Back to kitchen remodel contractors
Paul Mcgrath Generalcontractor
- Based in
- Encinitas
- On San Francisco permits
- Sep 2009 to Mar 2020
- Last 24 months
- 0 permits filed
47 permits since 2000: 45 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
33 kitchen remodel permits: 32 completed, 1 never finaled. Typically 0 days from filing to permit and 74 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 5, 2020 | Completed final sign-off Jun 2020 | 4 Lee Av | remodel kitchen and bathroom in kindDetails
remodel kitchen and bathroom in kind | $35,000 |
| Mar 5, 2020 | Completed final sign-off Jun 2020 | 1401 Guerrero St | remodel kitchen and bathroom in kindDetails
remodel kitchen and bathroom in kind | $17,000 |
| Jan 8, 2020 | Completed final sign-off May 2020 | 707 Guerrero St | remodel kitchen & 2 bathrooms inkind. install new kitchen caibnets, two toilets, two sinks, two sinks disposal, dishwasher, all (e) waslls & opening layout unchanged. maintain 1-hr separationg between units.Details
remodel kitchen & 2 bathrooms inkind. install new kitchen caibnets, two toilets, two sinks, two sinks disposal, dishwasher, all (e) waslls & opening layout unchanged. maintain 1-hr separationg between units. | $65,000 |
| Mar 26, 2019 | Completed final sign-off Jun 2019 | 342 Judson Av | remodel kitchen and 2 baths, in-kindDetails
remodel kitchen and 2 baths, in-kind | $100,000 |
| Dec 17, 2018 | Completed final sign-off Feb 2019 | 90 Cumberland St | unit 1: remodel in kind kitchen and bath. new electrical + subpanel upgrade.Details
unit 1: remodel in kind kitchen and bath. new electrical + subpanel upgrade. | $38,000 |
| Jul 24, 2018 | Completed final sign-off Feb 2019 | 62 Fair Oaks St | kitchen and bath remodel to upper unit. add ply to various open walls, add skylkight (kitchen).Details
kitchen and bath remodel to upper unit. add ply to various open walls, add skylkight (kitchen). | $35,000 |
| Jun 28, 2018 | Completed final sign-off Oct 2018 | 149 Andover St | remodel kitchen in-kind. install kitchen door, replace wood siding at rear kitchen wall due to dry rot.Details
remodel kitchen in-kind. install kitchen door, replace wood siding at rear kitchen wall due to dry rot. | $30,000 |
| Jun 4, 2018 | Completed final sign-off Aug 2018 | 1237 23rd Av | kitchen remodel in kind. replace three new windows in kind, same size, same location. not visible from streetDetails
kitchen remodel in kind. replace three new windows in kind, same size, same location. not visible from street | $37,000 |
| Jan 5, 2018 | Completed final sign-off Mar 2018 | 895 Burnett Av | unit #6: remodel in-kind, bathroom and kitchen. no change of (e) layout.Details
unit #6: remodel in-kind, bathroom and kitchen. no change of (e) layout. | $35,000 |
| Nov 17, 2016 | Completed final sign-off Jan 2017 | 121 Day St | remodel unit 205. replace bathroom bath-tub, toilet vanity, add exhaust fan, kitchen: replace cabinets, sink, disposal, fridge, dishwasher & stove, add subpanel for new circuits, 3 can lights in kitchen, 6 led lights in living room.Details
remodel unit 205. replace bathroom bath-tub, toilet vanity, add exhaust fan, kitchen: replace cabinets, sink, disposal, fridge, dishwasher & stove, add subpanel for new circuits, 3 can lights in kitchen, 6 led lights in living room. | $39,000 |
| Aug 16, 2016 | Completed final sign-off May 2017 | 1637 Taylor St | unit #1, 2nd floor kitchen remodel - structural work at kitchen space, to remove wall, remove (e) rear wall to patio & replace rear window in-kind due to dryrot & interior foundation.Details
unit #1, 2nd floor kitchen remodel - structural work at kitchen space, to remove wall, remove (e) rear wall to patio & replace rear window in-kind due to dryrot & interior foundation. | $40,000 |
| Aug 5, 2016 | Completed final sign-off Dec 2016 | 2114 Leavenworth St | add elec. washer & dryer in closet in hallway. replace in kind kitchen counters , stove dishwasher, disposal , microwave & faucet.Details
add elec. washer & dryer in closet in hallway. replace in kind kitchen counters , stove dishwasher, disposal , microwave & faucet. | $19,000 |
| Jun 15, 2016 | Completed final sign-off Aug 2016 | 1093 Dolores St | unit #2: remodel kitchen & bathroom in kind, replace 3 windows not visible from street in living room. rewire unit add sub panel. replace existing gas furnace in basement in kind. add bedroom closet.Details
unit #2: remodel kitchen & bathroom in kind, replace 3 windows not visible from street in living room. rewire unit add sub panel. replace existing gas furnace in basement in kind. add bedroom closet. | $64,000 |
