Permit GraphShortlistSan Francisco building permits since 2000

Paul Kantos

Contractor license
472789
State license record
Based in
Santa Barbara
On San Francisco permits
Nov 2013 to May 2023
Last 24 months
0 permits filed

5 permits since 2000: 5 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Kitchen remodel permits

AllDeck 1Kitchen remodel 2Bathroom remodel 2

2 kitchen remodel permits: 2 completed. Typically 0 days from filing to permit and 141 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jul 26, 2022Completed
final sign-off Sep 2022
347 Hamilton Stinstall new kitchen sink, dishwasher and receptacles. repalce gas furnace and water heater and replace tub/shower fixtures, vanity and toilet.
Details
Permit
202207269341
Status
complete
Filed
Jul 26, 2022
Permit issued
Jul 26, 2022
Final sign-off
Sep 15, 2022
Declared cost
$10,000
Address
347 Hamilton St

install new kitchen sink, dishwasher and receptacles. repalce gas furnace and water heater and replace tub/shower fixtures, vanity and toilet.

Open the permit page

$10,000
Nov 5, 2013Completed
final sign-off Jun 2014
120 Conrad Stchange out bath fixture tile floor and walls for 2 bathrooms. change out kitchen contertop & sink lighting to comply with cec 150(k)
Details
Permit
201311051143
Status
complete
Filed
Nov 5, 2013
Permit issued
Nov 5, 2013
Final sign-off
Jun 24, 2014
Declared cost
$3,500
Address
120 Conrad St

change out bath fixture tile floor and walls for 2 bathrooms. change out kitchen contertop & sink lighting to comply with cec 150(k)

Open the permit page

$3,500