Back to bathroom remodel contractors
Paulo De Souza Jr.
- Based in
- Fairfield
- On San Francisco permits
- Aug 2000 to Sep 2016
- Last 24 months
- 0 permits filed
53 permits since 2000: 31 completed, 10 never finaled, 12 expired or cancelled.
Of the 10 never-finaled permits, 10 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 9 completed, 2 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 228 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 22, 2014 | Completed final sign-off May 2015 | 2524 Lombard St | to comply with nov#201407721 dated 11/19/2014: item #2 replaced guestrooms entry doors - 15 min rated; item #8 repair walls, replace damaged bathroom tiles. u-factor for window replacement 0.32. compliance with maher ordinance no 155-13 not required.Details
to comply with nov#201407721 dated 11/19/2014: item #2 replaced guestrooms entry doors - 15 min rated; item #8 repair walls, replace damaged bathroom tiles. u-factor for window replacement 0.32. compliance with maher ordinance no 155-13 not required. | $6,000 |
| May 29, 2014 | Completed final sign-off May 2015 | 1860 Washington St | #402 - remodeling kitchen & bathroom (no changes on the positions of appliances & fixtures), new painting, flooring & new l.e.d. lts on the kitchen & wall light fixtures @ bathroom (hi-eff.)Details
#402 - remodeling kitchen & bathroom (no changes on the positions of appliances & fixtures), new painting, flooring & new l.e.d. lts on the kitchen & wall light fixtures @ bathroom (hi-eff.) | $17,000 |
| Apr 23, 2014 | Never finaled issued Apr 2014, no final | 2166 22nd Av | water damage repair due to bathroom leakage (non structural) - replace drywall and insulation, carpet flooring with new laminated wood flooring; interior paint (lower floor- 2 bedrooms & hallway -family room)Details
water damage repair due to bathroom leakage (non structural) - replace drywall and insulation, carpet flooring with new laminated wood flooring; interior paint (lower floor- 2 bedrooms & hallway -family room) | $6,000 |
| Mar 12, 2009 | Completed final sign-off May 2012 | 47 Tingley St | open st. curb-remove (e) ret. wall for (n) driveway & install (n) ret. wall. remove (e) basement for (n) garage. install (n) fnd. & 2-bedrms. & 2-bath @ basement. replace (e) front stairway. remodel 2nd. story kitchen & install (n) bay winddow & skylight. to comply w/ nov#200735038 & 2008849880.Details
open st. curb-remove (e) ret. wall for (n) driveway & install (n) ret. wall. remove (e) basement for (n) garage. install (n) fnd. & 2-bedrms. & 2-bath @ basement. replace (e) front stairway. remodel 2nd. story kitchen & install (n) bay winddow & skylight. to comply w/ nov#200735038 & 2008849880. | $65,000 |
| Aug 5, 2008 | Completed final sign-off Mar 2009 | 42 Paulding St | to comply w/ nov 200865283, legalize construction of guest bedroom, full bath rm & tv room in garage.Details
to comply w/ nov 200865283, legalize construction of guest bedroom, full bath rm & tv room in garage. | $10,000 |
| Jan 9, 2008 | Expired or cancelled expired Mar 2010 | 47 Tingley St | comply with n.o.v. 200735038 remodel kitchen & bath, removal of plaster from interior walls. upgrade electrical & plumbing & cosmetic.Details
comply with n.o.v. 200735038 remodel kitchen & bath, removal of plaster from interior walls. upgrade electrical & plumbing & cosmetic. | $60,000 |
| Jul 12, 2007 | Never finaled issued Jul 2007, no final | 22 Tucker Av | legalize full bathroom at ground floor bathroom to comply with nov# 200796816Details
legalize full bathroom at ground floor bathroom to comply with nov# 200796816 | $5,000 |
| Apr 10, 2007 | Completed final sign-off Jan 2008 | 1059 Leavenworth St | 1 kchn and 1 bathroom remodeling . replacing kitn cabinets, new hardwood flooring, replace dishwasher machine. replace garbag disposal, replace gas range stove, new lts as per cbc and sbc energy codes, patch and paint walls new tile bath floor and bathtub enclosure. replace bathtub, lavy & toiletDetails
1 kchn and 1 bathroom remodeling . replacing kitn cabinets, new hardwood flooring, replace dishwasher machine. replace garbag disposal, replace gas range stove, new lts as per cbc and sbc energy codes, patch and paint walls new tile bath floor and bathtub enclosure. replace bathtub, lavy & toilet | $10,000 |
| Dec 11, 2006 | Expired or cancelled cancelled Apr 2010 | 419 Holloway Av | legalize construction of workshop room & bathroom at garage levelDetails
legalize construction of workshop room & bathroom at garage level | $17,000 |
| Dec 8, 2006 | Completed final sign-off May 2007 | 2598 Diamond St | install bedroom and bathroom at garage levelDetails
install bedroom and bathroom at garage level | $19,000 |
| Nov 28, 2006 | Completed final sign-off May 2007 | 820 Joost Av | remodel existing bathroom at 2nd fl, project under construction by 200611167925, light fixtures to be flourescent or controlled by occupant sensor. nov taken care under 200611167925Details
remodel existing bathroom at 2nd fl, project under construction by 200611167925, light fixtures to be flourescent or controlled by occupant sensor. nov taken care under 200611167925 | $2,800 |
| Nov 16, 2006 | Completed final sign-off May 2007 | 820 Joost Av | proposed enlarge exiotic bath room at 1st floor with the extg bldg envelope. install a new hall at 1st floor. relocate extg water heater at basement level. comply with nov 200681350 and 200680861Details
proposed enlarge exiotic bath room at 1st floor with the extg bldg envelope. install a new hall at 1st floor. relocate extg water heater at basement level. comply with nov 200681350 and 200680861 | $7,500 |
| Sep 26, 2006 | Completed final sign-off May 2007 | 2598 Diamond St | renew the bathroom, all high efficacy lighting. renew kitchen, 50 % igh efficacy lightingDetails
renew the bathroom, all high efficacy lighting. renew kitchen, 50 % igh efficacy lighting | $20,000 |
| Sep 19, 2006 | Expired or cancelled expired Jan 2008 | 414 Victoria St | legalize work for nov# 200672714 to comply with nov# 200672714-kitchen & bathroom remodel, garage wall construction, wall removal @ rear yard, replace window at rear.Details
legalize work for nov# 200672714 to comply with nov# 200672714-kitchen & bathroom remodel, garage wall construction, wall removal @ rear yard, replace window at rear. | $40,000 |