| Jan 11, 2016 | Completed final sign-off May 2016 | 64 Fair Oaks St | remodel kitchen & bathroom in kind, cabinets , appliances, counters, new shower , toilet,vanity. replace 2 bathroom windows in kind not visible from the street (rear of property) new high efficiency forxed air furnaceDetails
remodel kitchen & bathroom in kind, cabinets , appliances, counters, new shower , toilet,vanity. replace 2 bathroom windows in kind not visible from the street (rear of property) new high efficiency forxed air furnace | $64,000 |
| Sep 8, 2015 | Completed final sign-off Mar 2016 | 1547 34th Av | remodel kitchen i nkind - install new kitchen cabinets, counters, appliances, new hardwood floor in kind, install 7 new winows, not visible from street, none in bedrooms.Details
remodel kitchen i nkind - install new kitchen cabinets, counters, appliances, new hardwood floor in kind, install 7 new winows, not visible from street, none in bedrooms. | $36,000 |
| Mar 17, 2015 | Completed final sign-off Jul 2015 | 151 Buchanan St | parital kitchen remodel in kind. new base cabinets, counters, sink disposal, dish washer, tile floors, washer hookup. repaint kit. no structuaral work.Details
parital kitchen remodel in kind. new base cabinets, counters, sink disposal, dish washer, tile floors, washer hookup. repaint kit. no structuaral work. | $36,000 |
| Mar 17, 2015 | Never finaled issued Mar 2015, no final | 1024 Chenery St | kitchen remodel in kind. new cabinets, sink disposal, dish washer, lighting, new floor & repairs. no structural work. replace one kitchen window in kinds (wood window)Details
kitchen remodel in kind. new cabinets, sink disposal, dish washer, lighting, new floor & repairs. no structural work. replace one kitchen window in kinds (wood window) | $28,000 |
| Jun 26, 2014 | Completed final sign-off Aug 2014 | 134 28th St | #1- remodel kitchen & bathroom, upgrade electrical, replace cabinets, appliances, fixtures. replace windows (4 total) to match existing vinyl.Details
#1- remodel kitchen & bathroom, upgrade electrical, replace cabinets, appliances, fixtures. replace windows (4 total) to match existing vinyl. | $25,000 |
| Jun 4, 2014 | Completed final sign-off Aug 2014 | 174 Downey St | remodel unit in kind replace kitchen & bath (n) exit fan w/humistat install new windows double glass with low e. in (e) openings, vinyl in rear&lightwell rewire unit to meet code 8 windows not visible from st, all (n) lighting shall be led florescent all (n) windows max. u factor 0.40Details
remodel unit in kind replace kitchen & bath (n) exit fan w/humistat install new windows double glass with low e. in (e) openings, vinyl in rear&lightwell rewire unit to meet code 8 windows not visible from st, all (n) lighting shall be led florescent all (n) windows max. u factor 0.40 | $35,000 |
| Apr 18, 2014 | Completed final sign-off Jun 2014 | 121 Day St | kitchen remodel at unit 102. remove e wall between kitchen and living room. replace (e) window "in-kind" @ living room.Details
kitchen remodel at unit 102. remove e wall between kitchen and living room. replace (e) window "in-kind" @ living room. | $10,000 |
| Aug 19, 2013 | Completed final sign-off Oct 2013 | 134 28th St | remodel upper level front unit (#3) kitchen and bath replace entirely new appliances, open wall between kitchen and living. add plywood to bathroom wall. replace unit #3 (5) windows from aluminum to vinyl.Details
remodel upper level front unit (#3) kitchen and bath replace entirely new appliances, open wall between kitchen and living. add plywood to bathroom wall. replace unit #3 (5) windows from aluminum to vinyl. | $15,000 |
| Jul 10, 2013 | Completed final sign-off Jan 2014 | 37 Ford St | remodel kitchen in kind, replace cabinets one wall. replace sink disposal, dish washer. counter top, tile walls, and install new wood floor. rewire kitchen.Details
remodel kitchen in kind, replace cabinets one wall. replace sink disposal, dish washer. counter top, tile walls, and install new wood floor. rewire kitchen. | $20,000 |
| Jul 8, 2013 | Completed final sign-off Aug 2013 | 134 28th St | remodel unit #2 (at middle level) kitchen and bath. remove non bearing kitchen wall. add plywood to walls, reinforce extg. upper level floor joist.Details
remodel unit #2 (at middle level) kitchen and bath. remove non bearing kitchen wall. add plywood to walls, reinforce extg. upper level floor joist. | $15,000 |
