.Details
renovation of bathroom; reconfiguring of extg lower level to include 2 bedrooms, one bathroom, and living room. revised stair layout configuration and light well, new skylight. | $150,000 |
| May 2, 2013 | Completed final sign-off Apr 2014 | 196 Avila St | remodel of kitchen, two baths @ main floor, no structural work, no hcange in footprint, new plumbing, electrical, insulation, drywall, fixtures, cabinets, counter, appliances, flooring, paintDetails
remodel of kitchen, two baths @ main floor, no structural work, no hcange in footprint, new plumbing, electrical, insulation, drywall, fixtures, cabinets, counter, appliances, flooring, paint | $65,000 |
| Apr 5, 2013 | Completed final sign-off Sep 2013 | 75 Hancock St | #3- remodel existing kitchen and 2 baths, new fixtures, cabinets, tiles, drywall, counters, appliances. no structural work.Details
#3- remodel existing kitchen and 2 baths, new fixtures, cabinets, tiles, drywall, counters, appliances. no structural work. | $50,000 |
| Oct 24, 2012 | Expired or cancelled expired Apr 2015 | 437 Diamond St | interior remodel of unit 439, top floor. partition wall framing, no structural. 2 baths, 1 kitchen. new plumbing, elec, drywall, flooring, finishesDetails
interior remodel of unit 439, top floor. partition wall framing, no structural. 2 baths, 1 kitchen. new plumbing, elec, drywall, flooring, finishes | $75,000 |
| Dec 24, 2009 | Completed final sign-off Nov 2012 | 132 16th Av | 3rd. floor addition: 2-bedrooms, 1-bathroom, & master suite with bathroom & dressing area. 2nd. floor; remove wall, add stairs. 1st. floor: enlarge laundry room, move bathroom.Details
3rd. floor addition: 2-bedrooms, 1-bathroom, & master suite with bathroom & dressing area. 2nd. floor; remove wall, add stairs. 1st. floor: enlarge laundry room, move bathroom. | $185,000 |
| Mar 3, 2008 | Completed final sign-off Nov 2008 | 624 Parnassus Av | kitchen remode- new drywall, insulation,cabinets,fixtures,flooring, no structural changes. remodel 1st flr. bath, new tub,fixtures,tile,drywall,flooring.2nd fl. bath. new tub,fixtures,tile,drywall,flooring. no structural changes.Details
kitchen remode- new drywall, insulation,cabinets,fixtures,flooring, no structural changes. remodel 1st flr. bath, new tub,fixtures,tile,drywall,flooring.2nd fl. bath. new tub,fixtures,tile,drywall,flooring. no structural changes. | $95,000 |
| Apr 16, 2007 | Completed final sign-off Oct 2007 | 2323 Fillmore St | remodel (1) kitchen + bath unit#2325 (upstairs) , new elect plumbing, insulation drywall, cabinets, floor fixtures.Details
remodel (1) kitchen + bath unit#2325 (upstairs) , new elect plumbing, insulation drywall, cabinets, floor fixtures. | $40,000 |
| Jul 12, 2006 | Completed final sign-off May 2007 | 6540 Fulton St | remodel bathroom at both units.Details
remodel bathroom at both units. | $37,000 |
| May 26, 2006 | Expired or cancelled expired Mar 2010 | 221 Grand View Av | remodel bathroom on 1st floor, new drywall, toilet, shower, sink, flooring, lighting, paint.Details
remodel bathroom on 1st floor, new drywall, toilet, shower, sink, flooring, lighting, paint. | $11,000 |
| Nov 8, 2005 | Expired or cancelled expired Jul 2009 | 160 Grand View Av | remodel 1 bathroom 2nd /fl. new plumbing, electrical, drywall, tile, fixtures, shower-dryrot repair front porch & stairs. exterior siding repair/less than 50% .Details
remodel 1 bathroom 2nd /fl. new plumbing, electrical, drywall, tile, fixtures, shower-dryrot repair front porch & stairs. exterior siding repair/less than 50% . | $27,000 |
| Sep 23, 2005 | Completed final sign-off Jan 2006 | 3778 20th St | remodel bathrooms 3780 unit a&b - 1 bath in each unit-new drywall, plumbing, electrical, tub,shower,tile & fixtures.Details
remodel bathrooms 3780 unit a&b - 1 bath in each unit-new drywall, plumbing, electrical, tub,shower,tile & fixtures. | $28,000 |
| Apr 20, 2004 | Completed final sign-off Feb 2005 | 3778 20th St | kitchen and bath remodelDetails
kitchen and bath remodel | $26,000 |
| Apr 2, 2003 | Completed final sign-off Jul 2003 | 2212 18th Av | kitchen & bath remodel-new wiring, plumbing, cabinets appliance fixturesDetails
kitchen & bath remodel-new wiring, plumbing, cabinets appliance fixtures | $32,000 |
| Mar 27, 2002 | Completed final sign-off May 2002 | 610 29th St | dryrot repair foundation caps,bolting,mudsills,front stairs, bath remodel 2nd floor tile/fixturesDetails
dryrot repair foundation caps,bolting,mudsills,front stairs, bath remodel 2nd floor tile/fixtures | $17,000 |