Paulo De Souza Jr.
- Based in
- Fairfield
- On San Francisco permits
- Aug 2000 to Sep 2016
- Last 24 months
- 0 permits filed
53 permits since 2000: 31 completed, 10 never finaled, 12 expired or cancelled.
Of the 10 never-finaled permits, 10 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 0 days from filing to permit and 11 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 4, 2007 | Completed final sign-off May 2007 | 2598 Diamond St | repair back deck & replace 7'x3', build access door to attic space for furnaces maintenance 30"x30" as teq. by building inspectorDetails
repair back deck & replace 7'x3', build access door to attic space for furnaces maintenance 30"x30" as teq. by building inspector | $5,000 |