| Feb 26, 2013 | Completed final sign-off May 2013 | 666 Guerrero St | remodel unit kitchen cabinets, new bath room tub, toilet, sink, new windows to match existing front of building wood, total of 4 windows. 5 vinyl windows @ side & rear with low e. bedroom to meet egress, replace gas wall heater, rewire unit.Details
remodel unit kitchen cabinets, new bath room tub, toilet, sink, new windows to match existing front of building wood, total of 4 windows. 5 vinyl windows @ side & rear with low e. bedroom to meet egress, replace gas wall heater, rewire unit. | $64,000 |
| Nov 29, 2012 | Completed final sign-off Jan 2013 | 221 21st Av | remodel kitchen and bathroom in kind. upgrade electric in unit #1. install kitchen cabinets new bathtub and valve. re-tile bathroom. install (11) new vinyl max u-factor + 0.40 windows. add exhaust fans to bathroom and toilet.kitchen & bathroom shall comply with cec 150(k)b,10Details
remodel kitchen and bathroom in kind. upgrade electric in unit #1. install kitchen cabinets new bathtub and valve. re-tile bathroom. install (11) new vinyl max u-factor + 0.40 windows. add exhaust fans to bathroom and toilet.kitchen & bathroom shall comply with cec 150(k)b,10 | $55,000 |
| Jul 24, 2012 | Completed final sign-off Sep 2012 | 660 Guerrero St | remodel unit, new kitchen cabinets, new bathroom tub, sink & toilet, 4 new wood windows in front living room, double glass, 5 vinyl windows @ rear & side of bldg, replace wall heater (gas), demo closet in hallway & close up. rewire unit, refinish floor & paint. windows visable from street (wood),Details
remodel unit, new kitchen cabinets, new bathroom tub, sink & toilet, 4 new wood windows in front living room, double glass, 5 vinyl windows @ rear & side of bldg, replace wall heater (gas), demo closet in hallway & close up. rewire unit, refinish floor & paint. windows visable from street (wood), | $64,000 |
| May 11, 2012 | Completed final sign-off Jul 2012 | 143 Monterey Bl | revision to (e) permit to remodel kitchen and 2 bath in-kind. add new 6x6 sliding door to yard from existing guest bedroom also upgrade existing bath wall at garage to have foundation and playwood. orig 201205079934Details
revision to (e) permit to remodel kitchen and 2 bath in-kind. add new 6x6 sliding door to yard from existing guest bedroom also upgrade existing bath wall at garage to have foundation and playwood. orig 201205079934 | $1,500 |
| May 7, 2012 | Completed final sign-off Jul 2012 | 143 Monterey Bl | remodel kitchen and two bathrooms in kind. kitchen no structural work,Details
remodel kitchen and two bathrooms in kind. kitchen no structural work, | $38,000 |
| Apr 5, 2011 | Completed final sign-off Jun 2011 | 134 28th St | remodel unit# 4 ( upper level, rear unit) kitchen and bath. replace cabs, fixtures, appliances. minor ceiling joist correction work. add plywood to (e) wall. remove non bearing wall at kitchen, replace (e) windows w/ double panel, windows are not visible from streetDetails
remodel unit# 4 ( upper level, rear unit) kitchen and bath. replace cabs, fixtures, appliances. minor ceiling joist correction work. add plywood to (e) wall. remove non bearing wall at kitchen, replace (e) windows w/ double panel, windows are not visible from street | $12,500 |
| Feb 24, 2011 | Completed final sign-off Jun 2011 | 1093 Dolores St | remodel kitchen and bath of 1 unit "3" upper level. remove wall, install beam. replace all appliances.Details
remodel kitchen and bath of 1 unit "3" upper level. remove wall, install beam. replace all appliances. | $25,000 |
| Feb 14, 2011 | Completed final sign-off Jun 2011 | 1093 Dolores St | remodel unit a 1st floor. kitchen and bath. remove 10 ft of bearing wall, new footiing to accomodate new beam. repair 2 existing windows, replace if necessary, dryrot. replace plumbing and elec at kitchen and bath remodelsDetails
remodel unit a 1st floor. kitchen and bath. remove 10 ft of bearing wall, new footiing to accomodate new beam. repair 2 existing windows, replace if necessary, dryrot. replace plumbing and elec at kitchen and bath remodels | $23,000 |
| Jul 26, 2010 | Completed final sign-off Oct 2010 | 664 Guerrero St | install new kitchen cabinets, replace bathroom with new toilet, tub & vanity, install fan, upgrade electric service, new panel, repaint unit, new lighting comply cec 150(k), no structural work.Details
install new kitchen cabinets, replace bathroom with new toilet, tub & vanity, install fan, upgrade electric service, new panel, repaint unit, new lighting comply cec 150(k), no structural work. | $34,000 |
| Sep 23, 2009 | Completed final sign-off Feb 2010 | 172 Downey St | unit 172-a - remodel kitchen&bathroom.Details
unit 172-a - remodel kitchen&bathroom. | $47,000 |