Back to bathroom remodel contractors
Palacios Construction
- Based in
- Oakdale
- On San Francisco permits
- Jul 2018 to May 2026
- Last 24 months
- 3 permits filed
14 permits since 2000: 11 completed, 1 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 7 completed, 1 in progress. Typically 1 days from filing to permit and 213 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 27, 2026 | In progress issued May 2026 | 75 San Jacinto Wy | interior remodel including kitchen remodel, 3 bathroom remodels, 1 new bathroom, interior stair replacement, replace windows through out. windows that can be seen from the street are being replaced in- kind with new wood windows to match existing insulate all exterior wallsDetails
interior remodel including kitchen remodel, 3 bathroom remodels, 1 new bathroom, interior stair replacement, replace windows through out. windows that can be seen from the street are being replaced in- kind with new wood windows to match existing insulate all exterior walls | $513,093 |
| Jun 10, 2025 | Completed final sign-off Jan 2026 | 107 24th Av | remodel existing bathroom in the 3rd floor like for like adjust existing sconces, keep existing steam unit. add new pendent light in ceiling. replace double vanity.Details
remodel existing bathroom in the 3rd floor like for like adjust existing sconces, keep existing steam unit. add new pendent light in ceiling. replace double vanity. | $30,000 |
| Dec 30, 2024 | Completed final sign-off Mar 2025 | 17 San Andreas Wy | remodel (e) guest bathroom (#4), relocate shower area, upgrade electrical & plumbing as needed; remove (e) tub in master bathroom (#1), install (n) vanities to accomodate electrical & plumbing. relocate (e) laundry using (e) closet to accomodate machines plumbing & electrical as neededDetails
remodel (e) guest bathroom (#4), relocate shower area, upgrade electrical & plumbing as needed; remove (e) tub in master bathroom (#1), install (n) vanities to accomodate electrical & plumbing. relocate (e) laundry using (e) closet to accomodate machines plumbing & electrical as needed | $30,000 |
| Dec 19, 2023 | Completed final sign-off Aug 2024 | 40 Loraine Ct | g/f: convert 404sf of garage into living space to create a new mudroom, a bedroom, a bathroom and a study. 2/f: convert one full bath and one half bath into 2 full bathrooms.Details
g/f: convert 404sf of garage into living space to create a new mudroom, a bedroom, a bathroom and a study. 2/f: convert one full bath and one half bath into 2 full bathrooms. | $120,000 |
| Nov 24, 2020 | Completed final sign-off Jul 2022 | 420 38th Av | remodel kitchen & 2 bathrooms. replace 7 existing windows not visible from street. add 1 new door & 2 new windows not visible from street.Details
remodel kitchen & 2 bathrooms. replace 7 existing windows not visible from street. add 1 new door & 2 new windows not visible from street. | $60,000 |
| May 13, 2020 | Completed final sign-off Nov 2021 | 734 23rd Av | remodel (e) kitchen & baths. add (n) bath on 2nd fl. relocate 1st fl powder rm . (n) bath & laundry on ground fl. turn ground fl stairs direction. upgrade main electr panel. add subpanel on 2nd fl. (n) wh & furnace. reinforce structural component, add piers on grnd fl, replace main sewerDetails
remodel (e) kitchen & baths. add (n) bath on 2nd fl. relocate 1st fl powder rm . (n) bath & laundry on ground fl. turn ground fl stairs direction. upgrade main electr panel. add subpanel on 2nd fl. (n) wh & furnace. reinforce structural component, add piers on grnd fl, replace main sewer | $150,000 |
| Nov 19, 2018 | Completed final sign-off Feb 2019 | 1475 Jackson St | remodel e kitchen and laundry installing new elec. replace cabinets same location reinstall appliances, move fridge to laundry area, replace floor, replace toilet and vanity in existing bath, replace e wall furnace. same location in hallway. no wall changesDetails
remodel e kitchen and laundry installing new elec. replace cabinets same location reinstall appliances, move fridge to laundry area, replace floor, replace toilet and vanity in existing bath, replace e wall furnace. same location in hallway. no wall changes | $25,000 |
| Jul 3, 2018 | Completed final sign-off Dec 2018 | 722 23rd Av | remodel (e) kitchen, 1 and 1/2 baths, new main water line, electrical upgrade, new water heater, add new bathroom to master bedroomDetails
remodel (e) kitchen, 1 and 1/2 baths, new main water line, electrical upgrade, new water heater, add new bathroom to master bedroom | $95,000 |