Block 7553, lot 041
120 Conrad St
- City’s use
- Single Family Residential
- Built
- 1938
- Stories
- 2
- Units
- 1
- Rooms
- 5 bedrooms, 2 bathrooms
- Building
- 1,866 sq ft
- Lot
- 1,946 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 18, 2019 | Completed final sign-off Oct 2019 | 120 Conrad St | revise 201908169099 change to post constructionDetails
revise 201908169099 change to post construction | ||
| Aug 16, 2019 | Completed final sign-off Oct 2019 | 120 Conrad St | replace partial foundation in front & sides flanking garage doorsDetails
replace partial foundation in front & sides flanking garage doors | $10,000 | |
| Jan 8, 2014 | Completed final sign-off May 2014 | 120 Conrad St | revision to appl #2013.10.15.9262 - cut out portion of existing rim joist to fit in psl with strap to (e) rim joist strap (mstc40).Details
revision to appl #2013.10.15.9262 - cut out portion of existing rim joist to fit in psl with strap to (e) rim joist strap (mstc40). | ||
| Nov 5, 2013 | Completed final sign-off Jun 2014 | 120 Conrad St | Paul Kantos | change out bath fixture tile floor and walls for 2 bathrooms. change out kitchen contertop & sink lighting to comply with cec 150(k)Details
change out bath fixture tile floor and walls for 2 bathrooms. change out kitchen contertop & sink lighting to comply with cec 150(k) | $3,500 |
| Oct 15, 2013 | Completed final sign-off May 2014 | 120 Conrad St | voluntary strenghtening ) holdowns steel strong walls lateral bracing holdowns all thread rods thorugh several floors to basement garage, all to reinforce rear of house,also installing replacement windows & sliding glass door (not visible from the st)Details
voluntary strenghtening ) holdowns steel strong walls lateral bracing holdowns all thread rods thorugh several floors to basement garage, all to reinforce rear of house,also installing replacement windows & sliding glass door (not visible from the st) | $2,000 | |
| May 7, 2003 | Completed final sign-off May 2003 | 120 Conrad St | Better Properties Inc | upper floor only- install vinyl siding (3) sides approx 900 sq.ft.Details
upper floor only- install vinyl siding (3) sides approx 900 sq.ft. | $4,800 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Better Properties Inc, Paul Kantos
- Engineers
- Marvin L. Kenney (3)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.