Palacios Construction
- Based in
- Oakdale
- On San Francisco permits
- Jul 2018 to May 2026
- Last 24 months
- 3 permits filed
14 permits since 2000: 11 completed, 1 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 2 completed, 1 in progress. Typically 202 days from filing to permit and 334 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 27, 2026 | In progress issued May 2026 | 75 San Jacinto Wy | interior remodel including kitchen remodel, 3 bathroom remodels, 1 new bathroom, interior stair replacement, replace windows through out. windows that can be seen from the street are being replaced in- kind with new wood windows to match existing insulate all exterior wallsDetails
interior remodel including kitchen remodel, 3 bathroom remodels, 1 new bathroom, interior stair replacement, replace windows through out. windows that can be seen from the street are being replaced in- kind with new wood windows to match existing insulate all exterior walls | $513,093 |
| Nov 25, 2020 | Completed final sign-off Aug 2022 | 420 38th Av | new wood deck at rear of sinlge family home, with stair to grade. no change to building area.Details
new wood deck at rear of sinlge family home, with stair to grade. no change to building area. | $20,000 |
| May 13, 2020 | Completed final sign-off Nov 2021 | 734 23rd Av | remodel (e) kitchen & baths. add (n) bath on 2nd fl. relocate 1st fl powder rm . (n) bath & laundry on ground fl. turn ground fl stairs direction. upgrade main electr panel. add subpanel on 2nd fl. (n) wh & furnace. reinforce structural component, add piers on grnd fl, replace main sewerDetails
remodel (e) kitchen & baths. add (n) bath on 2nd fl. relocate 1st fl powder rm . (n) bath & laundry on ground fl. turn ground fl stairs direction. upgrade main electr panel. add subpanel on 2nd fl. (n) wh & furnace. reinforce structural component, add piers on grnd fl, replace main sewer | $150,000 |